Defense & Military
Textron Aviation Defense Secures $150M Contract for T-6 Texan II Sustainment
Textron Aviation Defense receives a $150 million contract modification to support sustainment of over 700 U.S. military Beechcraft T-6 Texan II aircraft.

This article is based on an official press release from Textron Aviation Defense.
On April 13, 2026, Textron Aviation Defense LLC, a subsidiary of Textron Inc., announced the receipt of a five-year U.S. government contracts modification valued at over $150 million. The agreement provides Sustaining Engineering and Program Management (SEPM) services for the U.S. military’s fleet of more than 700 Beechcraft T-6 Texan II aircraft.
This contract extends a previous agreement first awarded in 2021, ensuring the continued operational readiness of the primary flight training pipeline for the U.S. Air Force, Navy, and Army. According to the official press release, the modification covers sustaining and systems engineering, program management, and support for maintenance, repairs, modifications, and structural integrity programs.
Contract Details and Scope
Expanding the Sustainment Ceiling
The specific modification, identified in Department of Defense contract announcements as P00015 to contract FA8106-21-D-0001, is valued at exactly $150,176,268. According to Textron’s announcement, this action more than doubles the cumulative face value ceiling of the SEPM contract, raising it from $240 million to a new maximum of $510 million.
Work will be performed primarily at Textron Aviation Defense facilities in Wichita, Kansas, with an expected completion date of April 12, 2031. Initial funding for the effort includes $11,827,632 in Fiscal 2026 operations and maintenance funds, which were obligated at the time of the award, according to defense contract records.
The Beechcraft T-6 Texan II Fleet
Supporting Multiple Military Branches
The SEPM contract covers three specific U.S. military variants of the single-engine turboprop trainer. Introduced in 2001 to replace the aging Cessna T-37B Tweet and T-34C Turbo Mentor, the T-6 has become the backbone of U.S. military flight training.
The T-6A is utilized by the U.S. Air Force and Navy for basic pilot training, featuring a mix of analog and digital avionics. The U.S. Navy also operates the T-6B, an upgraded variant equipped with a fully integrated digital glass cockpit, a Head-Up Display (HUD), and Hands-On Throttle And Stick (HOTAS) controls. Finally, the U.S. Army utilizes the T-6D for operational support, testing, and utility roles.
Textron Aviation Defense President and CEO Travis Tyler, who assumed his leadership role in November 2024, emphasized the importance of the platform’s reliability in the company’s official statement.
“Our focus remains on sustaining aircraft availability and supporting our customers as they train the next generation of military pilots,” Tyler stated.
Global Reach and Manufacturing Maturity
International Expansion
While the U.S. military operates over 700 T-6 aircraft, the platform’s global footprint is significantly larger. Industry data indicates that the global fleet exceeds 1,000 units, accumulating more than 5 million flight hours since its introduction. The aircraft is currently utilized by 15 countries and two NATO military flight schools, including the Euro NATO Joint Jet Pilot Training Program.
Recent international sales have further expanded this footprint. In late 2024, Textron began delivering a fleet of 12 T-6C aircraft to the Vietnam Air Defense Air Force. Furthermore, in January 2025, the Japan Air Self-Defense Force selected the T-6 to replace its aging Fuji T-7 trainers, according to international defense reporting.
AirPro News analysis
We view this contract extension as a critical indicator of the Department of Defense’s ongoing reliance on the T-6 platform amidst broader pilot pipeline challenges. The U.S. military has faced persistent pilot shortages and training backlogs; maintaining the operational readiness of the 700-plus T-6 fleet is a national security priority, as nearly every Air Force and Navy pilot must pass through this airframe before advancing to fighter, bomber, or transport aircraft.
For Textron Inc., sustainment contracts of this nature provide highly predictable, long-term recurring revenue. The $270 million increase to the contract ceiling underscores the financial stability of mature defense programs. We note that Textron frequently highlights the T-6 production line as operating at a Manufacturing Readiness Level (MRL) of 10, the highest standard recognized by the DoD, ensuring a fully optimized supply chain for these critical sustainment efforts.
Frequently Asked Questions
What is the Beechcraft T-6 Texan II?
The Beechcraft T-6 Texan II is a single-engine turboprop aircraft used primarily as a foundational flight trainer for U.S. and allied military pilots. It is based on the Pilatus PC-9 airframe.
How much is the new Textron contract worth?
The recent modification is valued at over $150 million, which raises the total potential ceiling of the five-year sustainment contract from $240 million to $510 million.
Where will the sustainment work take place?
The engineering and program management work will be performed primarily at Textron Aviation Defense facilities located in Wichita, Kansas.
Sources
Photo Credit: Textron Aviation
Defense & Military
CBP AMO Orders 10 Airbus H125 Helicopters for Fleet Expansion
CBP Air and Marine Operations contracts for 10 Airbus H125 helicopters, expanding a 30-year fleet of over 100 rotary-wing aircraft.

