Connect with us

Space & Satellites

NASA and Florida Unveil CAPEWEEK Expo at Kennedy Space Center

CAPEWEEK, a new aerospace and technology expo backed by NASA and Florida, debuts at Kennedy Space Center from March 27 to April 2, 2028.

Published

on

NASA and Florida Unveil CAPEWEEK Expo at Kennedy Space Center
Photo: CAPEWEEK

NASA, the state of Florida and Space Florida are backing CAPEWEEK, a new annual aerospace and technology expo that will open on the former Space Shuttle runway at NASA’s Kennedy Space Center from March 27 through April 2, 2028. The organizers say the event is designed to grow to accommodate more than 500,000 people a year, and an initial analysis cited in the release projects an estimated $5 billion in economic impact for Florida over the first decade.

The expo was announced on November 6, 2026, in a press release distributed through GlobeNewswire and onstage at Kennedy Space Center with NASA Administrator Jared Isaacman, CAPEWEEK Mission Commander Cyrus Sigari, Space Florida President and CEO Rob Long and U.S. Representative Mike Haridopolos, a Florida Republican. According to the release, CAPEWEEK is being developed by NASA, the state of Florida, Space Florida and CAPEWEEK.

How the first CAPEWEEK is organized

The CAPEWEEK website splits the first edition into three parts. A Leadership Forum from March 27 to 29, 2028, will bring executives, investors and government officials together to discuss commercial opportunities in aerospace, superintelligence, energy, autonomy, robotics and advanced mobility. Industry Days from March 29 to 31 will offer exhibition halls, chalets, static displays and flying demonstrations, followed by Public Days on Saturday, April 1, and Sunday, April 2.

The release says CAPEWEEK will bring together companies in aerospace, defense, superintelligence, energy, autonomy, robotics and advanced mobility across land, sea, air and space, from rockets and fighter jets to autonomous ships, electric vehicles and delivery drones. The website lists ten demonstration segments: Airshow, Space, Defense, Airliners, Advanced Mobility, Autonomy, Super Intelligence, Robotics, Energy and Maritime.

The exposition aims to be an American venue for major product introductions and commercial agreements, according to the release. NASA will showcase new aircraft, autonomous vehicles, spacecraft, rovers and technologies in support of the event.

What the partners said

Isaacman said in the release that “America should have a place where the people building the future can come together.” He called the runway where the Space Shuttle returned from orbit a fitting location and said CAPEWEEK would give hundreds of thousands of visitors a front-row seat to American innovation.

Florida Governor-elect Byron Donalds said: “Florida launched the first space race, and Florida is going to win the next one.” He said he wants Florida to be the world headquarters of space exploration, with good-paying jobs for welders, electricians, machinists, technicians and pilots. Secretary of the Air Force Troy Meink pointed to the long partnership between NASA and the Department of the Air Force and said the event would “celebrate our legacy of exploration” and strengthen the industrial base.

Sigari said “America is the techno-aerospace republic” and that CAPEWEEK gives the country its own stage alongside the world’s great air shows. Long said the runway that once brought orbiters home is now the front door for companies building America’s future in space, adding: “Our job is to make sure the deals started here get done.” Haridopolos said the event will bring investment and local business opportunities:

“There’s no better place to showcase the future of aerospace than right here on the Space Coast.”

The runway and the site behind the expo

The Shuttle Landing Facility was built in 1974 for shuttles returning to Kennedy and opened for flights in 1976, according to NASA, which describes the concrete runway as 15,000 feet long and 300 feet wide, able to support all types and sizes of aircraft and horizontal launch and landing vehicles. The CAPEWEEK release and website give its length as 15,001 feet.

Space Florida, which the release describes as the state’s aerospace finance and development authority, operates the site under a 30-year property agreement that NASA announced on June 22, 2015. Kennedy director Bob Cabana said at the time: “Following the final space shuttle landing in 2011, the site has transformed into a multi-user facility.” Now called the Launch and Landing Facility, it handled over 400 landings and departures in 2023, according to Space Florida.

Space Florida lists Amazon Leo, which runs a satellite processing facility there, among the site’s users, along with Lockheed Martin for Orion heat shield deliveries and United Launch Alliance for rocket stage deliveries. The CAPEWEEK website describes the venue as a 4,000-acre launch and landing facility next to a visitor complex that receives more than 1.5 million visitors a year.

