Space & Satellites
NASA FarmFlux Mission to Measure US Agricultural Emissions
NASA’s $15M FarmFlux campaign launches in 2026 to measure agricultural emissions using two research aircraft.

The National Aeronautics and Space Administration (NASA) will launch a $15 million airborne research campaign in October 2026 to measure agricultural emissions across the United States using a Dynamic Aviation A200 and a NASA P-3 Orion.
The Earth Venture Suborbital (EVS-4) investigation, dubbed the FarmFlux mission, aims to close data gaps regarding the interaction between agricultural pollutants and the Earth’s atmosphere. According to a NASA press release, the mission is jointly led by the NASA Goddard Space Flight Center, Colorado State University, and Boston University. The agency noted that agricultural emissions represent an “important and understudied part of Earth’s land and atmosphere systems.”
Flight schedule and deployment locations
The initial series of low-altitude research flights will begin in October 2026 over farmland near Greeley, Colorado. Operations will then shift to Amarillo, Texas, in late October and early November 2026.
A second phase of the campaign is scheduled from March through July 2027. During this period, flights will target major crop systems in the United States Midwest and California’s Central Valley to capture data during the active growing season.
Dual-aircraft approach and sensor payloads
The FarmFlux mission utilizes a two-aircraft strategy to address different agricultural environments. A Dynamic Aviation A200 will focus on quantifying emissions from animal feeding operations, including beef cattle, dairies, hogs, and chickens, using mass balance techniques.
For broader agricultural surveys, the agency will deploy a heavy-lift NASA P-3 Orion to monitor major crop systems. NASA stated the aircraft will carry more than a dozen sensors designed to measure ozone, methane, ammonia, and particulates rising from the surface.
The airborne data collection will also serve to validate satellite retrievals from current and upcoming orbital missions. Ground-truth data gathered by the A200 and P-3 Orion will be compared against inferred emissions from the Tropospheric Emissions: Monitoring of Pollution (TEMPO) instrument and the Cross-track Infrared Sounder (CrIS).
AirPro News analysis
We view the FarmFlux mission as a critical step in bridging the gap between localized ground sensors and macro-level satellite data. By utilizing specialized aircraft like the A200 and P-3 Orion for low-altitude atmospheric sampling, researchers can build a more accurate profile of how agricultural operations impact air quality and climate. The $15 million investment highlights a growing regulatory and scientific focus on non-industrial emission sources, which could eventually influence environmental policies affecting the aviation and agricultural sectors alike.
Sources: National Aeronautics and Space Administration (NASA)
Photo Credit: NASA
Space & Satellites
Iridium Stockholders Approve Rocket Lab Acquisition
99.6% of votes cast approved Rocket Lab’s ~$8B acquisition of Iridium, expected to close mid-2027.

Stockholders of Iridium Communications Inc. formally approved the company’s acquisitions by Rocket Lab Corporation during a special meeting on September 24, 2026. The vote clears a primary hurdle in a merger designed to combine dedicated launch services with an established global satellite communications network.
According to a joint press release, 99.6% of the votes cast favored the transaction. This figure represents 81.0% of Iridium’s outstanding shares of common stock entitled to vote. The acquisition carries an implied enterprise value of approximately $8.0 billion for Iridium and is expected to close in mid-2027, pending regulatory approvals.
Financial structure and capital strategy
Under the terms of the agreement, Iridium stockholders will receive $27.00 in cash per share alongside a calculated number of shares of Rocket Lab common stock. The companies stated this structure provides a notional value of $54.00 per share of Iridium common stock.
Rocket Lab has already secured the capital required for the cash portion of the acquisition. On September 15, 2026, the launch provider announced it had raised $1.944 billion in gross proceeds through an At-The-Market (ATM) equity offering, issuing 29.3 million shares. Securing this funding allowed Rocket Lab to cancel a $3.6 billion senior secured bridge facility initially established for the merger. Concurrently, Iridium amended its $1.775 billion credit facility to permit the change of control.
Regulatory progress and industry impact
The stockholder approval follows steady progress on the regulatory front. On August 13, 2026, Rocket Lab confirmed the expiration of the mandatory waiting period under the Hart-Scott-Rodino (HSR) Antitrust Improvements Act. The companies have also filed applications with the Federal Communications Commission (FCC) to transfer control of Iridium’s operating licenses.
