MRO & Manufacturing
Liebherr-Aerospace Plans Lindenberg Facility Expansion in 2026
Liebherr-Aerospace will expand its Lindenberg site with new assembly, office space, and hire 270 employees to support Airbus A350 MRO services.

This article is based on an official press release from Liebherr.
Liebherr-Aerospace has announced plans to expand its manufacturing and customer service facilities in Lindenberg, Germany, to accommodate growing demand in the aviation sector. According to an official press release from the company, the expansion project is scheduled to begin in 2026 and will include significant additions to both assembly areas and office spaces.
The strategic investment aims to address the rapid increase in aerospace manufacturing and maintenance requirements. As the aviation industry continues its upward trajectory, Liebherr-Aerospace is positioning its Lindenberg site to handle higher volumes of production and customer service activities, particularly for major commercial-aircraft programs.
In addition to physical infrastructure growth, the company is actively seeking to expand its workforce. The press release noted that Liebherr-Aerospace is looking to fill approximately 270 vacancies, primarily in production, assembly, and customer service roles, to support its enhanced operational footprint.
Facility Upgrades and Environmental Standards
The planned expansion will add approximately 6,000 square meters of space dedicated to customer service and assembly operations. To make room for this extension, the site’s current administration building, identified by the company as the oldest structure on the premises, will be demolished. The project also encompasses the expansion of the employee restaurant to accommodate the growing workforce.
Furthermore, Liebherr-Aerospace is constructing a new office complex spanning roughly 10,000 square meters. This addition is designed to provide the company with the flexibility needed to adapt to future space requirements as the aerospace market evolves.
The new facilities will be built in accordance with modern ecological standards. The company plans to implement sustainability construction measures, including heat recovery systems for heating and green roofs equipped with photovoltaic panels.
“We are working on solutions for more environmentally friendly aviation, and this consequently includes more environmentally friendly production and state-of-the-art ecological construction measures,” stated Martin Wandel, Managing Director and Chief Operating Officer of Liebherr-Aerospace & Transportation SAS, in the press release.
Meeting the Demand for Airbus A350 MRO Services
A significant driver behind the Lindenberg site expansion is the increasing demand for maintenance, repair, and overhaul (MRO) services. As global aircraft fleets age and operational routes expand, regular overhauls are required to maintain safety and performance standards.
Specifically, Liebherr-Aerospace anticipates a ramp-up in MRO activities for the Airbus A350 fleet over the coming years. The company developed and currently manufactures the nose landing gear for the A350, which is the largest landing gear produced at the Lindenberg facility. Due to its size and complexity, servicing this equipment requires substantial physical space.
“There is currently a lot of positive movement in our industry, and we respond for the benefit of our customers. We consider ourselves lucky that we have so much work to do, and we need the space to do it,” explained Gerd Heinzelmann, Managing Director at Liebherr-Aerospace Lindenberg GmbH.
Workforce Expansion and Regional Impact
To support its physical growth and increased operational demands, Liebherr-Aerospace is launching a significant recruitment drive. The company has been a fixture in the aviation industry for over 65 years, and the Lindenberg site serves as the foundational hub for its aerospace and transportation technology segment.
With around 270 open positions, the company is targeting skilled professionals to bolster its production, assembly, and customer service teams. Company leadership emphasized the attractiveness of the region and the opportunity to work on cutting-edge technology for aircraft, helicopters, and advanced air mobility.
“We have been working for the aviation industry for just over 65 years, and we want to continue to strengthen our local footprint, to do this, we need more employees,” noted Philipp Walter, Managing Director at Liebherr-Aerospace Lindenberg GmbH.
AirPro News analysis
The expansion of Liebherr-Aerospace’s Lindenberg facility underscores a broader industry trend of aerospace suppliers scaling up operations to meet post-pandemic recovery demands. As major original equipment manufacturers (OEMs) like Airbus increase production rates, tier-one suppliers must concurrently expand their manufacturing and MRO capabilities to prevent supply chain bottlenecks. The specific focus on the Airbus A350 nose landing gear highlights the long-term lifecycle commitments suppliers make when securing contracts for widebody aircraft programs.
Frequently Asked Questions
When will the Liebherr-Aerospace Lindenberg expansion begin?
According to the company’s press release, the expansion project is set to begin in 2026.
How much space is being added to the facility?
The expansion includes adding around 6,000 square meters for customer service and assembly areas, as well as a new office building covering approximately 10,000 square meters.
How many jobs is Liebherr-Aerospace looking to fill?
The company is currently looking to fill around 270 vacancies, primarily in production, assembly, and customer service roles.