How the target compares with established shows

The release presents the 500,000 figure as the size the event is designed to grow to accommodate, not as an attendance forecast for 2028, and it does not say how many exhibitors or trade visitors the organizers expect. For scale, the 55th Paris Air Show in June 2025 recorded 305,000 unique visitors, including 141,000 trade visitors and 164,200 members of the general public, with 2,400 exhibitors from 48 countries, according to a June 23, 2025, report by the French Aerospace Industries Association (GIFAS). In the United States, the Experimental Aircraft Association (EAA) counted approximately 734,000 attendees at AirVenture Oshkosh 2026, its highest total on record, with 1,021 commercial exhibitors.

The economic figures measure different things. CAPEWEEK’s $5 billion covers Florida over a decade, including the year-round development the event anchors, and comes from an initial analysis that the release says was benchmarked against the world’s leading aerospace shows and major U.S. events; the release does not name who carried it out. EAA puts AirVenture’s economic impact at $257 million for the five counties of the Oshkosh region, based on a 2025 University of Wisconsin Oshkosh study. EAA has scheduled AirVenture 2028 for July 24 to July 30, several months after CAPEWEEK’s first edition.

From MAX POWER to 2028

CAPEWEEK was announced ahead of MAX POWER, the two-day tech expo and air show that NASA is holding at Kennedy on November 7 and 8, 2026, in honor of America’s 250th anniversary. AirPro News covered the event when NASA announced the MAX POWER expo in August. NASA’s event page describes three ticketed parks run with outside collaborators: the Air Dot Show air show, the UP.Summit technology showcase and the Kennedy Space Center Visitor Complex. NASA says tickets are sold through each partner’s website because the event relies on their funding and structure.

According to the release, aerospace and technology leaders were to join NASA, Florida and U.S. government officials for a commemoration at Kennedy Space Center later on November 6. The CAPEWEEK website invites companies to exhibit, sponsor or partner through a contact form, and neither it nor the release names exhibitors or sponsors.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Click to comment

Leave a Reply

Launch Activities

Isar Aerospace Takes Over Launch Complex at Spaceport Nova Scotia

Isar Aerospace takes operational control of its launch complex at Spaceport Nova Scotia, with first Spectrum launches targeted for 2028.

Published

on

Isar Aerospace Takes Over Launch Complex at Spaceport Nova Scotia
Photo: Isar Aerospace

Isar Aerospace has taken operational responsibility for a dedicated launch complex at Spaceport Nova Scotia and has started construction of its own launch pad in Canada, the German launch company and Maritime Launch Services (MLS) announced on November 21, 2026. The Atlantic coast site will be Isar’s second launch site and its first in North America, with first orbital launches of its Spectrum launch vehicle targeted for 2028.

In a joint press release dated November 21, 2026, issued from Halifax, the companies described the handover as a milestone in their partnership. Isar will develop, build and operate a complex for Spectrum that includes a final assembly line and a payload preparation facility. The handover of a designated launch pad was one of three conditions written into the facilities usage agreement the two companies signed in July 2026.

What Isar takes over in Nova Scotia

According to the November 21 release, the dedicated launch complex is transferring to Isar, which now takes operational responsibility for its own launch infrastructure on Canadian soil. Construction is starting on what will become Isar’s dedicated launch pad in Canada. The release did not give a date for the transfer or a construction schedule beyond the 2028 target for first orbital launches.

Under the July contract, MLS provides the licensed launch site, including the launch pad, assembly, integration and testing (AIT) facilities, a launch operations center and a facility for payload integration. The companies said in July that the site would be designed to support frequent launches, with potential for additional capacity, and that Isar had set up a Canadian entity, Isar Aerospace Canada Inc., for its North American presence.

In the release, Stella Guillen, Chief Commercial Officer of Isar Aerospace, spoke of “a decisive step closer to launching from Canadian soil.” She said the company’s ambition goes beyond building a launch site, to advancing Canada’s space ecosystem together with MLS and establishing sovereign access to orbit as a lasting national capability.

Stephen Matier, President and CEO of Maritime Launch Services, described the handover as an important step in developing Spaceport Nova Scotia. He said Isar’s investment advances sovereign launch capability, strengthens allied cooperation and brings foreign direct investment and jobs to Nova Scotia and surrounding communities.

How the agreement reached this point

The two companies signed a letter of intent in May 2026. The contract followed on July 7, 2026, when Daniel Metzler, Chief Executive Officer of Isar Aerospace, and Matier signed it in Ankara, Türkiye, during the NATO Summit Defence Industry Forum (NSDIF), according to a joint release issued that day.

