Defense & Military
GA-ASI and USAF Demonstrate Passive Targeting in CCA Program
GA-ASI and USAF completed a joint flight exercise using MQ-20 Avenger to demonstrate passive IR sensing for the Collaborative Combat Aircraft program.

This article is based on an official press release from General Atomics Aeronautical Systems, Inc. (GA-ASI), supplemented by industry research.
We report on the latest developments in the U.S. Air Force’s Collaborative Combat Aircraft (CCA) program. According to an official press release from General Atomics Aeronautical Systems, Inc. (GA-ASI), the company successfully completed a joint autonomy flight exercise with the USAF on February 24, 2026. The milestone, publicly announced on March 17, 2026, utilized an MQ-20 Avenger® uncrewed jet acting as a surrogate testbed for the CCA initiative.
The core achievement of this demonstration was the aircraft’s ability to execute passive target localization. By relying on Infrared (IR) sensing and Single Ship Ranging (SSR) rather than traditional active radar, the uncrewed jet estimated target ranges and tracked airborne threats without emitting detectable electromagnetic signals.
As we track the evolution of uncrewed military aviation, this capability represents a significant leap forward. It enables what defense experts call “stealthy sensor-to-shooter kill chains,” allowing autonomous wingmen to operate effectively in highly contested, radar-denied environments alongside crewed fighters.
The Silent Wingman: Mastering Passive Targeting
In modern air combat, emitting an active radar signal is often compared to turning on a flashlight in a dark room, it illuminates the target but immediately reveals the user’s position to adversaries. According to the GA-ASI press release, the February 24 exercise demonstrated a viable, stealthy alternative.
Integrating TacACE and SSR
The MQ-20 Avenger utilized a combination of the government-provided Autonomy Start Kit (ASK) and GA-ASI’s proprietary Tactical Autonomy Ecosystem (TacACE®). The integration of Infrared Search and Track (IRST) sensors alongside SSR techniques allowed the aircraft to track targets using heat signatures. The engagement sequences were managed via a TacPad Pilot Vehicle Interface (PVI), while a Proliferated Low-Earth Orbit (pLEO) data link ensured seamless communication and coordination of autonomy behaviors during the large force exercise.
“Integrated within the TacACE’s modular skills library, SSR supports autonomous mission execution, cooperative targeting, and distributed kill chains, advancing the role of autonomous aircraft in future air combat and CCA operations,” stated Mike Atwood, Vice President of Advanced Programs for GA-ASI, in the company’s release.
The Broader Collaborative Combat Aircraft (CCA) Race
The CCA program is a multi-pronged initiative by the U.S. Air Force designed to field a new generation of highly autonomous, lower-cost uncrewed jets. Industry research notes that these aircraft are intended to fly alongside crewed fifth- and sixth-generation fighters, such as the F-35 and F-22, providing “affordable mass” to multiply combat power while reducing risks to human pilots.
Timeline and Production
GA-ASI is currently one of two primary vendors, alongside Anduril Industries, competing for the Increment 1 production contract of the CCA program. The Air Force is expected to select a final winner for both the physical aircraft design and the mission autonomy software by the end of 2026.
“We’ll be making that decision [on the Increment 1 winner] by the end of the year… That will happen this year and then we’ll get moving pretty darn quickly on production,” noted Col. Timothy Helfrich, USAF Portfolio Acquisition Executive for Fighters and Advanced Aircraft, speaking at the AFA Warfare Symposium in February 2026.
Recent Milestones for the “Dark Merlin”
While the MQ-20 Avenger has served as a reliable surrogate testbed for over five years, GA-ASI’s official, purpose-built CCA prototype is the YFQ-42A. According to recent industry reports, the company officially nicknamed the aircraft the “Dark Merlin” in February 2026, following its maiden flight in August 2025. The aircraft is designed specifically for rapid, low-cost production.
Open Architecture and Marine Corps Expansion
The pace of development has accelerated rapidly in early 2026. On February 12, 2026, the USAF and GA-ASI successfully flew the YFQ-42A using third-party mission autonomy software, specifically, Collins Aerospace’s “Sidekick.” This flight proved the viability of the military’s Autonomy Government Reference Architecture (A-GRA), demonstrating that the Air Force can successfully decouple physical aircraft hardware from the Software brains that pilot it.
