Connect with us

Space & Satellites

Lockheed Martin JOINS Payload to Test Robotic Welding on the ISS

Lockheed Martin’s JOINS payload will test laser and friction stir welding on the ISS, with NASA estimating the demonstration for March 2027.

Published

on

Lockheed Martin JOINS Payload to Test Robotic Welding on the ISS
Photo: NASA

Lockheed Martin’s JOining Demonstrations IN-Space (JOINS) payload will test robotic welding of aluminum and stainless steel aboard the International Space Station (ISS), using both laser beam welding and friction stir welding, according to a NASA technology page published on November 22, 2026. NASA lists Northrop Grumman CRS-25 as the payload’s next flight, with an estimated launch date of November 2026 and an estimated demonstration date of March 2027.

The project grew out of a $9.1 million award to Lockheed Martin in NASA’s 2023 Tipping Point selections, which described the work as “in-space component joining and inspection technologies.” Neither that selection notice nor Lockheed Martin’s August 16, 2023, feature on the award named a joining process; NASA’s November 22, 2026, page specifies the two welding methods and the two metals. NASA says in-space joining would let large structures be assembled and integrated after launch rather than being limited by the size and volume of a launch vehicle.

How the JOINS demonstration will work

NASA describes two approaches. In laser beam welding, a high-precision laser melts and fuses the material, a method NASA says works well for small, thin or detailed parts where heat exposure to the surrounding material should be limited. In friction stir welding, a rotating tool stirs the metals together without melting them. Friction generates enough heat to soften the material without liquefying it, which NASA says can create stronger joints and reduce the cracking or warping that can occur when some metals melt and re-solidify.

The demonstrations will take place inside the Voyager Bishop Airlock aboard the station, according to NASA’s captions for images credited to Lockheed Martin, which show the JOINS payload entering a mockup of the airlock in Houston, Texas, in April 2025. NASA’s mission table gives the objective as “Demonstrate robotic welding in exposed space.” Onboard cameras will monitor the work and send data back to Earth, and the physical test articles will return to Earth months later for in-person inspection and further study.

NASA says space conditions differ from those on Earth in ways that matter for welding: vacuum, microgravity and extreme temperature fluctuations can affect heat transfer, material behavior, robotic operations and welding processes. Testing in space, the agency says, helps demonstrate feasibility, mature readiness for operational use and build confidence for future missions.

From a 2023 Tipping Point award to the station

NASA announced its 2023 Tipping Point selections in July 2023, choosing 11 U.S. companies under its sixth Tipping Point opportunity to develop technologies for long-term exploration on the Moon and in space. NASA expected to contribute a total of $150 million through milestone-based, funded Space Act Agreements lasting up to four years, issued by its Space Technology Mission Directorate (STMD), with each company paying a minimum share of the total project cost based on its size.

Lockheed Martin of Littleton, Colorado, received $9.1 million to demonstrate in-space component joining and inspection technologies for structural, electrical and fluid systems. NASA said at the time that the capability would reduce risk and advance the maturity and reliability of in-space assembly architectures. NASA’s November 2026 JOINS page lists the Research and Technology Mission Directorate (RTMD) as the responsible mission directorate and Lockheed Martin as the lead organization.

In its August 16, 2023, feature on the award, Lockheed Martin said JOINS would deliver an in-space joining module payload to the ISS, integrate it within the Bishop Airlock, expose it to the space environment while the joining demonstrations run, and return test articles to Earth for study and analysis. Robert Biggs, JOINS program manager at Lockheed Martin, said the company sees “in-space joining demonstrations as critical” as it looks to build infrastructure at the Moon, Mars and beyond. He said the aim was to verify joining integrity for future applications, including lunar surface infrastructure, orbital persistent platforms and space-system elements such as antennas, solar arrays, sunshades, optical systems and radiators.

The ride: Northrop Grumman’s CRS-25 Cygnus XL

NASA’s event page for Northrop Grumman CRS-25, last updated November 10, 2026, lists the launch as no earlier than November 29, 2026. Northrop Grumman, which calls the flight NG-25, says its Cygnus XL spacecraft, named the S.S. James “Jim” A. Lovell in honor of the astronaut, will launch on a SpaceX Falcon 9 from Space Launch Complex 40 at Cape Canaveral Space Force Station in Florida and reach the station about two days after launch with 11,000 pounds (about 4,990 kilograms) of scientific investigations and cargo.

