Connect with us

Defense Contracts

Boeing Wins Air Force Contract for 15 More KC-46A Pegasus Tankers

Boeing has a U.S. Air Force contract for 15 more KC-46A tankers, bringing the total on contract or in service to 203. Value not disclosed.

Published

on

Boeing Wins Air Force Contract for 15 More KC-46A Pegasus Tankers
Photo: Boeing

Boeing has been awarded a U.S. Air Force contract for 15 additional KC-46A Pegasus tankers, the company announced on November 24, 2026. Boeing said the award brings the number of KC-46A multi-mission aerial refuelers on contract or in service worldwide to 203, but its release did not give the contract’s value, production lot or delivery schedule.

In a press release dated November 24, 2026, from Everett, Washington, Boeing said the global total includes 116 tankers delivered to the U.S. Air Force, six to the Japan Air Self-Defense Force (JASDF) and two to the Israeli Air Force. The order matches the size of the $2.47 billion Lot 12 award that Boeing announced on November 25, 2025, which also covered 15 aircraft.

What Boeing said about the new award

“We’re grateful for the trust the U.S. Air Force continues to place in our team,” said Jake Kwasnik, KC-46 program vice president. Kwasnik said the KC-46 plays an important role in enabling military operations worldwide and that Boeing looks forward to building on that partnership while staying focused on delivering on its commitments to support the warfighter.

According to the release, the U.S. Air Force KC-46A fleet has exceeded 180,000 flight hours since the first KC-46A Pegasus was delivered in 2019, reflecting high utilization across training, operational sorties and global deployment missions. Boeing said the tanker can be reconfigured quickly for a range of missions, including humanitarian assistance and disaster relief, and is frequently used to carry critical supplies, citing recent support for the Denton Humanitarian Assistance Program.

The company also tied the aircraft to strategic deterrence and readiness. It pointed to recent bilateral training between the U.S. Air Force and the JASDF as an example of the tanker’s role in the Indo-Pacific, and to long-range missions, including deployments from Travis Air Force Base to Japan, as evidence of its ability to extend reach, support allies and sustain readiness for theater-wide operations by the Air Force and the Air National Guard.

The release does not state the contract’s value, contract number or production lot, and it gives no delivery dates for the 15 aircraft.

How the program has moved since the Lot 12 contract

Boeing’s release of November 25, 2025, described a Lot 12 contract for 15 additional KC-46A tankers valued at $2.47 billion. At that point, the company counted 183 KC-46A aircraft on contract or in service globally, including 98 delivered to the U.S. Air Force, six to the JASDF and four contracted for the Israel Air Force. The U.S. fleet had then exceeded 150,000 flight hours.

Placed side by side, the two releases show how far the program moved in a year. Deliveries to the U.S. Air Force stood at 116 in Boeing’s November 2026 count, against 98 in November 2025, and the fleet’s flight hours passed 180,000, against 150,000. The Israeli Air Force, which had four aircraft contracted in Boeing’s 2025 count, is listed in the 2026 release with two delivered. AirPro News reported in August 2025 on Israel’s plan to add more tankers.

“Getting on contract helps ensure production stability,” Kwasnik, identified in the 2025 release as vice president and KC-46 program manager, said at the time. He said that award also supported the long-lead supply chain and continued delivery of the KC-46A’s capability. Boeing said then that recent contracts, including a July 2024 award for mission readiness and performance upgrades, were improving the tanker’s communications, data connectivity and situational awareness.

Where the tanker is flying

Boeing’s release links to official accounts of two of the missions it describes. A Defense Visual Information Distribution Service (DVIDS) image page titled “Travis AFB sends KC-46 across the Pacific to train with Misawa F-16s” shows Capt. Quinn Sturgis, 60th Air Mobility Wing readiness chief, and Capt. Jeff Schafer, 9th Air Refueling Squadron pilot, flying a KC-46A Pegasus during an off-station training flight near Misawa Air Base, Japan, on June 3, 2025. The caption says the aircraft crossed the Pacific Ocean and refueled aircraft on arrival in Japanese airspace. AirPro News covered a fleet delivery milestone at Travis in December 2025.