Furthermore, the CCA concept is expanding beyond the Air Force. On February 10, 2026, the U.S. Marine Corps selected GA-ASI for its MUX TACAIR program. The Marines are using the YFQ-42A as a surrogate to evaluate how uncrewed collaborative aircraft can support expeditionary Marine Air-Ground Task Force operations.
AirPro News analysis
We view the shift toward passive IR sensing as a defining characteristic of the next generation of air combat. The ability of uncrewed systems to operate as “silent wingmen” fundamentally changes the tactical geometry of an engagement. By relying on heat signatures and single-ship ranging rather than active Radar-Systems, these platforms can survive longer in contested airspace, acting as forward sensor nodes that feed targeting data back to crewed fighters without exposing the broader formation. Additionally, the successful integration of third-party software via open architecture suggests that the Department of Defense is successfully breaking vendor lock, paving the way for rapid, iterative software updates akin to the commercial tech sector.
Frequently Asked Questions (FAQ)
What is the Collaborative Combat Aircraft (CCA) program?
The CCA program is a U.S. Air Force initiative to develop highly autonomous, lower-cost uncrewed jets that will fly alongside crewed fighter jets to increase combat mass and reduce risk to human pilots.
What is passive target localization?
Passive target localization involves tracking and targeting adversaries without emitting detectable signals, such as active radar. In this demonstration, GA-ASI used Infrared (IR) sensing to track the heat signatures of targets.
When will the USAF choose a winner for the CCA program?
According to USAF officials, a decision for the Increment 1 production contract is expected by the end of 2026.
Sources
- General Atomics Aeronautical Systems, Inc. (GA-ASI) Press Release
- Provided Industry Research Report on the CCA Program
Photo Credit: GA-ASI
Defense & Military
NSPA Issues RFP for NATO Next Generation Rotorcraft Program
NSPA formally launches the NGRC Concept Design RFP, with four manufacturers competing for a six-nation helicopter replacement program.

The NATO Support and Procurement Agency (NSPA) has formally issued a Request for Proposal for the Concept Design phase of the Next Generation Rotorcraft Capability program, advancing a six-nation effort to replace aging medium multi-role Helicopters fleets.
Announced in a press release on August 10, 2026, the procurement targets a service entry between 2035 and 2040. The NSPA is managing the process on behalf of Canada, France, Germany, Italy, the Netherlands, and the United Kingdom. Four pre-qualified Manufacturers will compete in this phase: Airbus Helicopters, Leonardo Helicopters, The Boeing Company, and Sikorsky.
Advancing the concept design phase
The Request for Proposal (RFP) officially opened on July 31, 2026, and requires the four bidders to submit their concept design proposals by August 31, 2027, at 12:00 Paris Time. Under the procurement guidelines, each manufacturer can propose a maximum of two concept design solutions.
Maxime Martinez, Principal Procurement Officer for the Next Generation Rotorcraft Capability (NGRC) Programme at NSPA, confirmed the launch of the new phase.
I am pleased to announce that the NATO Support and Procurement Agency (NSPA) has launched the next phase of the Next Generation Rotorcraft Capability (NGRC) Programme: a formal Request for Proposals (RFP) to qualified bidders linked to the competition for the Concept Design phase of NGRC.
The NSPA is utilizing a procurement mechanism called Acquisition by Qualified Options. This framework allows the participating nations to evaluate digital trials within an in-house modeling and simulation environment before committing to physical prototypes. The agency plans to complete the bid evaluation process by the end of 2027, at which point it will deliver an evaluation summary report to the participating nations.
Industry positioning and proposals
The four pre-qualified bidders, selected following a Pre-Qualification Assessment that closed in October 2025, have already begun positioning their offerings for the multi-national replacement program.
In February 2026, Airbus Helicopters revealed two distinct concepts for the NGRC study. The European manufacturer is developing both a high-performance conventional helicopter and a high-speed compound rotorcraft that leverages technology from its Racer demonstrator program. Sikorsky, a Lockheed Martin company, announced in July 2026 that it would establish helicopter production facilities in Europe if the partner nations select its proposal.
