Defense & Military
Spain selects Airbus and Indra for new SIGINT aircraft study
Spain’s Ministry of Defence appoints Airbus and Indra to define a new fleet of strategic SIGINT aircraft, enhancing national electronic intelligence capabilities.

This article is based on an official press release from Airbus.
The Spanish Ministry of Defence has officially selected Airbus Defence and Space and Indra to lead the definition phase for a new fleet of Signals Intelligence (SIGINT) aircraft. Announced on December 30, 2025, this strategic agreement tasks the two industrial heavyweights, with designing a “national solution” to restore and enhance Spain’s electronic intelligence capabilities.
According to the official press release, the contract covers an 18-month conceptual definition study. The primary objective is to define a solution for three aircraft that will eventually replace Spain’s retired strategic intelligence assets. This initiative is part of a broader push for European “Strategic Autonomy,” ensuring that critical defense technologies remain under national and continental control.
The collaboration divides responsibilities clearly: Airbus will focus on the aircraft platform and integration, while Indra will lead the development of the advanced mission systems and sensors. This partnership aims to secure high-tech industrial workload for Spanish facilities, specifically in Getafe and Madrid, while providing the Spanish Air and Space Force with a sovereign capability to detect and classify electronic threats.
Defining a Sovereign SIGINT Solution
The core of this agreement is the development of a sovereign Signals Intelligence capability. Since the retirement of the Boeing 707 “Santiago” fleet, Spain has lacked a dedicated strategic platform for long-range electronic warfare and intelligence gathering. The new program aims to fill this gap with a modern, integrated solution.
Roles and Industrial Workshare
Under the terms of the agreement, the workshare leverages the specific strengths of both companies:
- Airbus Defence and Space: As the platform leader, Airbus is responsible for selecting the most suitable aircraft to meet the operational requirements of the Spanish Armed Forces. The company will also handle the integration of systems and the eventual industrialization of the solution at its Getafe facilities.
- Indra: As the mission systems leader, Indra will define the SIGINT payload. This includes the complex suite of sensors required for Electronic Intelligence (ELINT) and Communications Intelligence (COMINT).
“The study will analyze and define the most suitable platform and signals intelligence equipment to provide a national solution… to detect, track, classify, and identify targets of interest to the Spanish Armed Forces.”
— Airbus Press Release
Advanced Sensor Technology
Indra’s role is critical in ensuring the aircraft can operate in modern contested environments. The mission system must be capable of processing vast amounts of data to identify radar and communication emissions. Industry observers note that Indra is likely to leverage technology from its “Pegaso” family of electronic defense systems, ensuring the new fleet remains interoperable with other NATO and European assets.
Strategic Context and Modernization
This announcement arrives amidst a significant modernization drive for the Spanish Air and Space Force. By mandating a “national solution,” the Ministry of Defence is prioritizing industrial sovereignty, reducing reliance on non-European suppliers for sensitive intelligence data collection.
Broader Fleet Updates
The SIGINT study is one component of a larger overhaul of Spanish military aviation confirmed in late 2025. Alongside the intelligence aircraft, Spain is moving forward with the acquisition of Turkish Aerospace Hürjet trainers to replace aging F-5s and expanding its transport capabilities with additional Airbus C295 aircraft. This coordinated effort ensures that the Spanish aerospace industry remains deeply involved in the lifecycle of its defense assets.
AirPro News Analysis
While the press release does not specify which aircraft airframe will be selected, the requirement for a strategic platform capable of housing complex consoles and offering long endurance narrows the field.
We believe the Airbus A320neo family is a strong contender. Airbus has previously explored “Modular Multi-Mission Aircraft” (M3A) concepts based on the A320, which would offer the cabin volume necessary for extensive SIGINT workstations and crew rest areas during long missions. Furthermore, utilizing an Airbus airframe would maximize the industrial return for the Getafe facility.
