MRO & Manufacturing
voestalpine Secures €1 Billion Aerospace Orders from Airbus
voestalpine AG wins €1 billion aerospace contracts from Airbus for high-performance materials and forged parts, supporting aircraft production and sustainability goals.

This article is based on an official press release from voestalpine AG.
We are tracking a major development in the European aerospace supply chain this week. According to an official press release issued on April 8, 2026, the Austrian steel and technology group voestalpine AG has secured aerospace sector orders valued at approximately €1 billion. The contracts, which span the next five years (2026–2031), were awarded primarily by the European aircraft manufacturer Airbus.
The agreement represents the largest order volume in the aerospace sector in voestalpine’s corporate history. The company noted in its release that the contract covers the supply of high-performance materials, complex forged parts, and comprehensive global logistics services to support Airbus’s ongoing production needs.
As global Airlines continue to modernize and expand their fleets, the demand for short- and medium-haul aircraft has surged. This €1 billion agreement underscores the critical role of advanced materials in meeting the aerospace industry’s aggressive production targets and stringent performance standards.
Contract Details and Manufacturing Scope
Global Production and Logistics
The execution of this massive contract will be handled by voestalpine’s High Performance Metals Division. According to the company’s announcement, manufacturing will be distributed across multiple international facilities to ensure supply chain resilience. Production will take place at voestalpine’s Styrian sites in Kapfenberg and Mürzzuschlag, Austria, as well as at its Brazilian subsidiary, Villares Metals, located in Sumaré.
The High Performance Metals Division is a significant driver of the group’s specialized output. Based on the company’s financial data for the 2024/25 business year, this specific division generated €3.2 billion in revenue, with 55% generated outside of Europe, and reported an operating result (EBITDA) of €83 million, employing roughly 11,700 people worldwide.
High-Performance Materials for Modern Aircraft
The materials supplied under this contract are engineered to withstand extreme aerospace conditions, including severe temperature fluctuations, rotational forces, and heavy mechanical stress. The press release details that voestalpine will provide high-performance materials such as bars, sections, sheets, and plates composed primarily of nickel-based alloys, high-alloy steels, and titanium alloys.
In addition to raw materials, voestalpine will supply special forged parts that are delivered “ready-to-install.” These critical components will be utilized in the manufacturing of aircraft fuselages, engines, and landing gear. The company confirmed that the parts are slated for installation in some of the world’s most common passenger aircraft, specifically targeting the Airbus A320, A330, and A350 families.
Strategic Growth and Industry Demand
The record-breaking order highlights voestalpine’s entrenched position within the global aviation supply chain. The company asserts that its high-tech products are present in virtually every civil aircraft currently in operation, a footprint that will only expand with this new Airbus agreement.
“These major orders are a strong signal of our innovative strength and our role as a strategic partner to the international aerospace industry. Virtually every civil aircraft flies with a high-tech product made by voestalpine. We are actively shaping the future of flying with high-performance materials and intelligent services.”
Herbert Eibensteiner, CEO of voestalpine AG, via the official press release.
To contextualize the scale of the supplier, voestalpine AG operates roughly 500 group companies across more than 50 countries. In the 2024/25 business year, the overarching group generated €15.7 billion in revenue and an EBITDA of €1.3 billion, supported by a global workforce of approximately 49,700 employees.
The Intersection of Heavy Industry and Sustainability
AirPro News analysis
Fulfilling a €1 billion contract over five years will require significant operational scaling from voestalpine. However, the most compelling aspect of this deal is its timing. This massive aerospace order coincides directly with voestalpine’s ambitious environmental transformation, known as the “greentec steel” program.
According to the company’s public roadmap, the greentec steel initiative is Austria’s largest climate protection program, backed by a €1.5 billion investment. By 2027, voestalpine plans to replace traditional coal-based blast furnaces with electric arc furnaces (EAFs) powered by green electricity at its Linz and Donawitz sites. The company projects this transition will reduce its carbon emissions by 30% by 2029, saving up to 4 million tons of CO2 annually, a figure that represents roughly 5% of Austria’s total national emissions.