Leadership from both organizations emphasized the strategic alignment of the merger. Iridium Chief Executive Officer Matt Desch noted the vote marks a milestone toward uniting companies with complementary capabilities and experience in critical missions.
Rocket Lab Founder and Chief Executive Officer Sir Peter Beck highlighted the operational synergies of the deal, focusing on the combination of launch infrastructure and orbital assets.
“We’re grateful to have the strong support of Iridium’s shareholders in this important step, bringing us closer to combining Iridium’s trusted global network, spectrum and decades of operating experience with Rocket Lab’s extensive launch and space systems capabilities to unlock a new era of space applications,” Beck said in the release.
AirPro News analysis
We view the successful stockholder vote as a definitive step in Rocket Lab’s transition from a launch and components provider to an end-to-end space prime contractor. By acquiring Iridium, Rocket Lab gains immediate access to valuable L-band spectrum and a proven, revenue-generating satellite constellation. This vertical integration strategy mirrors broader industry trends where launch providers seek to capture higher-margin space services and data markets. The rapid execution of the $1.944 billion ATM offering also demonstrates strong institutional confidence in the merger’s strategic rationale, mitigating the debt burden that would have accompanied the canceled bridge facility.
Sources: Rocket Lab Corporation Press Release
Photo Credit: Rocket Lab
Space & Satellites
Google Project Suncatcher Satellite Launch October 2026
Google launches its first AI satellite Oct 1, 2026, testing Trillium TPUs in low Earth orbit under Project Suncatcher.

Google will launch its first prototype satellite on October 1, 2026, to test the viability of running AI hardware in low Earth orbit.
The spacecraft, designated MVP, is the inaugural physical test for Project Suncatcher. Announced by Google Research in a September 24 press release, the initiative explores the development of scalable, solar-powered AI data centers in space. The satellite will launch from Vandenberg Space Force Base in California aboard a Space Exploration Technologies Corp. (SpaceX) Falcon 9 rocket, flying as part of the Transporter-18 rideshare mission.
Hardware and thermal management
The MVP satellite payload centers on four Google Trillium Tensor Processing Units (TPUs), according to technical specifications reported by Tom’s Hardware. The system is powered by a solar array generating approximately 1 kilowatt of energy.
Operating high-performance computing hardware in a vacuum presents severe thermal management challenges. Without atmospheric airflow to dissipate heat, the satellite relies on a specialized network of heat pipes and radiators. Due to these thermal constraints, the TPUs will process queries for Google’s Gemini AI models in 15-minute bursts before shutting down to cool.
The spacecraft is designed for a one-year operational lifespan. Following the conclusion of its mission, the satellite will naturally decay from orbit and burn up in the Earth’s atmosphere after approximately six years.
Launch stresses and radiation testing
Reaching low Earth orbit (LEO) requires the commercial AI hardware to survive extreme physical forces. During the 10-minute ascent, the spacecraft will experience sustained acceleration loads of 10 g, while individual components like the TPU chips could face forces between 50 and 100 g.
Beyond launch vibrations, the hardware must withstand the orbital radiation environment. Google conducted extensive pre-flight testing at the Crocker Nuclear Laboratory at the University of California, Davis.
“Initial results have shown that our Trillium TPUs hold up remarkably well, and can survive a radiation total ionizing dose greater than what they would receive during a five-year space mission,” said Travis Beals, Senior Director of Paradigms of Intelligence at Google.
Beals noted that the primary objective of the MVP mission is data collection rather than continuous operation.
“This first launch is about seeing what works, identifying points of failure, and applying those findings to future missions. Big breakthroughs happen when you work backwards from an end goal. In our case, it’s to ensure AI’s profound benefits in key areas, from healthcare to scientific discovery, can reach everyone, far into the future.”
The push for orbital compute
Project Suncatcher emerges as terrestrial data centers face mounting constraints. Gizmodo reported that the push for space-based infrastructure is driven by increasing local opposition to the massive electricity consumption, land use, and noise associated with Earth-bound AI facilities.
