Connect with us

Defense & Military

Spain Launches ITS-C Program with Airbus and Turkish Aerospace

Spain’s ITS-C program led by Airbus introduces the SAETA II trainer with 60% Spanish industry participation and phased delivery by 2035.

Published

on

This article is based on an official press release from Airbus, supplemented by industry research.

Spain Unveils Industrial Programme for New SAETA II Combat Training System

On April 28, 2026, an Airbus-led consortium of Spanish aerospace and defense companies officially presented the industrial framework for the Spanish Air and Space Force’s new Integrated Combat Training System (ITS-C). According to an official press release from Airbus, the ambitious programme is designed to replace Spain’s aging fleet of Northrop F-5M aircraft, ensuring a modernized training pipeline for the next generation of fighter pilots.

The ITS-C programme is anchored by a co-development agreement between Airbus, acting as the prime contractor, and Turkish Aerospace (TA). The initiative will introduce a customized Spanish variant of TA’s HÜRJET advanced training aircraft, officially designated as the SAETA II. Industry research indicates that the December 2025 contract underpinning this programme is valued between €2.4 billion and €2.6 billion, marking a historic procurement milestone for both Spain and Turkey.

Advertisement
Istanbul Aviation Forum, the meeting point of the global aviation industry, April 27-28, 2027

A central pillar of the agreement is the commitment to domestic industry. The Airbus press release confirms that the programme mandates a 60% participation rate from Spanish national industry. This localized approach aims to secure technological sovereignty, allowing Spain to independently manage the sustainment, maintenance, and future evolution of the 30-aircraft fleet.

The SAETA II and Phased Implementation

A Historic Procurement and Infrastructure Overhaul

The selection of the HÜRJET platform follows a rigorous evaluation process. According to defense industry reports, Spain evaluated a prototype of the Turkish-built supersonic advanced jet trainer in July 2024 at Torrejón Air Base. The subsequent December 2025 contract represents Turkey’s largest-ever single aircraft export deal and its first sale of a complete aircraft system to a NATO and European Union member state.

Beyond the aircraft themselves, the ITS-C programme encompasses a comprehensive infrastructure overhaul. Airbus announced it will lead the redesign of the Fighter and Strike School Training Centre at the Talavera la Real Air Base in Extremadura, Spain. This modernized facility will house an Aircraft Conversion Centre and state-of-the-art synthetic training simulators developed in collaboration with Spanish defense technology firm Indra.

Two-Phase Rollout Timeline

The Airbus press release outlines a two-phase implementation strategy designed to seamlessly transition the Spanish Air and Space Force to the new system:

  • Phase 1 (2028–2030): The programme will commence with the delivery of an initial batch of 21 aircraft in their baseline configuration. Airbus will utilize one of these early jets as a prototype to integrate next-generation, Spanish-specific avionics and mission equipment. Concurrently, the ground-based training system is scheduled to become operational during the 2029–2030 academic year.
  • Phase 2 (2031–2035): During this phase, the initial 21 aircraft, alongside the remaining nine jets on order, will undergo full conversion to the finalized SAETA II standard. Simulators will be updated to match this configuration, with all deliveries and integrations slated for completion by 2035.

Strategic Autonomy and Domestic Integration

Empowering the Spanish Defense Sector

By localizing 60% of the programme’s value, Spain is deliberately insulating its pilot training ecosystem from critical foreign dependencies. While Turkish Aerospace provides the baseline HÜRJET platform, Spanish industry will be responsible for integrating the aircraft’s “brain.”

According to Airbus, several key national technology firms have been tapped for critical systems integration. GMV will provide the inertial/GPS navigation and mission computers, while Sener is tasked with the DataLink systems. Aertec will supply remote interface units, Grupo Oesía will handle audio management, and Orbital will integrate VMDR mission recorders. Indra will supply the Identification Friend or Foe (IFF) systems alongside its work on the ground simulators.

Company and government officials emphasized the strategic importance of this domestic focus during the April 28 presentation in Getafe.