For the aerospace sector, which is under immense pressure to decarbonize its entire lifecycle, this is a vital development. voestalpine is actively researching new manufacturing “recipes” to produce aerospace-grade steel using scrap, hot briquetted iron, and green electricity. By securing its supply chain with a partner actively decarbonizing its heavy industrial processes, Airbus is indirectly lowering the carbon footprint of the raw materials that make up its A320, A330, and A350 aircraft. We view this contract not just as a logistical win for voestalpine, but as a strategic alignment of aerospace manufacturing with next-generation green technology steel production.
Frequently Asked Questions
What is the value of the voestalpine aerospace order?
According to the company’s press release, the aerospace orders are worth approximately €1 billion and will be fulfilled over a five-year period from 2026 to 2031.
Which aircraft will use these voestalpine components?
The high-performance materials and ready-to-install forged parts will be used primarily by Airbus for its A320, A330, and A350 passenger aircraft families. The components are critical for fuselages, engines, and landing gear.
Where will the aerospace parts be manufactured?
Manufacturing will take place at voestalpine’s High Performance Metals Division sites in Kapfenberg and Mürzzuschlag, Austria, as well as at Villares Metals in Sumaré, Brazil.
Sources
MRO & Manufacturing
Fraunhofer Develops Laser Repair Process for Worn Landing Gear Parts
Fraunhofer ILT’s LEGATO project pairs EHLA laser deposition with roller burnishing to restore worn landing gear parts instead of replacing them.

The Fraunhofer Institute for Laser Technology ILT is developing a laser-based process chain to restore worn high-strength landing gear components instead of replacing them, with landing gear manufacturer Liebherr-Aerospace as an industry partner. The project, called LEGATO, pairs extreme high-speed laser material deposition (EHLA) with roller burnishing in a single machine setup.
Fraunhofer ILT, based in Aachen, Germany, described the work in a press release dated November 12, 2026. The institute said that when too much material is lost from a landing gear component, replacement is often the only option, which raises costs, extends downtime and consumes resources. It also said further development and qualification are needed before the method becomes a standardized aerospace repair process.
Why landing gear parts are hard to repair
Landing gear is among the most heavily loaded parts of an aircraft, according to the institute. Wheel axles, pistons and pins carry large forces during takeoff, landing and taxiing, and friction and repeated loading cause wear, while moisture, chemicals, ice, sand and dust promote corrosion.
During maintenance, components are removed, cleaned, inspected and measured, and minor damage is ground away within repair limits. Hard chromium plating has traditionally protected these surfaces, but Fraunhofer ILT said stricter environmental and occupational safety rules are driving demand for alternatives. Conventional welding is only partly suitable, the release states: excess heat can alter the microstructure of high-strength aerospace steels, affect their properties and distort geometry. A repair therefore has to restore lost material precisely and form a reliable metallurgical bond with limited heat input.
How the EHLA and SCaRB process chain works
“Our research focuses on three steps,” said project manager Kim Julia Kallies. Those steps are restoring material locally, tailoring the mechanical properties of the surface layer and inspecting the coating reliably.
EHLA is a high-speed variant of laser metal deposition that melts metallic powder onto the surface. Fraunhofer ILT said its high speed and relatively low heat input make it promising for heat-sensitive, high-strength materials. The team has repaired 300M steel with matching material. For corrosion-resistant coatings, it is testing a martensitic stainless steel developed for EHLA and studying 15-5PH, a high-strength, corrosion-resistant steel used in landing gear structures.
Because EHLA runs at speeds closer to machining speeds, the institute can combine it with roller burnishing in one sequence, an approach it calls Simultaneous Coating and Roller Burnishing (SCaRB). A burnishing tool developed by Hegenscheidt-MFD and integrated into the machine turret follows the laser at a set distance. The component does not need to be re-clamped, which reduces setup time, and residual heat from deposition keeps the new layer deformable. “The key for us is to use the layer while it is still warm,” Kallies said.
The laser-to-roller distance affects surface characteristics, hardness and residual stresses. Burnishing force is set by feed rate, and interchangeable rollers select radius and hardness. According to the release, deposition can create tensile stresses that promote fatigue cracks, and burnishing can reduce those stresses or convert them to compressive stresses while smoothing the layer and increasing near-surface hardness. The next phase will study how SCaRB-introduced residual stresses affect service life.
Inspection and the industrial partners
The Fraunhofer Institute for Material and Beam Technology IWS contributes LAwave, a laser-induced surface acoustic wave spectroscopy method for non-destructive analysis of the near-surface properties of the coating and the underlying material. On its LAwave page, Fraunhofer IWS says a measurement takes less than one minute and that more than 35 stationary instruments are in use worldwide.