By placing data centers in specific low Earth orbits, operators can harness near-constant sunlight. Google estimates that a satellite in LEO can generate eight times the solar power of an equivalent panel on Earth.
Google is not the only entity pursuing orbital compute capabilities. SpaceX and startup Starcloud are developing competing space-based AI infrastructure. Starcloud previously launched an Nvidia H100 graphics processing unit into orbit in November 2025.
Following the MVP mission, Google plans to expand Project Suncatcher in 2027 by launching two additional satellites to test high-bandwidth laser communications between orbital nodes.
AirPro News analysis
We view the migration of high-performance computing to low Earth orbit as a potential catalyst for the commercial space sector. If technology companies can successfully adapt commercial-off-the-shelf AI processors to survive launch stresses and orbital radiation, it will likely drive a new class of heavy, power-dense payloads. This shift would directly benefit launch providers and satellite bus manufacturers capable of supporting high-kilowatt power requirements and advanced thermal rejection systems. The success of Project Suncatcher could transition orbital data centers from a research novelty into a core driver of commercial launch demand by the end of the decade.
Sources: Google Research
Photo Credit: Google Research
Space & Satellites
NASA Names SpaceX Crew-14 Astronauts for Spring 2027 ISS Mission
NASA assigned four crew members from NASA, JAXA, and Roscosmos to SpaceX Crew-14, targeting a spring 2027 ISS launch.

NASA has assigned four crew members from three international space agencies to the SpaceX Crew-14 mission, targeting a launch to the International Space Station no earlier than spring 2027.
The flight marks the 14th commercial crew rotation mission conducted by SpaceX under NASA’s Low Earth Orbit Program. According to a press release issued by the agency on September 24, 2026, the crew will join Expedition 75/76 to conduct scientific research and technology demonstrations intended to support future lunar and Martian exploration.
Crew-14 roster and international composition
The Crew-14 manifest includes astronauts from NASA, the Japan Aerospace Exploration Agency (JAXA), and Roscosmos. NASA astronaut Kayla Barron will serve as spacecraft commander, with fellow NASA astronaut Chris Birch assigned as pilot. JAXA astronaut Makoto Suwa and Roscosmos cosmonaut Arutyun Kiviryan will serve as mission specialists.
Barron brings previous spaceflight experience to the command role, having logged 177 days in space and completed two spacewalks during Expeditions 66 and 67 following her launch on the SpaceX Crew-3 mission in 2021. The remaining three crew members will be making their first spaceflights. Kiviryan was selected for the Cosmonaut Corps in 2021 and began serving as a test cosmonaut in 2023. Suwa was selected as a JAXA astronaut candidate in 2023 and completed his basic certification training in 2024.
Commercial crew rotation timeline
The Crew-14 mission will utilize a SpaceX Crew Dragon spacecraft launched atop a Falcon 9 rocket from the United States. Upon docking with the International Space Station (ISS), the four crew members will transition into their roles for the long-duration Expedition 75/76.
NASA’s scheduling of the spring 2027 launch follows the progression of the agency’s commercial crew rotation sequence. The preceding mission, SpaceX Crew-13, is currently undergoing final prelaunch preparations and is targeted for an October 1, 2026, departure to the orbital laboratory.
AirPro News analysis
The inclusion of both JAXA and Roscosmos crew members on a single US commercial vehicle highlights the continued reliance on integrated international crews for ISS operations. The cross-training and seat-exchange agreements between NASA and Roscosmos remain a functional necessity for maintaining continuous staffing and operational redundancy on the space station. We view the assignment of a highly experienced commander like Barron alongside three rookie flyers as a standard crew resource management strategy for long-duration orbital expeditions.
Sources: NASA Press Release
Photo Credit: NASA
-
Space & Satellites4 days agoSpaceX Starship Flight 14 Targets First Orbital Mission
-
MRO & Manufacturing3 days agoBoeing and ORNL 3D Print Two-Ton Mold for NASA HiCAM
-
Business Aviation5 days agoTextron Aviation Delivers 500th Cessna Citation Latitude
-
MRO & Manufacturing3 days agoST Engineering and Collins Aerospace Sign MRO Agreements
-
Space & Satellites6 days agoStoke Space Raises $1B Series E to Scale Nova Rocket Program