“As a result of this national programme, Spain achieves three strategic milestones: we ensure technology transfer in key areas, we obtain a deep-reaching industrial return, and, above all, we provide the programme with the strategic sovereignty and independence necessary to manage the sustainment and any future evolution of the system.”

, Marta Nogueira, Head of Business Spain, Airbus Defence and Space (via Airbus press release)

“[The ITS-C] is a project that mobilises our industry, generates knowledge, employment, and opportunities throughout the entire value chain… it strengthens our strategic autonomy by allowing us to design, integrate, and evolve our own capabilities, reducing critical dependencies.”

, Amparo Valcarce, Spanish Secretary of State for Defence (via Airbus press release)

Industry research also highlights the perspective of Turkish officials. Speaking on the December 2025 contract signing, Turkey’s Defense Industry President Haluk Görgün noted the comprehensive nature of the agreement.

“This is a high-value-added, multi-dimensional defense export rather than a conventional platform sale.”

, Haluk Görgün, Turkey’s Defense Industry President (via industry research reports)

AirPro News analysis

We observe that Spain’s selection of a Turkish-designed platform over traditional Western or European trainers, such as the Boeing T-7 Red Hawk or the Leonardo M-346, signals a notable shift in the European defense procurement landscape. It demonstrates that emerging aerospace suppliers can successfully compete for top-tier NATO contracts by offering highly flexible, co-development frameworks rather than rigid, off-the-shelf products.

Furthermore, the ITS-C programme exemplifies the modern “ecosystem” approach to military procurement. Spain is not merely purchasing 30 airframes; it is investing in a holistic training architecture. By securing domestic rights to the conversion centers, synthetic ground-based simulators, and long-term maintenance, the Spanish Air and Space Force is ensuring its pilots are prepared for the digital battlefield of 4.5- and 5th-generation fighters like the Eurofighter Typhoon, without being tethered to external supply chain bottlenecks.

Frequently Asked Questions (FAQ)

What is the SAETA II?

The SAETA II is the customized Spanish variant of the Turkish Aerospace HÜRJET. It is a supersonic advanced jet trainer and light combat aircraft that will serve as the backbone of Spain’s new Integrated Combat Training System (ITS-C). The name pays homage to the Hispano HA-200 Saeta, Spain’s first indigenous jet trainer.

When will the new aircraft enter service?

According to the Airbus press release, the initial phase begins in 2028 with the delivery of the first batch of aircraft. The ground-based training system is expected to be operational by the 2029–2030 academic year, with the fully converted SAETA II fleet delivered between 2031 and 2035.

Why is Airbus involved if the aircraft is Turkish?

Airbus Defence and Space is acting as the prime contractor and national coordinator for Spain. While Turkish Aerospace manufactures the baseline HÜRJET, Airbus is leading the integration of Spanish-specific avionics, mission equipment, and ground-based training infrastructure to ensure the system meets the exact requirements of the Spanish Air and Space Force.


Sources:
Airbus Press Release: Airbus leads national industry in the launch of Spain’s new combat training system

Photo Credit: Airbus

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Advertisement
Istanbul Aviation Forum: 800+ aviation experts, 70+ speakers, 50+ exhibitors, 10+ panels
Click to comment

Leave a Reply

Defense & Military

Kratos TDI-J85 Engine Passes Multi-Config Flight Tests

Kratos validates TDI-J85 turbojet across three launch configurations, targeting 10,000 engines annually by 2029.

Published

on

Kratos TDI-J85 Engine Passes Multi-Config Flight Tests

Kratos Defense & Security Solutions has completed a series of flight tests for its TDI-J85 turbojet engine across three distinct launch configurations, validating the propulsion system for a range of low-cost cruise missiles and unmanned aerial systems.

Announced in an October 12, 2026, press release, the tests demonstrated the engine’s viability in lugged launch, palletized launch, and surface-to-surface applications. The milestone aligns with the company’s aggressive manufacturing scale-up to meet surging military demand for mass-producible precision-strike capabilities.