The July release set out the commercial terms. The facilities usage agreement has a 10-year term, and Isar has the right to renew it for two additional 5-year terms. MLS receives quarterly payments of US$3.75 million for the term, except during a 30-month fee waiver period that begins at the end of the first year, when no quarterly payments are made. The companies said the period after the waiver reflects the operational phase of the complex. Isar also pays additional fees per launch, on a cost-plus basis, for certain services.

The agreement was made conditional on three milestones: a statement of work (SOW) and certain programmatic milestones agreed by September 1, 2026; handover of the designated launch pad to Isar by November 1, 2026; and completion of additional infrastructure at the spaceport by December 31, 2027. On September 1, the companies extended the first deadline by 14 days, moving the statement of work deadline to September 15, 2026. MLS announced on September 14, 2026, that the SOW and programmatic milestones had been finalized, and said they did not change the key terms of the July agreement.

Matier said in the September 14 release that “Finalizing the statement of work and programmatic milestones moves us directly into execution,” and that the next phase of construction was underway on site.

Where Isar and the spaceport stand

Isar Aerospace was founded in 2018 and is headquartered near Munich, Germany, with over 400 employees across 5 international locations. It develops, manufactures and tests its launch vehicles almost entirely in-house and offers launch services for small and medium-sized satellites and satellite constellations. Its first launch site is at Andøya, Norway.

In September 2026, Isar reached orbit on its second Spectrum flight, a qualification flight named Mission ‘Onward and Upward’ that MLS said delivered all payloads to orbit. Isar describes itself as the first European commercial space company to deliver satellites into orbit. The same month it signed a launch agreement with US-based SEOPS for five additional launches. The November 21 release said Isar is ramping up production at its purpose-built factory near Munich, which has capacity for 40 vehicles per year, and is expanding its global launch site network.

Spaceport Nova Scotia is developed by Maritime Launch Services Inc. near the rural communities of Canso, Hazel Hill and Little Dover. The July release called it Canada’s first licensed commercial orbital launch site. According to the November 21 release, the multi-user site’s Atlantic coast location gives over-ocean launch trajectories and access to mid- to high-inclination and polar orbits for Earth observation, communications and defence missions. MLS says it will let launch vehicles place satellites into low Earth orbit across inclinations from 45 to 98 degrees.

Government backing and what comes next

The companies said Isar’s investment aligns with Canada’s Defence Industrial Strategy and the Canadian Space Launch Act, which both identify sovereign launch capability as a national priority. David J. McGuinty, Canada’s Minister of National Defence, said in the release that “Canada must have the ability to launch and protect the capabilities we depend on.” He said the partnership between MLS and Germany’s Isar Aerospace is a step toward a sovereign space-launch capability in Canada that will strengthen national security and deepen defence cooperation with Germany.

Colton LeBlanc, Nova Scotia’s Minister of Growth, Development and Defence Industries, congratulated the two companies and said the launch infrastructure will create high-value opportunities for Nova Scotians.

The third condition in the July agreement is the completion of additional infrastructure at the spaceport by December 31, 2027. In July, the companies said Isar’s launch operations were expected to begin ramping up in 2028, with the potential to support up to 40 launches annually by 2029.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Space & Satellites

ProLogium Presents Lithium Ceramic Battery Pack at NASA Workshop

ProLogium showed Battery Pack 2.0, built on GEN4 lithium ceramic cells, at NASA’s battery workshop. Flight qualification is still ahead.

Published

on

ProLogium Presents Lithium Ceramic Battery Pack at NASA Workshop
Photo: ProLogium

ProLogium Technology presented Battery Pack 2.0, a design concept built on its fourth-generation (GEN4) lithium ceramic cells, at the 2026 NASA Aerospace Battery Workshop in Huntsville, Alabama, pitching the technology for spacecraft and lunar infrastructure. The company says GEN4 cells and packs still need flight qualification for their intended missions.

In a press release dated November 20, 2026, ProLogium said it was making its first appearance at the workshop, where founder, CEO and CTO Vincent Yang introduced the pack concept. The company said it held technical discussions with experts from NASA, BAE Systems, Saft, The Aerospace Corporation and other government agencies on scaling the technology for space missions.