Liebherr-Aerospace contributes practical requirements on components, damage patterns, materials, hardness, surface quality and low heat input. “What matters is whether the process is suitable for real landing gear components under load,” said Harald Betsch, Senior Expert Thermal Spraying/Welding in Materials and Processes at Liebherr-Aerospace. Hegenscheidt-MFD, an associated partner, brings expertise in roller burnishing and deep rolling.
From coating process to landing gear repair
According to a Fraunhofer ILT brochure, EHLA was developed by Fraunhofer ILT and RWTH Aachen University and reaches feed rates of 50 to 500 meters per minute, against 0.5 to 2 meters per minute for conventional laser material deposition, with layers of 25 to 250 micrometers. The brochure says its thermal effect is in the micrometer range rather than millimeters, and describes it as the first economical alternative to hard chrome plating, which it says has required a special permit since September 2017.
The release links to a paper in the Journal of Laser Applications, published October 16, 2025, by authors from Fraunhofer ILT, Liebherr-Aerospace Lindenberg GmbH and Hegenscheidt-MFD GmbH. It reported that combining EHLA with simultaneous roller burnishing improved surface roughness, microhardness and residual stress distribution. Surface finish was best at a moderate offset of 4 mm, the highest hardness came at the smallest offset of 1 mm, and all burnishing strategies converted high subsurface tensile stresses into compressive stresses. The authors said further studies are needed to link these stress profiles to fatigue resistance under service-relevant loads.
On the regulatory side, the EU Chemicals Platform reports that the European Chemicals Agency’s (ECHA) Committee for Socio-Economic Analysis agreed a draft opinion on a proposed EU-wide restriction of thirteen hexavalent chromium compounds. It names aerospace among the industries most affected and says many of them rely on chromium-based electroplating, primers and anti-corrosion coatings.
What it means for landing gear maintenance, repair and overhaul
The research comes as Liebherr-Aerospace widens its landing gear maintenance, repair and overhaul (MRO) work. Liebherr-Aerospace Lindenberg GmbH developed, manufactured and certified the Airbus A350 nose landing gear. Liebherr announced on April 17, 2026, that it had started its first A350 nose landing gear overhaul at Lindenberg.
When Liebherr announced its A350 overhaul agreement with Finnair on May 22, 2026, covering a campaign that runs through 2034, Alex Vlielander, Chief Customer Officer at Liebherr-Aerospace & Transportation SAS, said, “The industry is moving now into the next global landing gear overhaul wave.” In September 2026, Liebherr agreed to run an exchange and overhaul program for China Airlines covering the nose landing gear of its 18 Airbus A350 aircraft through 2031.
The release gives no qualification timeline and names no aircraft program. The team is transferring its findings to real component geometries and representative loads. In the longer term, LEGATO aims for a fully integrated digital chain in one setup without re-clamping: automated scanning, calculation of damage and material loss, deposition tool-path planning, EHLA repair, SCaRB finishing, targeted polishing or grinding, and non-destructive inspection.
Fraunhofer ILT lists Formnext 2026 in Frankfurt am Main, November 17 to 20, 2026, alongside the release; it exhibits in Hall 11.0, booth D31.
MRO & Manufacturing
Duncan Aviation Reopens Engine Rapid Response at Centennial Airport
Duncan Aviation has reopened its Engine Rapid Response Team location at Centennial Airport, where it ran an RRT site from 1994 to 2021.

Duncan Aviation has reopened its Engine Rapid Response Team (RRT) location at Centennial Airport (APA) in Englewood, Colorado, putting a dedicated engine technician back on a field where the company ran an RRT location from 1994 to 2021. The site covers all models of the Honeywell HTF7000 and TFE731 and the Pratt & Whitney PW300 and PW500 series, with line maintenance, scheduled minor inspections and Aircraft on Ground (AOG) dispatch.
The Lincoln, Nebraska, maintenance, repair and overhaul (MRO) provider announced the reopening in a press release dated November 10, 2026. The team sits next to Duncan Aviation’s existing Satellite shop at APA and serves business aircraft operators in the greater Denver area and surrounding regions, including Fort Collins and Broomfield.