Neither mission page lists individual payloads or mentions JOINS; the flight assignment comes from NASA’s JOINS page. The company’s CRS-24 flight, the NG-24 Cygnus XL mission, launched on a Falcon 9 from the same pad on April 11, 2026, carrying more than 11,000 pounds of scientific investigations and cargo, according to NASA. Northrop Grumman says it has delivered more than 169,000 pounds of supplies, experiments and equipment to the station since 2013.

What in-space joining is meant to enable

NASA says in-space joining is essential for building and repairing future space infrastructure, such as large antennas, solar arrays, radiators, sunshades and optical systems, that will support exploration of the Moon and Mars. Structures can be packaged efficiently for launch and assembled once in space, which NASA says makes it possible to build structures too large, complex or costly to fit in a single launch vehicle. Lockheed Martin’s 2023 feature cited reduced mass and development cost, shorter schedules and lower technical risk compared with large deployable systems.

Over the longer term, NASA says in-space joining could eventually be used to assemble infrastructure from materials derived from resources on the Moon, Mars, asteroids and other planetary bodies, and that combining in-situ resource utilization (ISRU), in-space manufacturing and joining technologies could reduce reliance on launching equipment and materials from Earth. The next steps on NASA’s schedule are the CRS-25 launch, no earlier than November 29, 2026, the demonstration, estimated for March 2027, and the return of the test articles for inspection.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Click to comment

Leave a Reply

Space & Satellites

Nammo UK Completes RELIANCE Engine Hot-Fire Tests for ESA Argonaut

Nammo UK’s RELIANCE engine for ESA’s Argonaut lunar lander throttled from 50% to 100% in prototype hot-fire tests.

Published

on

Nammo UK Completes RELIANCE Engine Hot-Fire Tests for ESA Argonaut
Photo: Nammo UK

Nammo UK has completed the prototype hot-fire test campaign for RELIANCE, the main landing engine for Argonaut, the European Space Agency (ESA) lunar lander, with the first prototype throttling from 50% to 100%. The programme has also passed its Preliminary Design Review Board (PDR), and the company has scheduled its Engineering Model build and test campaign for 2027.

Nammo UK, based at Westcott Venture Park in Buckinghamshire, announced the result at Space Tech Expo Europe in Bremen, in a press release dated November 13, 2026. The engine now has to move from prototype to a qualified flight engine for a lander whose first mission ESA plans for 2030, and Nammo Space said it aims to bring RELIANCE into service within three years.

What the prototype demonstrated

According to Nammo UK, the first prototype met key performance requirements. It throttled from 50% to 100% and showed strong combustion efficiency and stability across that range, which the company said helps the Argonaut lander land precisely and safely.

RELIANCE is a bi-propellant engine with 6 kN (kilonewtons) of thrust. It uses a pintle injector, electrically driven centrifugal pumps and an integrated engine controller, runs on hypergolic propellants and builds on Nammo’s LEROS engine family. The company describes it as the first electrically pump-fed, dual-propellant, regeneratively cooled monomethylhydrazine (MMH) and mixed oxides of nitrogen (MON) in-space engine to demonstrate deep throttling in hot-fire testing.

Passing the PDR confirms the design’s maturity, the company said. Ludovic Duvet, ESA’s Argonaut Team Leader, said “RELIANCE is a key technology step for Europe” and that the engine could also serve future lunar return and other exploration missions. He noted that Nammo UK leads the work with expertise from across Europe.

From prototype to qualification

Robert Selby, Vice President of Nammo Space, said in the release:

“The successful completion of the RELIANCE prototype hot-fire test campaign represents a major development milestone”

Selby said the next phase will mature the design, improve performance and complete qualification, with the aim of bringing RELIANCE into service within three years.

Risk reduction work is already under way ahead of the 2027 Engineering Model campaign. Nammo UK listed continued hot-fire testing with existing hardware to validate the engine control logic, a Risk Reduction Model to refine assembly and train staff, manufacturing process maturation and component-level testing.

Where the Argonaut programme stands

Argonaut is ESA’s route to independent European access to the Moon. In an update published November 20, 2025, ESA said the first mission is planned for 2030. Landers will launch on Ariane 6 rockets, each delivering up to 1.5 tonnes of cargo to the lunar surface, including scientific instruments, rovers and supplies such as food, water and air for astronauts. Nammo UK’s release says Argonaut will support NASA’s Artemis programme by delivering cargo, infrastructure and science payloads.

The first lander, the Lunar Descent Element (LDE), is led by Thales Alenia Space, a joint venture of Thales (67%) and Leonardo (33%). In a press release dated January 30, 2025, Thales Alenia Space said it had signed a contract with ESA worth €862 million for the design, development and delivery of the LDE, including responsibility for mission design and integration. At that point the company said Argonaut was planned to launch from the 2030s.