The NSPA is encouraging broader industry participation through the primary bidders rather than direct submissions. Martinez stated that potential suppliers, technology providers, and industrial partners should engage directly with Airbus Helicopters, The Boeing Company, Leonardo Helicopters, or Sikorsky to contribute to the program.
AirPro News analysis
We view the NSPA decision to utilize the Acquisition by Qualified Options mechanism as a critical step in mitigating the technical and financial risks historically associated with clean-sheet rotorcraft development. By mandating digital trials in a simulated environment before advancing to physical prototypes, the participating nations can rigorously evaluate the aerodynamic and operational viability of complex designs, such as the compound concept proposed by Airbus Helicopters.
Sikorsky’s preemptive commitment to European production highlights the intense political and economic stakes of the NGRC program. With five European nations and Canada funding the development, North American bidders like Sikorsky and The Boeing Company will likely need to guarantee substantial industrial offsets and local manufacturing to remain competitive against indigenous European prime contractors like Airbus and Leonardo. The requirement for up to two concepts per bidder also provides the NSPA with a broad spectrum of conventional and advanced high-speed rotorcraft options to evaluate against the harmonized operational baseline.
Photo Credit: Airbus
Defense & Military
HAL and Safran Sign Aravalli Engine Co-Development Contract
HAL and Safran finalize the Aravalli engine contract via SAFHAL JV to power India’s IMRH and DBMRH helicopters by 2032-2033.

Hindustan Aeronautics Limited (HAL) and Safran Helicopter Engines have finalized a contract to co-develop the new-generation Aravalli engine, marking a definitive shift in Indian aerospace manufacturing from licensed production to indigenous propulsion design.
The agreement, signed on August 26, 2026, in Bengaluru, India, formalizes the design, development, manufacture, and lifecycle support of the engine through SAFHAL Helicopter Engines Pvt. Ltd. SAFHAL is a 50:50 joint venture between the two aerospace manufacturers. The Aravalli engine is slated to power India’s future 13-ton Indian Multi-Role Helicopter (IMRH) and its naval variant, the Deck-Based Multi-Role Helicopter (DBMRH).
Technical specifications and manufacturing
The Aravalli engine will operate in the 3,500 to 4,000 shaft horsepower (shp) class. Under the terms of the agreement, HAL will gain access to core engine technologies, including the high-pressure compressor, power turbine, and accessory gearbox. This technology transfer is designed to build domestic intellectual property and expertise in high-power engine design.
Manufacturing operations for the Aravalli program will be based at HAL’s facility in Tumakuru, Karnataka. Safran Helicopter Engines Chief Executive Officer Cédric Goubet noted the precedent set by the agreement in a press release issued by HAL.
“This is the first time Safran HE has taken up such a class of engine as co-development. The Aravalli engine programme represents a new chapter in the strategic relationship between France and India, combining the expertise of our teams to develop propulsion systems for future Indian rotorcraft.”
Development timeline and strategic shift
The final contract follows a multi-year negotiation and planning phase. HAL and Safran initially signed a Memorandum of Understanding for the project in July 2022, followed by detailed workshare discussions at Aero India in February 2023. The companies executed an airframer contract on August 30, 2024, to commence joint design work.
The design and development phase is targeted for completion between 2032 and 2033. Once operational, the IMRH platform is intended to replace the Indian Air Force’s aging fleet of Mil Mi-17 Helicopters. HAL Chairman and Managing Director Ravi K emphasized the domestic industrial impact of the program.
“The signing of this contract marks a significant step forward in India’s pursuit of self-reliance in aero-engine technologies. Through this collaborative programme with SAFHAL and Safran Helicopter Engines, we are creating a strong foundation for powering next-generation Indian helicopter platforms.”
AirPro News analysis
The Aravalli engine contract represents a critical maturation point for India’s defense aviation sector. Historically, Indian aerospace manufacturing has relied heavily on licensed production of foreign designs, which limits domestic engineering capability and intellectual property ownership. By securing a 50:50 co-development structure that includes core engine components like the high-pressure compressor and power turbine, we view this agreement as a foundational step toward true Propulsion independence for the Indian military. If the 2032 to 2033 development timeline holds, HAL will be positioned not just as an assembler, but as a primary original equipment Manufacturers (OEMs) for high-power rotorcraft engines.