U.S. Customs and Border Protection Air and Marine Operations (CBP AMO) has finalized a contract to acquire 10 additional Airbus H125 helicopters, expanding a fleet modernization effort that relies heavily on the single-engine platform for border security and law enforcement missions.
In a press release issued on July 7, 2026, Airbus confirmed the agreement, which reinforces a three-decade relationship between the federal agency and the aerospace manufacturer. The new helicopters will be assembled at the Airbus Helicopters production facility in Columbus, Mississippi.
Expanding the airborne law enforcement fleet
The latest acquisition builds upon a previous order placed in August 2020, when CBP AMO contracted for 16 H125 helicopters to upgrade its aging rotary-wing assets. The agency currently operates a total fleet of more than 240 aircraft, which includes over 100 helicopters from the Airbus H120 and H125 families delivered over the past 30 years.
The H125, formerly known as the Eurocopter AS350, is utilized by CBP AMO for a variety of demanding flight profiles, including border surveillance, suspect pursuit, and general public safety operations across the United States.
Bart Reijnen, Head of the North America Region for Airbus Helicopters, stated that the expansion “underscores the long-standing collaboration” between the manufacturer and the federal agency. He added that the selection highlights the trust placed in the H125 to execute critical public safety missions under demanding conditions, with Airbus committing to provide comprehensive services to maintain mission readiness.
Virtual reality integration for pilot training
As CBP AMO increases its H125 inventory, the agency is simultaneously overhauling how it trains the personnel who fly them. In November 2025, CBP became the first federal law enforcement agency and the first branch of the U.S. Department of Homeland Security (DHS) to integrate virtual reality into its aerial training program.
According to reporting by FLYING Magazine, the agency awarded a contract to adopt an FAA-qualified Airbus H125 virtual reality flight simulator developed by Loft Dynamics. The simulator is being installed at the CBP AMO training center in Oklahoma City, where it will be used to train the agency’s roster of more than 600 pilots.
AirPro News analysis
We view CBP AMO’s continued investment in the H125 platform as a clear indicator of the agency’s preference for fleet commonality. Operating a standardized fleet of over 100 H125-family helicopters significantly reduces maintenance overhead, streamlines supply chains, and simplifies pilot transition training. Furthermore, Airbus’s strategy of assembling these aircraft in Columbus, Mississippi, likely plays a crucial role in navigating federal procurement requirements, ensuring that the European manufacturer remains highly competitive for U.S. government contracts. The parallel investment in Loft Dynamics’ VR simulators suggests the agency is preparing for a sustained, long-term operational lifespan for the H125 fleet.
Sources: Airbus
Photo Credit: Airbus
Defense & Military
Bombardier Defense Signs 10-Year Support Deal With Sweden
Bombardier Defense and FMV finalized a 10-year support agreement for Sweden’s two Global 6500 TP 106 military transport aircraft.

Bombardier Defense and the Swedish Defence Materiel Administration (FMV) finalized a 10-year Services Support Agreement on July 22, 2026, securing long-term maintenance and operational readiness for Sweden’s newly acquired fleet of two Global 6500 transport aircraft.
Announced during the Farnborough International Airshow in a company press release, the agreement enrolls the Swedish Armed Forces (SWEAF) in Bombardier’s Smart Services Defense program. The comprehensive support package covers parts, labor, and engineering expertise for the aircraft, which are designated as the TP 106 in Swedish military service and replace the nation’s aging Gulfstream IV and Gulfstream G550 head-of-state transport fleet.
Fleet modernization and delivery timeline
The targeted acquisition deal for the two aircraft was valued at SEK 1.1 billion ($113 million) and formalized in May 2025, according to reporting by Aviation International News. The rapid procurement was enabled by utilizing existing airframes previously operated in Bombardier’s demonstration fleet, which were subsequently modified to meet Swedish Military-Aircraft requirements.
The formal handover of the aircraft took place on June 1, 2026, at the Uppland Wing F 16, as reported by Nordic Defence Sector. The aircraft will be operated by the 75th Swedish Civil Aviation Squadron at Skaraborg’s F7 Air Fleet, based at Stockholm Arlanda Airports (ARN), primarily conducting VIP and head-of-state transport missions.
Smart Services Defense and operational commonality
The 10-year agreement provides comprehensive cost coverage and logistical support for the new fleet. Bombardier stated the program includes landing gear and auxiliary power unit maintenance, ground support equipment, technical assistance, and access to mobile response teams.
Paul Sislian, Bombardier’s Executive Vice President of Aircraft Sales and Aftermarket Services, noted the program provides seamless original equipment OEMs support for the Swedish military.
“Through our Smart Services Defense program, the Swedish Armed Forces will benefit from seamless OEM support, enhanced readiness and predictable lifestyle costs, giving them the confidence to stay focused on the mission while we support their aircraft every step of the way,” Sislian said.