In its November 20, 2025 update, ESA said agreements signed at the LUNA analogue facility at its European Astronaut Centre (EAC) near Cologne, Germany, which houses a full-scale Argonaut model, completed the LDE industrial team. ESA listed the roles as follows:

  • Thales Alenia Space Italy: prime contractor and system integrator, responsible for assembling and testing the lander’s structure.
  • Thales Alenia Space France: the data-handling subsystem and on-board computers.
  • OHB System AG, Germany: guidance, navigation and control, telecommunications, electrical power systems, solar arrays and batteries.
  • Thales Alenia Space United Kingdom: the propulsion subsystem and procurement of major components such as propellant tanks.
  • Nammo United Kingdom: design and supply of the lander’s main engine.

The LEROS record behind RELIANCE

RELIANCE draws on engines Nammo has already flown. Firefly Aerospace’s Blue Ghost, which Nammo describes as the first commercial lunar lander, landed on the Moon in March 2025 using a LEROS 4 engine, and NASA’s Juno mission to Jupiter used a LEROS 1b engine. In 2024, Nammo UK supplied the propulsion system for Astroscale’s ADRAS-J, which, according to the company, took the first image of space debris using rendezvous and proximity operations.

RELIANCE combines that LEROS heritage with electrically driven pumps and deep throttling, the capability the prototype campaign has now demonstrated. With the PDR passed, the 2027 Engineering Model campaign and qualification are the next steps Nammo UK has named on the way to service entry.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Space & Satellites

NASA and Florida Unveil CAPEWEEK Expo at Kennedy Space Center

CAPEWEEK, a new aerospace and technology expo backed by NASA and Florida, debuts at Kennedy Space Center from March 27 to April 2, 2028.

Published

on

NASA and Florida Unveil CAPEWEEK Expo at Kennedy Space Center
Photo: CAPEWEEK

NASA, the state of Florida and Space Florida are backing CAPEWEEK, a new annual aerospace and technology expo that will open on the former Space Shuttle runway at NASA’s Kennedy Space Center from March 27 through April 2, 2028. The organizers say the event is designed to grow to accommodate more than 500,000 people a year, and an initial analysis cited in the release projects an estimated $5 billion in economic impact for Florida over the first decade.

The expo was announced on November 6, 2026, in a press release distributed through GlobeNewswire and onstage at Kennedy Space Center with NASA Administrator Jared Isaacman, CAPEWEEK Mission Commander Cyrus Sigari, Space Florida President and CEO Rob Long and U.S. Representative Mike Haridopolos, a Florida Republican. According to the release, CAPEWEEK is being developed by NASA, the state of Florida, Space Florida and CAPEWEEK.

How the first CAPEWEEK is organized

The CAPEWEEK website splits the first edition into three parts. A Leadership Forum from March 27 to 29, 2028, will bring executives, investors and government officials together to discuss commercial opportunities in aerospace, superintelligence, energy, autonomy, robotics and advanced mobility. Industry Days from March 29 to 31 will offer exhibition halls, chalets, static displays and flying demonstrations, followed by Public Days on Saturday, April 1, and Sunday, April 2.

The release says CAPEWEEK will bring together companies in aerospace, defense, superintelligence, energy, autonomy, robotics and advanced mobility across land, sea, air and space, from rockets and fighter jets to autonomous ships, electric vehicles and delivery drones. The website lists ten demonstration segments: Airshow, Space, Defense, Airliners, Advanced Mobility, Autonomy, Super Intelligence, Robotics, Energy and Maritime.

The exposition aims to be an American venue for major product introductions and commercial agreements, according to the release. NASA will showcase new aircraft, autonomous vehicles, spacecraft, rovers and technologies in support of the event.

What the partners said

Isaacman said in the release that “America should have a place where the people building the future can come together.” He called the runway where the Space Shuttle returned from orbit a fitting location and said CAPEWEEK would give hundreds of thousands of visitors a front-row seat to American innovation.

Florida Governor-elect Byron Donalds said: “Florida launched the first space race, and Florida is going to win the next one.” He said he wants Florida to be the world headquarters of space exploration, with good-paying jobs for welders, electricians, machinists, technicians and pilots. Secretary of the Air Force Troy Meink pointed to the long partnership between NASA and the Department of the Air Force and said the event would “celebrate our legacy of exploration” and strengthen the industrial base.

Sigari said “America is the techno-aerospace republic” and that CAPEWEEK gives the country its own stage alongside the world’s great air shows. Long said the runway that once brought orbiters home is now the front door for companies building America’s future in space, adding: “Our job is to make sure the deals started here get done.” Haridopolos said the event will bring investment and local business opportunities:

“There’s no better place to showcase the future of aerospace than right here on the Space Coast.”