Sources: Hindustan Aeronautics Limited
Photo Credit: Hindustan Aeronautics Limited
Defense & Military
Raytheon Wins $603M Contract for B-52H Radar Modernization
Raytheon secures $603M USAF contract to produce the AN/APQ-188 AESA radar for the B-52H fleet under the B-52 Radar Modernization Program.

This is a developing story. Information may change as official details are released.
Raytheon has secured a $603,000,000 sole-source contract from the U.S. Air Force (USAF) to produce and sustain the new AN/APQ-188 radar for the Boeing B-52H Stratofortress fleet, advancing a critical modernization effort despite the recent loss of the program’s primary test aircraft.
The U.S. Department of Defense announced the indefinite-delivery/indefinite-quantity (IDIQ) contract on August 25, 2026, following the official award on August 21, 2026. The agreement establishes the ceiling value for the production phase of the B-52 Radar Modernization Program (RMP). The Air Force Life Cycle Management Center (AFLCMC) at Wright-Patterson Air Force Base (FFO) in Ohio is the contracting activity, obligating $46,008,396 in fiscal 2026 aircraft procurement funds with the initial delivery order.
Upgrading the B-52 radar capabilities
The RMP replaces the bomber’s 1960s-era mechanically scanned AN/APQ-166 radar with the Raytheon AN/APQ-188, an Active Electronically Scanned Array (AESA) system. The new Radar-Systems is a derivative of the AN/APG-79 used on the F/A-18 and forms a cornerstone of the broader B-52J upgrade package designed to keep the fleet operational into the 2050s.
According to the Department of Defense, Raytheon will perform the contract work across multiple facilities, including Forrest, Mississippi; El Segundo, California; McKinney, Texas; and Warner Robins, Georgia. The contract is expected to be completed by August 20, 2031.
Program continuity following testbed loss
The production contract award follows a major setback for the RMP during the flight testing phase. On June 15, 2026, the sole B-52 radar testbed aircraft crashed shortly after takeoff at Edwards Air Force Base (EDW) in California. The USAF confirmed the accident resulted in the deaths of all eight crew members on board, which included military personnel, government civilians, and contractors. The official cause of the accident remains under Investigation by the USAF.
Despite the loss of the initial testbed, military officials have confirmed the modernization program will proceed. According to reporting by DefenseScoop, Col. Spencer Turner, the B-52 System Program Manager, stated that the original acquisition strategy always included two test aircraft.
Turner confirmed that work on the second aircraft is actively underway at The Boeing Company facility in San Antonio, Texas. He noted that the service expects to “complete the full modification and put the full radar suite onto the aircraft this year and proceed with testing.” Following the June 15, 2026 accident, the active USAF fleet stands at 75 B-52H bombers.
AirPro News analysis
The decision to award a $603,000,000 production contract just two months after the loss of the primary testbed underscores the firm commitment of the USAF to the B-52J upgrade timeline. Because the AN/APQ-188 is heavily derived from an existing, mature AESA system, the service likely views the radar technology itself as low-risk, separating the radar’s production readiness from the ongoing investigation into the June 15 accident. We note that delaying the production contract until a second testbed completes flight trials would have likely pushed the B-52J initial operational capability timeline to the right, a delay the USAF appears unwilling to accept as it plans to operate the airframe for another three decades.
Sources: U.S. Department of Defense
Photo Credit: US Air Force
-
UAV & Drones7 days agoDufour Aerospace Aero-200 eVTOL Targets 2027 Serial Production
-
Technology & Innovation5 days agoSkyband Systems M100 LRU Validates GNSS Jamming Protection
-
MRO & Manufacturing4 days agoBoeing SPEEA Engineers Reject Contract, Authorize Strike
-
Military Technology4 days agoSaab Unveils A3-001 Supersonic Stealth Drone Concept
-
Business Aviation4 days agoFTAI Aviation Closes $2B Warehouse Financing for 2026 SPV