Sources
Photo Credit: Liebherr-Aerospace
MRO & Manufacturing
Textron Aviation Earns CASA Part 145 Approval in Australia
Textron Aviation secures CASA Part 145 certification for three Australian service centers supporting 1,400+ aircraft.

Textron Aviation has secured Part 145 approval from Australia’s Civil Aviation Safety Authority (CASA), authorizing the manufacturer to provide factory-direct maintenance and overhaul services across its three company-owned Australian facilities.
Announced in a press release on August 26, 2026, the certification establishes one of the most comprehensive original equipment manufacturer (OEM) support networks in the country. The approval covers Textron Aviation service centers in Melbourne, Perth, and the Gold Coast, enabling the company to support a regional fleet of more than 1,400 Cessna, Beechcraft, and Hawker aircraft.
Expanding the Asia-Pacific footprint
The CASA Part 145 certification represents the culmination of a multi-year expansion strategy in the Asia-Pacific market. On January 6, 2020, Textron Aviation acquired Australian maintenance, repair, and overhaul (MRO) provider Premiair Aviation Maintenance.
The manufacturer officially rebranded the acquired facilities to Textron Aviation Australia on June 12, 2024, integrating them into a global network that includes more than 300 authorized service facilities and over 40 mobile service units.
Earlier this year, on May 5, 2026, the company opened a purpose-built, 35,000-square-foot service center at Essendon Fields Airport in Melbourne. This new facility more than doubled the company’s previous maintenance capacity in the city, setting the stage for the regulatory approval required to operate as a fully certified OEM maintenance organization.
Factory-direct service capabilities
With the regulatory approval now in place, Textron Aviation can perform a wider range of services directly rather than relying on third-party MRO providers. The CASA Part 145 certificate verifies that the company’s maintenance organization meets Australia’s stringent aviation safety and quality standards.
The authorization permits the facilities to conduct routine maintenance, complex modifications, and full overhauls. It also enhances the company’s ability to dispatch aircraft-on-ground (AOG) support for operators experiencing unscheduled maintenance events across the continent.
AirPro News analysis
We view this regulatory milestone as a critical step in Textron Aviation’s strategy to capture more aftermarket revenue while tightening its relationship with Asia-Pacific operators. By bringing former third-party MRO operations fully under the corporate umbrella and securing the necessary CASA approvals, the manufacturer ensures that Australian owners of Cessna, Beechcraft, and Hawker aircraft remain within the factory service ecosystem. This localized, factory-direct model reduces downtime for operators and provides Textron Aviation with a stable, long-term revenue stream in a geographically isolated but highly active business aviation market.
Sources: Textron Aviation
Photo Credit: Textron Aviation
MRO & Manufacturing
Electra Invests $850M in Ohio Plant for EL9 Aircraft
Electra commits $850M to build an EL9 hybrid-electric aircraft facility in Springfield, Ohio, targeting 400 aircraft per year.

Electra has committed $850 million to build its first scaled manufacturing facility in Springfield, Ohio, where the company will produce its EL9 Ultra Short hybrid-electric aircraft. The investment is projected to generate 1,975 jobs in Clark County and marks the transition of the nine-passenger aircraft from development to commercial production.
Announced on July 21, 2026, at the Farnborough International Airshow, the agreement with JobsOhio and state officials places the new plant at AirPark Ohio, adjacent to the Springfield-Beckley Municipal Airport. The EL9, which traces its origins to a Massachusetts Institute of Technology (MIT) class project, utilizes blown-lift technology to operate from unconventional spaces.
Production capacity and regional impact
The Springfield facility will initially support a production rate of 400 aircraft per year. Electra plans to eventually double this capacity to 800 airframes annually as the program matures and market demand dictates.
Ohio Governor Mike DeWine highlighted the state’s historical ties to aviation and its current focus on advanced air mobility (AAM) manufacturing.
“Ohio is where flight began, and the Dayton-Springfield area has become the national epicenter for advanced air mobility,” DeWine stated in a press release. “Electra’s decision to bring nearly 2,000 new jobs to Springfield will be transformative for Clark County.”
Electra CEO Marc Allen emphasized the importance of the Ohio site selection for the program’s next phase, noting the region’s established aerospace and defense ecosystem.
“This agreement is the moment that our vision moves from demonstration into reality,” Allen said. “In Springfield and Clark County, we found the rare combination this next era requires: a ready site, a skilled workforce, a deep aerospace and defense ecosystem, and state and local leaders with the commitment and vision to build it with us.”
Aircraft capabilities and recent milestones
The EL9 Ultra Short is designed to carry nine passengers and requires a minimum runway length of just 150 feet for takeoff and landing. Electra refers to this operational model as “Direct Aviation,” targeting point-to-point transport using infrastructure such as parking lots, barges, and sports fields rather than traditional airport runways.