What ProLogium showed at the Huntsville workshop

NASA’s Marshall Space Flight Center hosts the workshop as an annual event. The 2026 edition ran from November 17 to 19 at the U.S. Space and Rocket Center in Huntsville, according to NASA’s workshop page, which says attendees are typically scientists and engineers from U.S. Government agencies, aerospace contractors and battery manufacturers. Its subjects include flight and ground test data, on-orbit operation and problem-resolution efforts.

Yang’s presentation was titled “Mission-Ready Next Generation Battery: Safe. Powerful. Dense & Scalable.” ProLogium said the official agenda also included contributions from NASA, BAE Systems, the Naval Surface Warfare Center, The Aerospace Corporation and Saft, among others.

The company is targeting two areas. The first is space mobility: satellites, spacecraft and planetary rovers, which benefit from high energy density within weight and volume limits. The second is infrastructure for lunar work bases, where the release says long-term reliability and power resilience are valued, meaning the ability to isolate faults, keep critical loads powered and restore operation. “When something goes wrong, how much of the mission can we preserve?” Yang asked during the presentation.

How the GEN4 cell is designed

According to the release, GEN4 cells use non-flammable inorganic electrolytes and heat-resistant ceramic separators, plus a built-in Active Safety Mechanism (ASM) that Yang likened to the battery’s “immune system.” Under localized overheating or overcharging, the company says, the ASM stabilizes the active materials in both electrodes, reducing oxygen release and heat and suppressing the chain of heat-generating reactions.

ProLogium cites its own technical data for the electrolyte’s ionic conductivity, which it puts at about five times that of the liquid electrolytes used in its comparison, and says the lower heat under high current supports fast charging and high-power discharge. Its Logithium cell has dual sealing, an internal edge seal and an external aluminum-foil enclosure, designed for hermeticity and structural integrity under vacuum. At pack level, the company says, dual sealing can reduce reliance on extra hermetic components, lowering weight and integration cost.

Yang said aerospace missions push batteries to their limits and that a next generation battery must combine higher energy density with safety, performance and reliability. He added that ProLogium uses aerospace demands to guide its validation work. The release says that if GEN4 is validated under relevant mission conditions, the results could inform product development for artificial intelligence data centers, robotics and critical infrastructure.

Ground tests so far, flight qualification still ahead

The test results the release cites come from ground testing of earlier cells. The release says two peer-reviewed studies published in 2020 by researchers at Kyushu Institute of Technology found that early-generation ProLogium lithium ceramic cells kept about 98% of their capacity after vacuum exposure and thermal-vacuum cycling, and about 95% after separate multi-axis vibration and shock testing.

A 2025 study by researchers at Nihon University found that a rigid housing reduced vacuum-induced swelling in early-generation cells from about 19% to 0.065% under that study’s test conditions, the company said. The release does not name the journals. ProLogium says it aims to pursue flight validation for specific missions and build flight heritage progressively, but the release does not name a mission, a customer or a date for that work.

From vehicle cells to aircraft and the Moon

ProLogium, founded in 2006, develops and manufactures lithium ceramic batteries and reports more than 1,200 patents and patent applications worldwide. It says it has delivered more than 2.4 million battery cells since 2013 and has commercially shipped its GEN 3.5 all-solid-state lithium ceramic batteries from its manufacturing platform in Taiwan, where its first GWh-scale gigafactory, Taoke, is located in Taoyuan. A second gigafactory in Dunkirk, France, broke ground on its first phase in February 2026. That phase is designed for 4.0 GWh of annual capacity, expected progressively by 2030.

The NASA workshop is not ProLogium’s first step toward aerospace. In a release dated June 18, 2026, it announced a memorandum of understanding with Elysian Aircraft, a Dutch company developing large-scale battery-electric aircraft, to assess its cells for all-electric aircraft. Under a potential cooperation agreement, that work would focus on battery technologies targeting pack-level energy densities of 320-420 Wh/kg, supporting large battery-electric aircraft with ranges of 750-1,000 km. Elysian is developing its E9X battery-electric aircraft design, which that release described as the “world’s first large-scale battery-electric aircraft.”

ProLogium is also working toward a U.S. listing. In May 2026 it signed a definitive business combination agreement with Translational Development Acquisition Corp. (Nasdaq: TDAC) and has filed a Form F-4 registration statement with the U.S. Securities and Exchange Commission (SEC). Subject to completion, approvals and listing conditions, it is expected to list on Nasdaq under the proposed ticker PRLG, the company said. It said it will keep validating GEN4, optimizing manufacturing and preparing for scale-up.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Atlas Data

Vandenberg SFB, California, by the Numbers: 80 Launches in 12 Months

AirPro Atlas data show 80 launches from Vandenberg SFB in the 12 months to November 2, 2026, with 78 from Space Launch Complex 4E.