Advertisement
Istanbul Aviation Forum, the meeting point of the global aviation industry, April 27-28, 2027

Flight test validation and production scale-up

The recent flight tests evaluated the TDI-J85, part of the Kratos Spartan engine family, in diverse operational scenarios. By successfully deploying the engine via lugged launch, palletized systems, and surface-to-surface methods, Kratos aims to prove the platform’s adaptability for various tactical munitions and decoy systems.

“Our successful flight tests across diverse deployment methods prove the versatility and reliability of the TDI-J85 engine,” said Joseph Kovasity, Senior Vice President of Kratos TDI.

The technical validation coincides with a major industrial expansion. Kratos confirmed it has secured a 3,000-engine component order for 2027 production. The company is actively building out its manufacturing infrastructure to support an annual production capacity of more than 10,000 engines by 2029.

Kovasity noted that pairing operational success with high-rate manufacturing transforms the industry approach to affordable propulsion, demonstrating a commitment to delivering mass and capability at an unprecedented scale.

TDI-J85 specifications and the Spartan family

The TDI-J85 is a small turbojet engine designed to provide military-grade propulsion for tactical missiles and Unmanned Aerial Systems (UAS). The powerplant produces up to 200 lbf of maximum sea-level static thrust. It also features an integral generator capable of delivering up to 1.5 kW of continuous power to host vehicle systems.

Kratos President and CEO Eric DeMarco positioned the Spartan engine family as a direct response to shifting military procurement priorities, which increasingly favor volume and affordability over exquisite, low-density platforms.

“Kratos’ Spartan Family of small turbojet engines for low-cost jet drones and cruise missiles is a recent example of the success of our strategy to make the internally funded investments necessary to deliver technology rich national security systems, products, hardware, and software at the right time, with the key performance, and in the high quantities demanded to rebuild the U.S. defense inventory,” DeMarco said.

Building the affordable mass supply chain

The development of the TDI-J85 traces back to 2020, when Kratos acquired small turbojet manufacturer Technical Directions Inc. (TDI). The acquisition brought specialized small-turbine expertise in-house, allowing Kratos to vertically integrate propulsion for its own UAS platforms and offer engines directly to prime contractors.

A key application for the TDI-J85 emerged on October 16, 2023, when The Boeing Company and Kratos signed a Memorandum of Understanding. Under the agreement, the TDI-J85 provides propulsion for Boeing’s Powered Joint Direct Attack Munition (JDAM). The Powered JDAM combines a standard 500-pound ordnance with a wing kit and the Kratos turbojet, creating a low-cost, long-range strike weapon.

Anticipating demand for systems like the Powered JDAM, Kratos announced on June 9, 2026, that it was initiating internally funded long-lead material procurement to support the 3,000-unit production run in 2027. The strategy relies on a fully domestic U.S. supply chain to avoid geopolitical bottlenecks and ensure rapid scalability.

AirPro News analysis

We view Kratos’ target of 10,000 engines annually by 2029 as a stark indicator of where munitions procurement is heading. Traditional aerospace prime contractors typically measure turbine engine production in the hundreds per year. Scaling to 10,000 units requires automotive-style manufacturing techniques and a fundamental departure from bespoke aerospace engineering. If Kratos can achieve this volume while maintaining the reliability demonstrated in the October 12 flight tests, the company will be uniquely positioned to dominate the propulsion market for the next generation of attritable, mass-deployed munitions. The idiosyncratic reference to the “Department of War” in the company’s press materials underscores a wartime-footing mentality that is increasingly driving internal investment decisions across the mid-tier defense sector.

Photo Credit: Kratos Defense & Security Solutions

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Defense & Military

USAF Renews PTC Servigistics Contract for ESCAPE Program

The U.S. Air Force renewed its Servigistics contract with PTC to manage a $76 billion service parts network using AI.

Published

on

USAF Renews PTC Servigistics Contract for ESCAPE Program

PTC Inc. and the United States Air Force (USAF) have renewed a contract to utilize the Servigistics supply chain optimization platform, integrating artificial intelligence to manage a $76 billion global service parts network.