The aircraft’s development has accelerated in recent weeks. On July 10, 2026, Electra reached an initial certification milestone with the Federal Aviation Administration (FAA). Five days later, the manufacturer finalized an agreement with Safran to develop and produce the TG600 Turbogenerator, which will power the EL9.
An August 25, 2026, feature published by MIT News detailed the aircraft’s academic roots, noting its evolution from a classroom concept to a fully funded commercial program.
AirPro News analysis
We view Electra’s $850 million manufacturing commitment as a critical indicator of maturity in the hybrid-electric aviation sector. While much of the advanced air mobility industry has focused on electric vertical takeoff and landing (eVTOL) designs, Electra’s blown-lift, fixed-wing approach offers a distinct payload and range profile while still minimizing infrastructure requirements. Securing a dedicated production facility with substantial state backing suggests the company is successfully navigating the transition from prototyping to industrialization, a phase that has historically challenged new aerospace entrants.
Sources: MIT News, Electra Newsroom
Photo Credit: Electra
MRO & Manufacturing
GE Aerospace CNC Apprenticeship Graduates 80 in First Year
GE Aerospace marks one year of its Wilmington, NC CNC machinist apprenticeship, graduating 80+ participants trained to produce jet engine components.

GE Aerospace announced on August 25, 2026, that more than 80 participants have graduated from its Computer Numerical Control (CNC) machinist apprenticeship program in Wilmington, North Carolina, during the initiative’s first year of operation. The milestone highlights the manufacturer’s ongoing efforts to alleviate aerospace supply chain constraints by accelerating the training of skilled labor for critical jet engine component production.
In a press release issued to mark the program’s anniversary, GE Aerospace detailed that the eight-week training pipeline was developed in partnership with Cape Fear Community College (CFCC). The initiative supports the production of precision core engine parts, including blisks, spools, and high-pressure turbine disks, which are currently in high demand across both commercial and military aviation sectors.
Workforce development and training structure
The apprenticeship model condenses the initial skills acquisition phase into an eight-week window. Participants undergo five weeks of intensive instruction at CFCC facilities before moving to the GE Aerospace plant floor for applied training. The curriculum is designed to transition individuals with no prior aviation manufacturing experience into capable CNC machinists. The program is also supported by funding from North Carolina’s NCEdge initiative.
Mark Moon, the GE Aerospace site leader in Wilmington, stated that the program is essential for growing the local workforce required to deliver critical engine parts to customers. The initiative targets candidates from diverse professional backgrounds who are looking to enter the aerospace manufacturing sector.
“I joined the apprenticeship program to pursue a new career path and create a better future for myself and my family. It’s a great way to step into this field where you can thrive and make a career out of it,” said Joseph Knox, a recent graduate of the program.
Broader manufacturing investments
The Wilmington apprenticeship program operates within the context of a $1 billion U.S. manufacturing investment planned by GE Aerospace for 2026. Of that total, the company allocated $160 million to its North Carolina facilities, with $60 million specifically directed to the Wilmington site to expand capacity and upgrade equipment.
The educational partnership builds on prior philanthropic investments in the region. The GE Aerospace Foundation awarded a $100,000 grant to CFCC in 2024 to support machining bootcamps and scholarships. Additionally, the foundation donated $500,000 in 2025 to the Manufacturing Institute’s Heroes MAKE America initiative. CFCC President Jim Morton noted that the collaboration illustrates the function of community colleges in building the talent pipelines necessary to support regional economic and industrial expansion.
AirPro News analysis
We view the rapid scaling of the Wilmington apprenticeship program as a direct response to the persistent skilled labor shortages bottlenecking global engine production and maintenance, repair, and overhaul (MRO) networks. By vertically integrating the training process and partnering directly with local educational institutions, original equipment manufacturers (OEMs) like GE Aerospace can bypass traditional, slower labor acquisition methods. The specific focus on CNC machining for high-pressure turbine disks and blisks targets the exact components that have historically paced engine delivery schedules and constrained aftermarket support.
Sources: GE Aerospace
Photo Credit: GE Aerospace
-
Technology & Innovation6 days agoSkyband Systems M100 LRU Validates GNSS Jamming Protection
-
MRO & Manufacturing5 days agoBoeing SPEEA Engineers Reject Contract, Authorize Strike
-
Military Technology6 days agoSaab Unveils A3-001 Supersonic Stealth Drone Concept
-
Business Aviation5 days agoFTAI Aviation Closes $2B Warehouse Financing for 2026 SPV
-
Business Aviation6 days agoSyberJet SJ30-2 Sets Transcontinental Speed Record