What the Centennial engine team will handle
Engine Technician James Higgins is stationed at APA to oversee local support and regional dispatches. According to the company, he is backed by a fully equipped mobile unit, specialized tooling and dedicated local inventory. Duncan said the location lets operators get common engine maintenance and AOG support without moving their aircraft to a major maintenance facility.
The release lists the work by engine family. For the Honeywell HTF7000, it covers scheduled and unscheduled maintenance including bimodal repair, fan balancing, borescope inspections and Spectrometric Oil Analysis Program (SOAP) sampling for engines and auxiliary power units (APUs). For the Honeywell TFE731, the scope adds front-end work down to planetary access and repair, back-end access, interstage turbine temperature (ITT) harness troubleshooting and replacement, and accessory gearbox (AGB) work.
For the Pratt & Whitney PW300 and PW500 series, Duncan lists scheduled and unscheduled maintenance including hot section inspections (HSIs) on PW500 series engines, fan balancing, borescope inspections and SOAP sampling. The company said Higgins can work on PW300 series engines beyond the low-pressure turbine (LPT) section, is expanding his PW300 expertise and is scheduled for additional factory training. The release does not say when that training will take place.
“We are excited to re-establish our local Engine Rapid Response presence at Centennial Airport,” said Shane Heier, Engine Rapid Response Manager at Duncan Aviation. Heier said that with nearly 150 operators based at APA and steady demand for localized AOG support across Colorado, having a dedicated engine technician on the field allows the company to respond immediately when customers need it most.
The business jets behind the four engine families
Honeywell lists the Bombardier Challenger 300 and Challenger 350, the Citation Longitude, the Embraer Legacy 450/500, the Embraer Praetor 500/600 and the Gulfstream G280 among HTF7000 platforms. The manufacturer says the HTF7000 family has logged more than 12 million flight hours, with takeoff thrust listed at 6500-7500 lbf.
The TFE731, first certified in 1972, has been produced in twenty models with more than 13,000 units built, according to Honeywell, which names the Bombardier Learjet 70/75, Dassault Falcon 900 and Gulfstream 150 among its platforms. Honeywell’s specifications cite 108 million flight hours to date and 9,400 engines still in service.
Pratt & Whitney says its PW300 family, four engine series and 13 models rated from 4,700 to 8,000 pounds of thrust, powers the majority of mid-size jets. It describes the PW500, three series and eight models rated from 2,900 to 4,500 pounds of thrust, as the leading engine for fractional business aviation, built for light to mid-size business jets.
Duncan Aviation’s engine investments in its 70th year
Founded in 1956 as a single-hangar operation, Duncan Aviation is marking its 70th anniversary in 2026. It runs full-service facilities in Battle Creek, Michigan; Lincoln, Nebraska; and Provo, Utah, and the company says dozens of other regional facilities across the United States provide scheduled support and rapid response for avionics, engine and airframe AOG situations.
The Centennial reopening follows other Duncan engine investments in 2026. In a release dated April 7, 2026, Duncan said five engine technicians had completed four weeks of factory-led training on the PW308A and PW308C at its Pratt & Whitney Canada Designated Overhaul Facility (DOF) in Lincoln, a step covered in AirPro News’ report on its PW308 overhaul capabilities. The company said the PW308 is the largest engine its DOF currently supports, and that technicians at its Battle Creek and Provo MRO locations are line-authorized to support Pratt & Whitney engines.
On June 25, 2026, Duncan dedicated an expanded Turbine Engine Overhaul Shop at its Lincoln headquarters. The company described the facility as a long-term infrastructure investment to meet growing global demand, building on its status as a Pratt & Whitney Designated Overhaul Facility. “This facility represents a significant investment in our future,” Chairman Todd Duncan said. On the avionics side, the company announced in October 2026 that it had purchased Gogo Galileo HDX systems to meet customer demand and installation schedules, a move detailed in AirPro News’ report on its Gogo Galileo HDX order.
Centennial Airport and the Denver Satellite shop
Centennial Airport is owned and operated by the Arapahoe County Public Airport Authority and sits in the southeast metro Denver business district, 12 miles from downtown Denver. The airport describes itself as one of the world’s busiest general aviation airports, reporting 362,407 aircraft operations in 2023, and says approximately 850 aircraft are based there, including 180 jets. More than 125 businesses operate on the field, which is open 24/7/365 with 24/7 U.S. Customs services.