The agreement, announced in an October 15, 2026 press release, extends the military branch’s Enterprise Supply Chain Analysis, Planning, and Execution (ESCAPE) program. The latest phase of the partnership focuses on exception-based management to automate routine workflows and align inventory decisions directly with aircraft availability objectives.

Advertisement
Istanbul Aviation Forum, the meeting point of the global aviation industry, April 27-28, 2027

Advancing the ESCAPE program with artificial intelligence

The renewed contract enables the USAF to deploy artificial intelligence and exception-based management tools across its logistics network. These capabilities allow supply chain planners to automate standard inventory workflows and focus their attention on critical interventions that directly impact fleet readiness.

Abigail Strobell, Deputy Chief of the USAF, emphasized the operational necessity of the software upgrade in managing global defense logistics.

“Readiness depends on our ability to anticipate requirements and make effective supply chain decisions in an increasingly complex operational environment,” Strobell said. “Our continued use of Servigistics enables us to build on the progress we have made in modernizing service parts planning and strengthen the supply chain capabilities that support aircraft availability.”

A decade of supply chain modernization

The relationship between the Boston-based software provider and the USAF spans nearly ten years. The military branch initially selected the Servigistics Software as a Service (SaaS) solution on January 31, 2017. At that time, the platform was tasked with optimizing a global supply chain encompassing over 5,000 aircraft and 650,000 individual items distributed across 1,500 locations.

The partnership deepened on January 18, 2022, when PTC announced a five-year expansion contract valued at up to $95 million. That agreement formally integrated Servigistics into the ESCAPE program, which is managed by the 3,000 personnel of the USAF Sustainment Center’s 448th Supply Chain Management Wing.

While the October 15, 2026 announcement confirmed the continuation of the ESCAPE program integration, PTC did not disclose the specific financial value or the exact term length of the renewed contract.

Broader aerospace and defense adoption

The USAF renewal highlights the established role of Servigistics within the aerospace and defense sector. Beyond the Air Force, the platform is currently deployed by the United States Navy and the United States Coast Guard to manage complex military logistics.

Major original equipment manufacturers (OEMs) and defense contractors, including Lockheed Martin, Northrop Grumman, and Boeing, also utilize the software to optimize their service supply chains.

PTC employs over 7,000 people and provides digital transformation and product lifecycle solutions to more than 30,000 customers globally.

AirPro News analysis

The USAF decision to integrate artificial intelligence into the ESCAPE program illustrates a necessary shift in military logistics from reactive tracking to predictive management. Managing a $76 billion parts inventory across thousands of aging and next-generation aircraft requires processing data at a scale that manual planning cannot sustain. By shifting to exception-based management, we see the USAF acknowledging that human planners are best utilized for resolving critical bottlenecks rather than executing routine reorders. This contract renewal suggests that the Department of Defense views commercial off-the-shelf AI supply chain solutions as a faster route to improved fleet readiness than developing bespoke internal systems.

Photo Credit: PTC Inc.

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading

Defense & Military

F-22 Raptor Pilot Controls Anduril YFQ-44A Fury Drone in Flight

A USAF F-22 pilot directed an Anduril YFQ-44A Fury drone in flight in October 2026, validating the CCA airborne quarterback concept.

Published

on

F-22 Raptor Pilot Controls Anduril YFQ-44A Fury Drone in Flight

A United States Air Force (USAF) Lockheed Martin F-22 Raptor pilot successfully executed airborne tactical command and in-flight control of an Anduril Industries YFQ-44A Collaborative Combat Aircraft (CCA) during a flight test in early October 2026.

The Department of the Air Force announced the milestone in an October 16, 2026, press release. The event marks the first time a crewed fighter has directed a semi-autonomous uncrewed wingman in flight, validating the “airborne quarterback” concept central to the military branch’s future air combat strategy.