The New Hampshire Air National Guard’s 157th Air Refueling Wing put its KC-46A through a nuclear operational readiness exercise from February 5 to 8, 2026, according to a National Guard article by Senior Master Sgt. Timothy Huffman published on February 10, 2026. Lt. Col. Ryan Cunningham, the exercise director and commander of the 133rd Air Refueling Squadron, said the exercise was a major step in reactivating nuclear deterrence capabilities at Pease Air National Guard Base, a mission set that had lapsed when the wing divested its KC-135 fleet in 2019.

The article says the 157th is an initial operational test and evaluation unit and that the KC-46 Weapons System Council tasked it with developing a cold-weather plan for this type of operation. Wind chill dropped the feels-like temperature to lower than 15 below zero during the exercise, and the wing’s safety office reported no cold-related injuries. “The New Hampshire Air National Guard plays a large part in protecting our country,” said Col. Brian Carloni, commander of the 157th Air Refueling Wing.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Click to comment

Leave a Reply

Defense Contracts

USSOCOM Awards Boeing MH-47G Chinook Order With Work Through 2031

USSOCOM awarded Boeing a $197,279,932 order modification for MH-47G Chinooks, with work in Ridley Park expected to run to September 2031.

Published

on

USSOCOM Awards Boeing MH-47G Chinook Order With Work Through 2031
Photo: Boeing

U.S. Special Operations Command (USSOCOM) has awarded Boeing a $197,279,932 order modification for MH-47G Chinook special operations helicopters, with the work at Boeing’s site in Ridley Park, Pennsylvania, expected to be completed by September 2031. The full amount was obligated at the time of award, and the announcement does not say how many aircraft the order covers.

The award was listed in the U.S. Department of War’s contract announcements for November 23, 2026. The department described it as a firm-fixed-price order modification (W91215-16-G-0001 H9224126FE001) “for procurement of MH47G rotary wing aircraft in support of U.S. Special Operations Command.” Boeing said in March 2025 that the Army already had 51 MH-47G Block II aircraft under contract.

What the November 23 announcement says

According to the announcement, the order is funded with fiscal 2027 Defense-wide procurement funds and Army aircraft procurement funds, and all $197,279,932 was obligated when the order was awarded. USSOCOM, at MacDill Air Force Base, Florida, is the contracting authority, and Ridley Park is named as the primary place of performance.

The notice is short. It gives no aircraft count, no delivery schedule and no split between newly built and remanufactured helicopters.

Where the MH-47G Block II program stands

The MH-47G fleet belongs to U.S. Army Special Operations Aviation Command (USASOAC), and Boeing has been building MH-47G Block II aircraft for it in lots. In a press release dated June 13, 2019, Boeing said a $194 million contract covered a second lot of MH-47G Block II aircraft, with deliveries starting in 2021, and that it was then on contract for 15 MH-47G Block II Chinooks. Chuck Dabundo, vice president and MH-47 program manager, said in that release: “Nearly a quarter of the Special Ops fleet is now on contract for Block II.”

On September 1, 2020, Boeing announced that its Philadelphia team had delivered the first MH-47G Block II Chinook to USSOCOM on time. The company said it was on contract for 23 more after signing a contract with the command in July 2020. Andy Builta, vice president and H-47 program manager, said: “This delivery marks a major step for the Chinook program.”

Boeing said on August 1, 2024, that USASOAC had awarded it a $115 million contract in June 2024 to produce two more MH-47G Block II aircraft and begin advanced procurement on future helicopters, bringing the total under contract to 46. On March 27, 2025, it announced a $240 million USASOAC contract to remanufacture five more, with deliveries scheduled to begin in 2027, and put the total under contract at 51.

Fleet completion and the new end date

In the March 2025 release, Boeing said it anticipated completing the entire USASOAC Chinook fleet in early 2030. The work under the November 23 order is expected to be completed by September 2031, according to the Department of War. The announcement does not explain how the new order relates to that earlier timeline.

What Block II brings

Boeing says the Chinook Block II configuration adds a strengthened structure, redesigned fuel tanks, an improved drivetrain and an open avionics architecture, which the company says increase lift, extend range and allow future upgrades. For the MH-47G Block II, Boeing has described a reinforced airframe, redesigned fuel tanks and what it calls “state-of-the-art avionics,” in a design intended to keep the helicopter flying for decades.

Boeing says the wider H-47 Chinook family is acquired by the U.S. Army, U.S. Special Operations Command and 20 international countries. The company said in August 2024 that USASOAC’s Chinook modernization program supports more than 20,000 jobs and 360 suppliers in 40 states. AirPro News has also covered other Army Chinook contracts in 2026, including the April order for CH-47F Block II Chinooks, Collins Aerospace’s Chinook avionics contract and Honeywell’s Chinook engine overhaul contract.