The selection of the Global 6500 platform offers strategic maintenance and operational commonality with Sweden’s incoming airborne early warning and control (AEW&C) fleet. The Swedish Armed Forces are procuring the Saab GlobalEye, designated the S 106, which is also built upon the Bombardier Global aircraft family architecture.
AirPro News analysis
The 10-year support agreement underscores a growing trend among defense ministries to rely on commercial OEMs for turnkey lifecycle support rather than developing bespoke military maintenance pipelines for commercial derivative aircraft. By aligning the TP 106 VIP transport fleet with the underlying platform of the S 106 GlobalEye, the Swedish Armed Forces are establishing a unified logistical footprint. We view this procurement Strategy as a highly efficient approach to fleet modernization, reducing training burdens for maintenance personnel and ensuring higher dispatch reliability through Bombardier’s established global civilian support network.
Sources: Bombardier
Photo Credit: Bombardier
Defense & Military
EU Funds SHARP Project for Next-Gen Military Helicopter Engine
The EU allocated €25M to the SHARP consortium, 25 partners from 12 countries developing Europe’s next military helicopter engine by 2040.

The European Commission has allocated approximately €25 million through the European Defence Fund to back a multinational consortium developing the propulsion architecture for Europe’s next generation of military helicopters.
Announced on June 11, 2026, at the ILA Berlin airshow, the Sovereign High-performance Architecture for Rotorcraft Propulsion (SHARP) project brings together 25 partners from 12 European countries. According to a joint press release from Safran Helicopter Engines, MTU Aero Engines, and Avio Aero, the initiative will establish the technological foundation for the European Next Generation Helicopter Engine (ENGHE), which is targeted to enter service in 2040.
Addressing an aging military rotorcraft fleet
The SHARP initiative aligns with broader European defense goals to replace a rapidly aging fleet of military aircraft under the Next Generation Rotorcraft Capability (NGRC) and European Next Generation Rotorcraft Technologies (ENGRT) programs. The current European inventory includes approximately 1,800 transport helicopters and 600 combat helicopters, which currently average 20 years of age. By the 2040s, many of these aircraft will have been in service for over 50 years.
“In light of a continuously aging European fleet of military helicopters the need is obvious: From 2040 onwards, a large proportion of these rotorcraft will have to be replaced,” said Dr. Ottmar Pfänder, Chief Program Officer at MTU Aero Engines. “We joined forces across the continent to underline the importance of this technology program. It will further reinforce European sovereignty and strengthen the European supply chain.”
The funding will be used to develop scalable technological building blocks that can be adapted to various weight classes and mission profiles required by future European armed forces.
Collaborative framework and European sovereignty
The SHARP project builds upon the foundation of the EUropean Military Rotorcraft Engine Alliance (EURA), a 50/50 joint venture established in July 2024 between Safran Helicopter Engines and MTU Aero Engines specifically to develop the ENGHE. The consortium has now expanded to include Avio Aero, broadening the industrial base tasked with designing the new powerplant.
Safran Helicopter Engines CEO Cédric Goubet stated that the funding demonstrates Europe’s commitment to self-reliance and technological sovereignty for future military platforms, thanking the European Union and participating nations for their confidence in the consortium’s capabilities.
“SHARP marks an important milestone in the journey toward Europe’s next-generation rotorcraft engine and reinforces the value of collaboration in developing sovereign, high-performance propulsion technologies,” said Riccardo Procacci, CEO of Avio Aero. “We are proud to partner with EURA on this initiative, contributing within a fully European framework while leveraging Avio Aero’s well-established expertise and know-how.”
EURA CEO Wolfgang Gärtner confirmed that the joint venture is prepared to coordinate the multinational team to provide modern technologies to European forces.
AirPro News analysis
The €25 million European Defence Fund grant represents a critical early step in aligning Europe’s fragmented defense aerospace sector behind a single rotorcraft propulsion program. By formalizing the SHARP consortium now, the European Union is actively working to prevent the development of competing, incompatible national engine programs that have historically complicated European defense procurement and increased long-term maintenance costs. We view the inclusion of Avio Aero alongside the EURA joint venture as a strong indicator that the ENGHE program is successfully consolidating the continent’s primary propulsion manufacturers ahead of the 2040 target.
Sources: Safran Group
Photo Credit: Safran Group
-
Aircraft Orders & Deliveries20 hours agoAerCap Orders 15 Boeing 787-9 Dreamliners at Farnborough 2026
-
Aircraft Orders & Deliveries17 hours agoPhilippine Airlines Orders Up to 20 Boeing 787-10 Dreamliners
-
Aircraft Orders & Deliveries15 hours agoRiyadh Air Orders 31 A350-1000s and 67 Boeing 787s
-
Commercial Aviation15 hours agoIndiGo Signs Record 1000 LEAP-1A Engine MoU with CFM
-
Aircraft Orders & Deliveries22 hours agoSMBC Aviation Capital Orders 100 Boeing 737 MAX at Farnborough