Published

on

Vandenberg SFB, California, by the Numbers: 80 Launches in 12 Months
Photo: AirPro News

This is original reporting and analysis by AirPro News.

Vandenberg Space Force Base in California recorded 80 launches between November 3, 2025 and November 2, 2026, according to AirPro Atlas launch-pad data as of November 8, 2026. Space Launch Complex 4E accounted for 78 of them.

Over its full record, the base has 477 launches across the 6 pads listed for the site, and 474 of those count as orbital launches. Space Launch Complex 4E leads that all-time count as well, with 306.

The next two missions on the upcoming list, USSF-627 and USSF-317, are both marked Go for Launch on Falcon 9 Block 5, for November 10, 2026 and November 13, 2026.

These figures are launch counts in Launch Library 2, the launch database behind the AirPro Atlas launch-site pages, as of November 8, 2026. They count launches, not satellites or payloads, and they reflect what the database held on that date. Upcoming launch dates and times change often, and some missions on the upcoming list still carry the status To Be Determined.

One pad carries the recent record

Space Launch Complex 4E is the center of activity at Vandenberg. Its 78 launches in the 12-month window compare with 1 from Space Launch Complex 2W and 1 from Space Launch Complex 8. No other pad appears in the 12-month count.

The most recent launches in the record all lifted off from Space Launch Complex 4E on Falcon 9 Block 5 in October 2026, and all are marked as successes: Starlink Group 15-25 on October 13, USSF-481 on October 16, Starlink Group 15-15 on October 23, Starlink Group 15-16 on October 27 and Starlink Group 15-18 on October 31.

That run mixes Starlink missions with USSF-481, but the vehicle and the pad stay the same throughout. On the evidence of the record, Vandenberg’s recent cadence is a Falcon 9 Block 5 cadence from a single complex.

The other pads in the record

Space Launch Complex 2W ranks second in the all-time count with 99 launches, but it appears only once in the 12-month window. That launch was Stairway to Seven on Firefly Alpha on March 12, 2026, listed as a success.

Space Launch Complex 8 has 10 launches to date. Its single launch in the window was STP-S29A on Minotaur IV on April 7, 2026, also listed as a success.

Space Launch Complex 3E has 48 launches to date and Space Launch Complex 6 has 14, but neither appears in the 12-month count. Space Launch Complex 14 is listed for the site with no launches recorded.

What is next on the list

Every mission on the upcoming list for Vandenberg is a Falcon 9 Block 5 flight. USSF-627 is listed for November 10, 2026 at 03:03 UTC and USSF-317 for November 13, 2026 at 04:23 UTC, both with the status Go for Launch.

NROL-195, OneWeb 21 and Starlink Group 15-21 follow, each listed for November 30, 2026 at 00:00 UTC with the status To Be Determined. A midnight UTC time paired with that status means no firm launch time is in the record yet, so those dates are best read as placeholders rather than schedules.

AirPro News analysis

The clearest contrast in the data is between the base’s long record and its latest year. Space Launch Complex 4E holds 306 of the 477 launches in the full record, a clear lead but far from the whole. In the 12 months to November 2, 2026, it accounts for 78 of 80. Space Launch Complex 2W, second in the long-run count with 99 launches, contributed 1 in that window, and Space Launch Complex 3E, with 48 launches to date, contributed none. Recent activity at Vandenberg is concentrated on one pad to a degree its history does not show.

The 80 launches in the latest 12 months are a substantial part of the 477 in the full record, and the upcoming list follows the same pattern as the recent launches, with every listed mission on Falcon 9 Block 5. Whether that pace holds depends on schedules that change often. The two missions marked Go for Launch are the firmest signal in the data; the missions marked To Be Determined have no fixed time yet and could move well beyond the dates shown.

Each pad, its launch count and the upcoming list for Vandenberg can be explored on the AirPro Atlas.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Advertisement

Follow Us

AirPro Atlas

Explore aviation on one 3D globe
4,000+ airports, 700+ active airlines, 180+ launch pads and 30 aircraft plants and boneyards, with live weather and launch countdowns.
Open the Atlas

aviation newsletter

Latest

Categories

Tags

Popular News