The runway and the site behind the expo

The Shuttle Landing Facility was built in 1974 for shuttles returning to Kennedy and opened for flights in 1976, according to NASA, which describes the concrete runway as 15,000 feet long and 300 feet wide, able to support all types and sizes of aircraft and horizontal launch and landing vehicles. The CAPEWEEK release and website give its length as 15,001 feet.

Space Florida, which the release describes as the state’s aerospace finance and development authority, operates the site under a 30-year property agreement that NASA announced on June 22, 2015. Kennedy director Bob Cabana said at the time: “Following the final space shuttle landing in 2011, the site has transformed into a multi-user facility.” Now called the Launch and Landing Facility, it handled over 400 landings and departures in 2023, according to Space Florida.

Space Florida lists Amazon Leo, which runs a satellite processing facility there, among the site’s users, along with Lockheed Martin for Orion heat shield deliveries and United Launch Alliance for rocket stage deliveries. The CAPEWEEK website describes the venue as a 4,000-acre launch and landing facility next to a visitor complex that receives more than 1.5 million visitors a year.

How the target compares with established shows

The release presents the 500,000 figure as the size the event is designed to grow to accommodate, not as an attendance forecast for 2028, and it does not say how many exhibitors or trade visitors the organizers expect. For scale, the 55th Paris Air Show in June 2025 recorded 305,000 unique visitors, including 141,000 trade visitors and 164,200 members of the general public, with 2,400 exhibitors from 48 countries, according to a June 23, 2025, report by the French Aerospace Industries Association (GIFAS). In the United States, the Experimental Aircraft Association (EAA) counted approximately 734,000 attendees at AirVenture Oshkosh 2026, its highest total on record, with 1,021 commercial exhibitors.

The economic figures measure different things. CAPEWEEK’s $5 billion covers Florida over a decade, including the year-round development the event anchors, and comes from an initial analysis that the release says was benchmarked against the world’s leading aerospace shows and major U.S. events; the release does not name who carried it out. EAA puts AirVenture’s economic impact at $257 million for the five counties of the Oshkosh region, based on a 2025 University of Wisconsin Oshkosh study. EAA has scheduled AirVenture 2028 for July 24 to July 30, several months after CAPEWEEK’s first edition.

From MAX POWER to 2028

CAPEWEEK was announced ahead of MAX POWER, the two-day tech expo and air show that NASA is holding at Kennedy on November 7 and 8, 2026, in honor of America’s 250th anniversary. AirPro News covered the event when NASA announced the MAX POWER expo in August. NASA’s event page describes three ticketed parks run with outside collaborators: the Air Dot Show air show, the UP.Summit technology showcase and the Kennedy Space Center Visitor Complex. NASA says tickets are sold through each partner’s website because the event relies on their funding and structure.

According to the release, aerospace and technology leaders were to join NASA, Florida and U.S. government officials for a commemoration at Kennedy Space Center later on November 6. The CAPEWEEK website invites companies to exhibit, sponsor or partner through a contact form, and neither it nor the release names exhibitors or sponsors.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Launch Activities

Isar Aerospace Takes Over Launch Complex at Spaceport Nova Scotia

Isar Aerospace takes operational control of its launch complex at Spaceport Nova Scotia, with first Spectrum launches targeted for 2028.

Published

on

Isar Aerospace Takes Over Launch Complex at Spaceport Nova Scotia
Photo: Isar Aerospace

Isar Aerospace has taken operational responsibility for a dedicated launch complex at Spaceport Nova Scotia and has started construction of its own launch pad in Canada, the German launch company and Maritime Launch Services (MLS) announced on November 21, 2026. The Atlantic coast site will be Isar’s second launch site and its first in North America, with first orbital launches of its Spectrum launch vehicle targeted for 2028.

In a joint press release dated November 21, 2026, issued from Halifax, the companies described the handover as a milestone in their partnership. Isar will develop, build and operate a complex for Spectrum that includes a final assembly line and a payload preparation facility. The handover of a designated launch pad was one of three conditions written into the facilities usage agreement the two companies signed in July 2026.

What Isar takes over in Nova Scotia

According to the November 21 release, the dedicated launch complex is transferring to Isar, which now takes operational responsibility for its own launch infrastructure on Canadian soil. Construction is starting on what will become Isar’s dedicated launch pad in Canada. The release did not give a date for the transfer or a construction schedule beyond the 2028 target for first orbital launches.

