Connect with us

Defense & Military

Bell 505 Selected for US Marine Corps Autonomous Logistics Program

Bell Textron partners with Near Earth Autonomy to provide Bell 505 airframe for USMC MARV-EL Increment 2 uncrewed logistics aircraft program.

Published

on

This article is based on an official press release from Bell Textron Inc.

Bell Textron Inc. has been selected by Near Earth Autonomy to provide the Bell 505 airframe for a new U.S. Marine Corps autonomous logistics initiative. According to an official company press release, the partnership will focus on prototyping an uncrewed logistics aircraft for the Marine Corps’ Aerial Resupply Vehicle, Expeditionary Logistics (MARV-EL) Increment 2 program.

The collaboration aims to develop a middle-weight uncrewed logistics asset capable of tactical-edge resupply in contested environments. By leveraging the existing Bell 505 platform, the team intends to deliver an autonomous aerial logistics capability that exceeds the performance threshold requirements of the MARV-EL program while accommodating a wide range of payloads and standard containers.

This development marks a significant step in the military’s push toward uncrewed supply chains, reducing the risk to human personnel during critical resupply missions. Bell will provide engineering support to Near Earth Autonomy, focusing on integrating autonomous systems and enhancing the aircraft’s cargo-handling capabilities.

The MARV-EL Increment 2 Program

Tactical Resupply in Contested Environments

The U.S. Marine Corps’ MARV-EL program is designed to bridge the gap between small tactical drones and large strategic airlifters. In a company press release, Bell noted that the goal of the program is to prototype an uncrewed logistics aircraft ready for tactical-edge resupply in contested environments.

According to industry reporting by DroneLife, the MARV-EL threshold requirements call for a 1,300-pound payload capacity and a 100-nautical-mile combat radius. The Near Earth Autonomy and Bell team aims to exceed these marks with their modified Bell 505 configuration, which is also designed so that two aircraft can fit inside a C-130 transport plane with minimal disassembly for rapid forward deployment.

Bell and Near Earth Autonomy Partnership

Modifying the Bell 505 for Autonomous Flight

The partnership between Bell and Near Earth Autonomy builds on a history of collaborative development. In 2024, Bell revealed its Aircraft Laboratory for Future Autonomy (ALFA) platform, where the two companies worked together to integrate an advanced perception system for flight demonstrations.

For the MARV-EL program, Bell will support Near Earth Autonomy with engineering modifications to the Bell 505 helicopter. The focus will be on autonomy integration and enhanced cargo handling to meet the rigorous demands of Marine Corps logistics.

“This platform will be a step forward in transforming the U.S. Marine Corps’ autonomous operations and how our warfighters navigate on the battlefield,” said Jason Hurst, Bell Senior Vice President of Engineering, in the press release.

Hurst also added that Bell looks forward to continuing its relationship and prior autonomy development with Near Earth to support the MARV-EL initiative.

AirPro News analysis

The selection of the Bell 505 for the MARV-EL Increment 2 program highlights a growing trend in military procurement: adapting proven, commercially available airframes with advanced autonomous technology rather than developing entirely new uncrewed platforms from scratch. By utilizing the Bell 505, the Marine Corps can potentially accelerate the deployment of middle-weight logistics assets. Furthermore, industry reports from Lockheed Martin indicate that Sikorsky and Robinson Unmanned were also awarded a contract under the same MARV-EL Increment 2 program, suggesting that the Marine Corps is fostering a competitive environment to rapidly field the most effective autonomous resupply solutions.

Frequently Asked Questions

What is the MARV-EL program?

The Aerial Resupply Vehicle, Expeditionary Logistics (MARV-EL) program is a U.S. Marine Corps initiative aimed at developing a middle-weight uncrewed logistics aircraft for tactical resupply in contested environments.

What role does Bell play in this partnership?

According to the press release, Bell is providing the Bell 505 airframe and engineering support to Near Earth Autonomy for autonomy integration and enhanced cargo handling.

What are the payload requirements for MARV-EL?

Based on industry reporting by DroneLife, the program’s threshold requirements include carrying a 1,300-pound payload over a 100-nautical-mile combat radius.

Sources: Bell Textron Inc.

Photo Credit: Bell Textron Inc.

Continue Reading
Click to comment

Leave a Reply

Defense & Military

NSPA Issues RFP for NATO Next Generation Rotorcraft Program

NSPA formally launches the NGRC Concept Design RFP, with four manufacturers competing for a six-nation helicopter replacement program.

Published

on

The NATO Support and Procurement Agency (NSPA) has formally issued a Request for Proposal for the Concept Design phase of the Next Generation Rotorcraft Capability program, advancing a six-nation effort to replace aging medium multi-role Helicopters fleets.