A second Boeing award on the same list

The same November 23 announcement included an $11,743,132 Air Force modification (P00194) for Boeing in Tukwila, Washington, for VC-25B unique parts repair under contract FA8625-16-C-6599. The department said the modification raises the contract’s cumulative face value from $4,508,429,742 to $4,520,172,874, with the work at Joint Base San Antonio, Texas, expected to be completed before delivery of the aircraft. Fiscal 2027 research, development, test and evaluation funds of $750,000 were obligated at award, and the Air Force Life Cycle Management Center at Wright-Patterson Air Force Base, Ohio, is the contracting activity.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Defense Contracts

Leonardo Signs Long-Term C-27J Support Deal With Peruvian Air Force

Leonardo will provide spares, repair and overhaul, engineering, training and logistics for the Peruvian Air Force’s C-27J Spartan fleet.

Published

on

Leonardo Signs Long-Term C-27J Support Deal With Peruvian Air Force
Photo: Leonardo

Leonardo and the Peruvian Air Force, the Fuerza Aérea del Perú (FAP), have signed a long-term Follow-On Support (FOS) agreement for the service’s C-27J Spartan fleet, the company announced in Lima on November 23, 2026. Leonardo will supply spare parts, repair and overhaul, maintenance planning, engineering support, fleet status monitoring, training and logistics management.

Peru’s C-27J fleet is still growing. In May 2026 the FAP ordered a fifth C-27J, with delivery to its Grupo 8 expected in 2027, according to Leonardo. The November release does not disclose the support agreement’s value or duration.

What the support agreement includes

Under the agreement, Leonardo will provide a full range of support services intended to improve the fleet’s mission response and effectiveness. According to the release, they include:

  • technical and field service support;
  • spare parts, and repair and overhaul services;
  • maintenance planning and engineering support;
  • fleet status monitoring;
  • training activities and logistics management.

Leonardo said the services will provide timely technical support and efficient supply chain performance to keep the aircraft ready for critical operations. The company said the agreement combines its knowledge as the C-27J’s manufacturer with the FAP’s experience of operating the aircraft across Peru, from the Pacific coast to the Andes and the Amazon.

Why Peru relies on its C-27Js

Leonardo said reliable, responsive air transport is particularly important for Peru, which has faced natural disasters including floods, landslides and earthquakes. In 2025, heavy rain and flooding affected more than 57,000 people, damaged infrastructure and made some remote communities difficult to reach, the release said, and an earthquake in the Lima-Callao area showed the importance of rapid response airlift and emergency support.

According to Leonardo, the C-27J has supported humanitarian and disaster relief operations, medical evacuations, the transport of emergency teams and supplies, and the rapid deployment of government response teams to isolated areas. The company pointed to the aircraft’s ability to operate from short and unprepared airstrips and in demanding environmental conditions.

The FAP began C-27J operations in 2015. As of early 2026, its fleet had logged almost 16,000 flight hours, carried out nearly 600 medical evacuation (MEDEVAC) missions and transported almost 240,000 people and 9,000 tons of cargo, according to a Leonardo release dated May 14, 2026.

A growing fleet and local support capability

That May release announced Peru’s order for a fifth C-27J, placed as part of the FAP’s air mobility enhancement programme. The order brought the number of C-27Js acquired by Peru to five. The new aircraft will be the first in Peru with the C-27J Next Generation configuration, which Leonardo said introduces new avionics and aerodynamic enhancements.

The Peruvian programme also carries offset benefits, according to Leonardo. The company said localized support capabilities, built by transferring technology expertise through autonomous maintenance and the establishment of training centers, have helped stimulate Peru’s national aeronautical industry. The November agreement, Leonardo said, reinforces its commitment to support Peru’s aerospace and defence capabilities through long-term cooperation, knowledge sharing and technical collaboration.

Peru’s May order was the 100th C-27J procured worldwide, Leonardo said at the time. In its November release, the company said the aircraft is operated by 22 countries, with more than 100 aircraft ordered and close to 300,000 flying hours.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Defense Contracts

Leonardo DRS Wins NAVAIR Production Contract for DAIRCM System

NAVAIR awarded Leonardo DRS a three-year IDIQ contract for low-rate initial production of the AN/AAQ-45 DAIRCM survivability system.