Under the July contract, MLS provides the licensed launch site, including the launch pad, assembly, integration and testing (AIT) facilities, a launch operations center and a facility for payload integration. The companies said in July that the site would be designed to support frequent launches, with potential for additional capacity, and that Isar had set up a Canadian entity, Isar Aerospace Canada Inc., for its North American presence.

In the release, Stella Guillen, Chief Commercial Officer of Isar Aerospace, spoke of “a decisive step closer to launching from Canadian soil.” She said the company’s ambition goes beyond building a launch site, to advancing Canada’s space ecosystem together with MLS and establishing sovereign access to orbit as a lasting national capability.

Stephen Matier, President and CEO of Maritime Launch Services, described the handover as an important step in developing Spaceport Nova Scotia. He said Isar’s investment advances sovereign launch capability, strengthens allied cooperation and brings foreign direct investment and jobs to Nova Scotia and surrounding communities.

How the agreement reached this point

The two companies signed a letter of intent in May 2026. The contract followed on July 7, 2026, when Daniel Metzler, Chief Executive Officer of Isar Aerospace, and Matier signed it in Ankara, Türkiye, during the NATO Summit Defence Industry Forum (NSDIF), according to a joint release issued that day.

The July release set out the commercial terms. The facilities usage agreement has a 10-year term, and Isar has the right to renew it for two additional 5-year terms. MLS receives quarterly payments of US$3.75 million for the term, except during a 30-month fee waiver period that begins at the end of the first year, when no quarterly payments are made. The companies said the period after the waiver reflects the operational phase of the complex. Isar also pays additional fees per launch, on a cost-plus basis, for certain services.

The agreement was made conditional on three milestones: a statement of work (SOW) and certain programmatic milestones agreed by September 1, 2026; handover of the designated launch pad to Isar by November 1, 2026; and completion of additional infrastructure at the spaceport by December 31, 2027. On September 1, the companies extended the first deadline by 14 days, moving the statement of work deadline to September 15, 2026. MLS announced on September 14, 2026, that the SOW and programmatic milestones had been finalized, and said they did not change the key terms of the July agreement.

Matier said in the September 14 release that “Finalizing the statement of work and programmatic milestones moves us directly into execution,” and that the next phase of construction was underway on site.

Where Isar and the spaceport stand

Isar Aerospace was founded in 2018 and is headquartered near Munich, Germany, with over 400 employees across 5 international locations. It develops, manufactures and tests its launch vehicles almost entirely in-house and offers launch services for small and medium-sized satellites and satellite constellations. Its first launch site is at Andøya, Norway.

In September 2026, Isar reached orbit on its second Spectrum flight, a qualification flight named Mission ‘Onward and Upward’ that MLS said delivered all payloads to orbit. Isar describes itself as the first European commercial space company to deliver satellites into orbit. The same month it signed a launch agreement with US-based SEOPS for five additional launches. The November 21 release said Isar is ramping up production at its purpose-built factory near Munich, which has capacity for 40 vehicles per year, and is expanding its global launch site network.

Spaceport Nova Scotia is developed by Maritime Launch Services Inc. near the rural communities of Canso, Hazel Hill and Little Dover. The July release called it Canada’s first licensed commercial orbital launch site. According to the November 21 release, the multi-user site’s Atlantic coast location gives over-ocean launch trajectories and access to mid- to high-inclination and polar orbits for Earth observation, communications and defence missions. MLS says it will let launch vehicles place satellites into low Earth orbit across inclinations from 45 to 98 degrees.

Government backing and what comes next

The companies said Isar’s investment aligns with Canada’s Defence Industrial Strategy and the Canadian Space Launch Act, which both identify sovereign launch capability as a national priority. David J. McGuinty, Canada’s Minister of National Defence, said in the release that “Canada must have the ability to launch and protect the capabilities we depend on.” He said the partnership between MLS and Germany’s Isar Aerospace is a step toward a sovereign space-launch capability in Canada that will strengthen national security and deepen defence cooperation with Germany.

Colton LeBlanc, Nova Scotia’s Minister of Growth, Development and Defence Industries, congratulated the two companies and said the launch infrastructure will create high-value opportunities for Nova Scotians.

The third condition in the July agreement is the completion of additional infrastructure at the spaceport by December 31, 2027. In July, the companies said Isar’s launch operations were expected to begin ramping up in 2028, with the potential to support up to 40 launches annually by 2029.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Advertisement

Follow Us

AirPro Atlas

Explore aviation on one 3D globe
4,000+ airports, 700+ active airlines, 180+ launch pads and 30 aircraft plants and boneyards, with live weather and launch countdowns.
Open the Atlas

aviation newsletter

Latest

Categories

Tags

Popular News