Announced in a press release on August 10, 2026, the procurement targets a service entry between 2035 and 2040. The NSPA is managing the process on behalf of Canada, France, Germany, Italy, the Netherlands, and the United Kingdom. Four pre-qualified Manufacturers will compete in this phase: Airbus Helicopters, Leonardo Helicopters, The Boeing Company, and Sikorsky.

Advancing the concept design phase

The Request for Proposal (RFP) officially opened on July 31, 2026, and requires the four bidders to submit their concept design proposals by August 31, 2027, at 12:00 Paris Time. Under the procurement guidelines, each manufacturer can propose a maximum of two concept design solutions.

Maxime Martinez, Principal Procurement Officer for the Next Generation Rotorcraft Capability (NGRC) Programme at NSPA, confirmed the launch of the new phase.

I am pleased to announce that the NATO Support and Procurement Agency (NSPA) has launched the next phase of the Next Generation Rotorcraft Capability (NGRC) Programme: a formal Request for Proposals (RFP) to qualified bidders linked to the competition for the Concept Design phase of NGRC.

The NSPA is utilizing a procurement mechanism called Acquisition by Qualified Options. This framework allows the participating nations to evaluate digital trials within an in-house modeling and simulation environment before committing to physical prototypes. The agency plans to complete the bid evaluation process by the end of 2027, at which point it will deliver an evaluation summary report to the participating nations.

Industry positioning and proposals

The four pre-qualified bidders, selected following a Pre-Qualification Assessment that closed in October 2025, have already begun positioning their offerings for the multi-national replacement program.

In February 2026, Airbus Helicopters revealed two distinct concepts for the NGRC study. The European manufacturer is developing both a high-performance conventional helicopter and a high-speed compound rotorcraft that leverages technology from its Racer demonstrator program. Sikorsky, a Lockheed Martin company, announced in July 2026 that it would establish helicopter production facilities in Europe if the partner nations select its proposal.

The NSPA is encouraging broader industry participation through the primary bidders rather than direct submissions. Martinez stated that potential suppliers, technology providers, and industrial partners should engage directly with Airbus Helicopters, The Boeing Company, Leonardo Helicopters, or Sikorsky to contribute to the program.

AirPro News analysis

We view the NSPA decision to utilize the Acquisition by Qualified Options mechanism as a critical step in mitigating the technical and financial risks historically associated with clean-sheet rotorcraft development. By mandating digital trials in a simulated environment before advancing to physical prototypes, the participating nations can rigorously evaluate the aerodynamic and operational viability of complex designs, such as the compound concept proposed by Airbus Helicopters.

Sikorsky’s preemptive commitment to European production highlights the intense political and economic stakes of the NGRC program. With five European nations and Canada funding the development, North American bidders like Sikorsky and The Boeing Company will likely need to guarantee substantial industrial offsets and local manufacturing to remain competitive against indigenous European prime contractors like Airbus and Leonardo. The requirement for up to two concepts per bidder also provides the NSPA with a broad spectrum of conventional and advanced high-speed rotorcraft options to evaluate against the harmonized operational baseline.

Sources: NATO Support and Procurement Agency (NSPA)

Photo Credit: Airbus

Continue Reading

Defense & Military

HAL and Safran Sign Aravalli Engine Co-Development Contract

HAL and Safran finalize the Aravalli engine contract via SAFHAL JV to power India’s IMRH and DBMRH helicopters by 2032-2033.

Published

on

Hindustan Aeronautics Limited (HAL) and Safran Helicopter Engines have finalized a contract to co-develop the new-generation Aravalli engine, marking a definitive shift in Indian aerospace manufacturing from licensed production to indigenous propulsion design.

The agreement, signed on August 26, 2026, in Bengaluru, India, formalizes the design, development, manufacture, and lifecycle support of the engine through SAFHAL Helicopter Engines Pvt. Ltd. SAFHAL is a 50:50 joint venture between the two aerospace manufacturers. The Aravalli engine is slated to power India’s future 13-ton Indian Multi-Role Helicopter (IMRH) and its naval variant, the Deck-Based Multi-Role Helicopter (DBMRH).

Technical specifications and manufacturing

The Aravalli engine will operate in the 3,500 to 4,000 shaft horsepower (shp) class. Under the terms of the agreement, HAL will gain access to core engine technologies, including the high-pressure compressor, power turbine, and accessory gearbox. This technology transfer is designed to build domestic intellectual property and expertise in high-power engine design.

Manufacturing operations for the Aravalli program will be based at HAL’s facility in Tumakuru, Karnataka. Safran Helicopter Engines Chief Executive Officer Cédric Goubet noted the precedent set by the agreement in a press release issued by HAL.

“This is the first time Safran HE has taken up such a class of engine as co-development. The Aravalli engine programme represents a new chapter in the strategic relationship between France and India, combining the expertise of our teams to develop propulsion systems for future Indian rotorcraft.”