Advertisement
Istanbul Aviation Forum, the meeting point of the global aviation industry, April 27-28, 2027

Validating the airborne quarterback concept

The flight test involved personnel from the 412th Test Wing at Edwards Air Force Base in California and the 422nd Test and Evaluation Squadron at Nellis Air Force Base in Nevada. The effort also integrated teams from the 309th Software Engineering Group, the Experimental Operations Unit, the F-22 System Program Office, and the CCA Software Autonomy and Teaming Branch. During the sortie, the F-22 pilot issued high-level tactical directives to the YFQ-44A, which operated semi-autonomously to execute the commands.

Air Force Chief of Staff Gen. Ken Wilsbach stated the flight demonstrates the power of crewed-uncrewed teaming and the advantage it provides to warfighters.

“We must test often, learn fast and give commanders what they need, when they need it,” Wilsbach said in the official release.

Secretary of the Air Force Troy Meink emphasized the rapid development cycle required to field these systems.

“This achievement demonstrates what is possible when we are aligned with industry on a shared imperative: delivering capability to the warfighter at unprecedented speed,” Meink said. “We are driving urgency into every part of acquisition from rapid integration and flight learning to disciplined assessment, so we can turn promising technology into combat capability at the pace the threat demands.”

The path to Increment 1 fielding

The Collaborative Combat Aircraft program is a USAF initiative designed to develop semi-autonomous uncrewed aircraft that will fly alongside crewed fighters. These include the F-22, the Lockheed Martin F-35 Lightning II, and the future Next-Generation Air Dominance (NGAD) platform. The F-22 Raptor serves as the threshold platform for the program, designating it as the first crewed aircraft integrated to pair with and control the drones in flight.

The YFQ-44A Fury originated with Blue Force Technologies, a drone manufacturer acquired by Anduril Industries in September 2023. The aircraft is a fighter-like uncrewed combat aerial vehicle powered by a Williams FJ44-4M turbofan engine. It is engineered to pull up to 9g and fly at speeds reaching Mach 0.95.

The October 2026 tactical control demonstration follows a series of rapid developmental milestones. Earlier in 2026, a Fury drone successfully launched an AIM-120 Advanced Medium-Range Air-to-Air Missile (AMRAAM). In September 2026, Anduril conducted tests involving the Fury flying in formation with F-35 fighters, although the crewed aircraft were not yet issuing mid-air commands during those sorties.

On September 14, 2026, the Air Force officially named the two Increment 1 CCA designs: the Anduril FQ-44 Fury and the General Atomics FQ-42 Vengeance. General Atomics serves as the other prime contractor for the first increment of the program.

Shifting air combat strategy toward affordable mass

The CCA program represents a fundamental shift in military aviation strategy. The USAF is moving toward a concept of affordable mass, pairing highly capable and expensive crewed fighters with cheaper, semi-attritable uncrewed systems.

The Department of the Air Force intends to have 500 combat-ready, semi-autonomous CCA systems in service by 2032. The overall planned fleet size for the program is projected to reach 1,000 aircraft.

AirPro News analysis

The successful integration of the F-22 Raptor with the YFQ-44A Fury marks a critical transition from theoretical doctrine to operational reality. By proving that a single pilot can manage a semi-autonomous wingman while flying a fifth-generation fighter, the USAF has cleared a major technical hurdle in the Collaborative Combat Aircraft program. We view this milestone as a strong indicator that the aggressive 2032 fielding timeline for 500 combat-ready systems remains viable. Establishing the F-22 as the threshold platform provides a mature testing environment that will likely accelerate the eventual integration of these uncrewed systems with the F-35 and the Next-Generation Air Dominance platform.

Photo Credit: US Air Force – Senior Airman Renee Blundon

See more AirPro News in Google. Add AirPro News as a preferred source and our stories will appear more often in your Top Stories.
Continue Reading
Advertisement

Follow Us

AirPro Atlas

Explore aviation on one 3D globe
4,000+ airports, 620+ active airlines, 180+ launch pads and 30 aircraft plants and boneyards, with live weather and launch countdowns.
Open the Atlas

aviation newsletter

Latest

Categories

Tags

Popular News