Published

on

Leonardo DRS Wins NAVAIR Production Contract for DAIRCM System
Photo: Leonardo

Naval Air Systems Command (NAVAIR) has awarded Leonardo DRS a three-year indefinite-delivery/indefinite-quantity (IDIQ) contract for low-rate initial production (LRIP) of the AN/AAQ-45 Distributed Aperture Infrared Countermeasure (DAIRCM) aircraft survivability system. The award takes DAIRCM out of the Engineering and Manufacturing Development (EMD) phase that NAVAIR funded in 2020 and into production.

Leonardo DRS announced the contract in a press release dated November 10, 2026. The release does not state the contract’s value, the number of systems to be produced or the aircraft types that will receive them.

What the production contract covers

Under the contract, Leonardo DRS will provide hardware production, aircraft integration, systems engineering, program management and associated logistics support. According to the company, DAIRCM hardware will be manufactured at its facilities in Dallas, Texas, and San Diego, California, while aircraft integration and logistics work will be carried out at its Fort Walton Beach, Florida, site.

Leonardo DRS describes DAIRCM as a combat-proven, lightweight survivability suite for small- and medium-sized aircraft with demanding size, weight and integration requirements. The modular system combines missile warning, directed infrared countermeasures, laser warning and hostile-fire indication to help protect aircraft and crews from surface-to-air threats.

The company said the LRIP award follows the program’s EMD phase, during which it incorporated capability and producibility enhancements into the system configuration. To date, the release states, DAIRCM has been deployed on aircraft operating under a Joint Urgent Operational Need Statement.

John Baylouny, president and chief executive officer of Leonardo DRS, said in the release:

“This award moves the DRS DAIRCM System into low-rate initial production and expands our ability to provide critical integrated aircraft survivability capabilities to our military customers.”

Baylouny added that the company is proud to help address evolving aircraft survivability requirements and to enhance crew protection with what he called a cost-effective advanced integrated capability.

From an urgent need to a production line

DAIRCM’s route to production began with an urgent operational requirement. In a press release dated March 18, 2020, Leonardo DRS announced that the first AN/AAQ-45(V) DAIRCM systems had been deployed on U.S. Air Force HH-60G helicopters in support of a Joint Urgent Operational Needs Statement, with the company integrating DAIRCM kits on the HH-60G under an Air Force Materiel Command contract.

On July 20, 2020, the company announced a $120 million NAVAIR contract, mixing cost-plus-incentive-fee and firm-fixed-price terms, for engineering design and test hardware. Leonardo DRS said then that the earlier urgent-needs program had fielded the system on U.S. Air Force, Army and Navy platforms, and that the EMD program would continue developing and testing improved capabilities against enhanced and future threats.

That 2020 contract covered non-recurring engineering to design, develop, integrate and test engineering development models and production-representative models of the system’s weapons replaceable assemblies for government testing. The company described an open, scalable architecture that can be optimised for different aircraft types, with a low size, weight and power design suited to rotary and tilt-wing aircraft, including emerging future vertical lift programs. Work was planned at Dallas, San Diego, Fort Walton Beach and Melbourne, Florida, with completion expected in 2024.

According to the 2020 releases, Leonardo DRS developed DAIRCM through three business units: Airborne & Intelligence Systems, Daylight Solutions, and Electro-Optical & Infrared Systems. The company said at the time that, as missile and anti-aircraft threats evolve worldwide, frontline helicopters will need a small but capable system to defeat them. Baylouny, who appears as president and chief executive officer in the November 2026 release, was quoted in both 2020 announcements as executive vice president and chief operating officer.

What the release leaves open

The November 10 release gives no contract ceiling, delivery quantities, production schedule or list of aircraft that will carry the LRIP systems.

Leonardo DRS said the DAIRCM program expands its aircraft survivability portfolio with an integrated capability designed for increasingly complex threat environments, and that it addresses the increasing evolution and proliferation of threats to airborne platforms. The company, listed on Nasdaq under the symbol DRS, says it supplies defense technologies to U.S. national security customers and allies worldwide.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Advertisement

Follow Us

AirPro Atlas

Explore aviation on one 3D globe
4,000+ airports, 700+ active airlines, 180+ launch pads and 30 aircraft plants and boneyards, with live weather and launch countdowns.
Open the Atlas

aviation newsletter

Latest

Categories

Tags

Popular News