Development timeline and strategic shift

The final contract follows a multi-year negotiation and planning phase. HAL and Safran initially signed a Memorandum of Understanding for the project in July 2022, followed by detailed workshare discussions at Aero India in February 2023. The companies executed an airframer contract on August 30, 2024, to commence joint design work.

The design and development phase is targeted for completion between 2032 and 2033. Once operational, the IMRH platform is intended to replace the Indian Air Force’s aging fleet of Mil Mi-17 Helicopters. HAL Chairman and Managing Director Ravi K emphasized the domestic industrial impact of the program.

“The signing of this contract marks a significant step forward in India’s pursuit of self-reliance in aero-engine technologies. Through this collaborative programme with SAFHAL and Safran Helicopter Engines, we are creating a strong foundation for powering next-generation Indian helicopter platforms.”

AirPro News analysis

The Aravalli engine contract represents a critical maturation point for India’s defense aviation sector. Historically, Indian aerospace manufacturing has relied heavily on licensed production of foreign designs, which limits domestic engineering capability and intellectual property ownership. By securing a 50:50 co-development structure that includes core engine components like the high-pressure compressor and power turbine, we view this agreement as a foundational step toward true Propulsion independence for the Indian military. If the 2032 to 2033 development timeline holds, HAL will be positioned not just as an assembler, but as a primary original equipment Manufacturers (OEMs) for high-power rotorcraft engines.

Sources: Hindustan Aeronautics Limited

Photo Credit: Hindustan Aeronautics Limited

Continue Reading

Defense & Military

Raytheon Wins $603M Contract for B-52H Radar Modernization

Raytheon secures $603M USAF contract to produce the AN/APQ-188 AESA radar for the B-52H fleet under the B-52 Radar Modernization Program.

Published

on

This is a developing story. Information may change as official details are released.

Raytheon has secured a $603,000,000 sole-source contract from the U.S. Air Force (USAF) to produce and sustain the new AN/APQ-188 radar for the Boeing B-52H Stratofortress fleet, advancing a critical modernization effort despite the recent loss of the program’s primary test aircraft.

The U.S. Department of Defense announced the indefinite-delivery/indefinite-quantity (IDIQ) contract on August 25, 2026, following the official award on August 21, 2026. The agreement establishes the ceiling value for the production phase of the B-52 Radar Modernization Program (RMP). The Air Force Life Cycle Management Center (AFLCMC) at Wright-Patterson Air Force Base (FFO) in Ohio is the contracting activity, obligating $46,008,396 in fiscal 2026 aircraft procurement funds with the initial delivery order.

Upgrading the B-52 radar capabilities

The RMP replaces the bomber’s 1960s-era mechanically scanned AN/APQ-166 radar with the Raytheon AN/APQ-188, an Active Electronically Scanned Array (AESA) system. The new Radar-Systems is a derivative of the AN/APG-79 used on the F/A-18 and forms a cornerstone of the broader B-52J upgrade package designed to keep the fleet operational into the 2050s.

According to the Department of Defense, Raytheon will perform the contract work across multiple facilities, including Forrest, Mississippi; El Segundo, California; McKinney, Texas; and Warner Robins, Georgia. The contract is expected to be completed by August 20, 2031.

Program continuity following testbed loss

The production contract award follows a major setback for the RMP during the flight testing phase. On June 15, 2026, the sole B-52 radar testbed aircraft crashed shortly after takeoff at Edwards Air Force Base (EDW) in California. The USAF confirmed the accident resulted in the deaths of all eight crew members on board, which included military personnel, government civilians, and contractors. The official cause of the accident remains under Investigation by the USAF.

Despite the loss of the initial testbed, military officials have confirmed the modernization program will proceed. According to reporting by DefenseScoop, Col. Spencer Turner, the B-52 System Program Manager, stated that the original acquisition strategy always included two test aircraft.

Turner confirmed that work on the second aircraft is actively underway at The Boeing Company facility in San Antonio, Texas. He noted that the service expects to “complete the full modification and put the full radar suite onto the aircraft this year and proceed with testing.” Following the June 15, 2026 accident, the active USAF fleet stands at 75 B-52H bombers.

AirPro News analysis

The decision to award a $603,000,000 production contract just two months after the loss of the primary testbed underscores the firm commitment of the USAF to the B-52J upgrade timeline. Because the AN/APQ-188 is heavily derived from an existing, mature AESA system, the service likely views the radar technology itself as low-risk, separating the radar’s production readiness from the ongoing investigation into the June 15 accident. We note that delaying the production contract until a second testbed completes flight trials would have likely pushed the B-52J initial operational capability timeline to the right, a delay the USAF appears unwilling to accept as it plans to operate the airframe for another three decades.

Sources: U.S. Department of Defense

Photo Credit: US Air Force

Continue Reading
Every coffee directly supports the work behind the headlines.

Support AirPro News!

Advertisement

Follow Us

newsletter

Latest

Categories

Tags

Every coffee directly supports the work behind the headlines.

Support AirPro News!

Popular News