Duncan’s Denver Satellite at APA, at 12850 East Control Tower Road, provides avionics line services and avionics installations from 10,000 sq. ft. of hangar space, according to the company’s location page. Its line services include Reduced Vertical Separation Minimums (RVSM), Emergency Locator Transmitter (ELT) and full avionics inspections, as well as flight data recorder (FDR) downloads, and its technicians travel to all Denver metro airports and within a 200-mile radius.
MRO & Manufacturing
Embraer Signs AHEAD Predictive Maintenance Deal for Mexicana E2 Fleet
Mexicana will use Embraer’s AHEAD predictive maintenance platform on its E2 fleet of five E195-E2 and five E190-E2 jets under a long-term deal.

Embraer and Mexicana (XN), Mexico’s state-owned airline, have signed a long-term contract to put Embraer’s AHEAD predictive maintenance platform on the carrier’s E2 fleet of five Embraer E195-E2 and five E190-E2 aircraft, part of a 20-aircraft E2 order announced in 2024.
Embraer announced the agreement in a press release dated November 12, 2026, from São José dos Campos, Brazil. AHEAD, short for Aircraft Health Analysis and Diagnosis, analyzes data generated by the aircraft to flag likely faults early.
What AHEAD monitors
According to Embraer, AHEAD monitors in real time systems including the auxiliary power unit (APU), fuel, pneumatic, hydraulic, avionics, engines, navigation, air conditioning and flight controls, and it analyzes data both in flight and on the ground. Embraer’s digital solutions page says the platform uses advanced analytics algorithms and artificial intelligence, combining sensor data, aircraft history and environmental factors to generate maintenance predictions.
Embraer says the system reduces unscheduled downtime, lowers maintenance costs and cuts CO₂ emissions by preventing fuel waste caused by technical problems. The announcement gives no figures for those savings, and the value of the contract was not disclosed.
Mexicana CEO Leobardo Ávila Bojórquez framed the contract as the airline’s next step in maintenance planning:
“AHEAD represents the next step; by using the data generated by each aircraft, we can anticipate maintenance needs.”
He said the approach should support Mexicana’s performance as its fleet and network grow. Carlos Naufel, CEO of Embraer Services & Support, called the deal a step in a long-term collaboration while Mexicana expands its E2 operations. “Through our AHEAD platform, we are driving a more predictive, data-driven approach to maintenance,” he said, linking it to higher fleet availability and fewer disruptions.
Mexicana’s E2 fleet and network
The state-owned airline began operations on December 26, 2023, after the Mexican state acquired the “Mexicana” brand. From that date through October 2026, it carried more than 1.33 million passengers. It flies from Felipe Ángeles International Airport (AIFA) to 20 destinations in Mexico and is, the release says, the first and only Mexican airline to operate the E2 family.
The fleet of ten comprises five E190-E2s, which seat 108 passengers each, and five E195-E2s, which seat 132. AirPro News previously covered Mexicana’s plans for its E2 fleet. Embraer describes the 2024 order for 10 E190-E2s and 10 E195-E2s as a strategic investment for the Mexican State Airline.
Part of a run of Embraer services deals
Embraer’s media center lists other support announcements from its services business: the selection of FL Technics as a new Authorized Service Center for E-Jets in Lithuania on October 29, 2026; enhanced support for the Air Dolomiti E-Jets fleet through Embraer’s Pool Program on October 28, 2026; and the nomination of Fokker Services Group as an Embraer Authorized Service Center for the Royal Netherlands Air Force C-390 Millennium fleet on November 3, 2026.
Embraer, founded in 1969 and headquartered in Brazil, says it has delivered more than 9,000 aircraft and describes itself as the largest maker of commercial aircraft with up to 150 seats.
-
Space & Satellites4 days agoNASA Picks Eight Firms for $10 Billion CLPS 2 Moon Delivery Contract
-
Aircraft Orders & Deliveries7 days agoGE Aerospace Signs Record CIIE Deals Including 202 LEAP-1A Engines
-
Regulations & Safety5 days agoFAA Proposes Tighter Falcon 7X Airworthiness Limits for 161 US Jets
-
Space & Satellites6 days agoPrometheus Engine Hot-Fires at P5 With Cold-Spray Combustion Chamber
-
Defense & Military7 days agoAFGSC Starts BSTAR Business Jet Training for B-1B Pilots in Abilene