Alternatively, a high-end business jet (such as a Dassault Falcon 10X or similar) could offer lower operating costs and higher altitude performance. However, given the emphasis on a “national solution” and Airbus’s leadership in the platform definition, a commercial derivative based on an Airbus jetliner appears to be the most politically and industrially consistent choice.
Regardless of the airframe selected, this 18-month study marks a critical step in restoring Spain’s independent strategic eyes and ears in the electromagnetic spectrum.
Sources
Photo Credit: Airbus
Defense & Military
Boeing Wins $552M Navy Contract for MQ-25A Stingray Production
The U.S. Navy awarded Boeing up to $552M to begin low-rate initial production of the MQ-25A Stingray unmanned tanker.

The Boeing Company has secured a contract modification valued at up to $552,053,000 from the U.S. Navy to begin low-rate initial production of the MQ-25A Stingray. The award transitions the world’s first fully integrated, carrier-based unmanned aerial vehicle from its development phase into active production.
Announced by the U.S. Department of Defense on September 14, 2026, the undefinitized, fixed-price-incentive modification covers the delivery of three Lot One aircraft and funds advance acquisition of long-lead components for three Lot Two airframes. The MQ-25A is designed to provide organic aerial refueling capabilities to Carrier Air Wings, a role that will free up manned F/A-18E/F Super Hornets for strike missions and extend their operational service life.
Production scope and timeline
The modification to a previously awarded firm-fixed-price advance acquisition contract obligates $164,428,480 at the time of award. This includes $100,000,000 in fiscal 2025 aircraft procurement funds and $64,428,480 in fiscal 2026 funds. Naval Air Systems Command (NAVAIR) is the contracting activity.
Work will be distributed across multiple North-American facilities. The majority of the Manufacturing will take place in St. Louis, Missouri, which accounts for 56 percent of the contract scope. Other significant locations include Torrance, California; Indianapolis, Indiana; and Quebec, Canada. The Department of Defense expects the work under this specific modification to conclude in July 2031.
Program milestones and development hurdles
The contract award follows a series of recent program milestones. On April 25, 2026, the Navy completed the first successful test flight of a production-representative MQ-25A. Less than a month later, Acting Secretary of the Navy Hung Cao granted Milestone C approval, officially authorizing the program to enter the Production and Deployment phase.
Capt. Daniel Fucito, the Unmanned Carrier Aviation Program Manager, highlighted the significance of the award in a Navy statement.
“Awarding this first LRIP contract marks a pivotal transition from development to operational reality and is a testament to the focused effort of our joint government and industry teams.”
The transition to production comes after the program navigated several development delays. According to the Pentagon’s April 2026 Modernized Selected Acquisition Report, technical risks and a labor strike at Boeing contributed to pushing the expected initial operational capability (IOC) to 2029. This represents a four-year delay from the program’s original timeline. Initial deliveries from the Lot One contract are also expected to begin in 2029.
The total program of record calls for 76 air vehicles. Seven test aircraft are currently in production at Boeing facilities in St. Louis and a dedicated MQ-25 site in Mascoutah, Illinois. Official sources show a slight discrepancy in the exact valuation of the new contract, with the Department of Defense listing a not-to-exceed value of $552,053,000 and a concurrent Navy release valuing the Lot One award at $562,000,000.
AirPro News analysis
Moving the MQ-25A into low-rate initial production is a critical milestone for both the U.S. Navy and Boeing. For the Navy, fielding an unmanned tanker capable of delivering 14,000 pounds of fuel over 500 nautical miles fundamentally alters carrier strike group geometry. It relieves the F/A-18E/F fleet from the heavy burden of buddy-tanking, preserving flight hours on tactical fighters for their primary combat roles.
For Boeing, locking in the LRIP contract provides stability to a defense program that has faced intense scrutiny over schedule slips. While the 2029 IOC target reflects the reality of recent supply chain and labor challenges, transitioning from test articles to production airframes indicates that the core technical risks are now manageable. We expect the focus will now shift heavily toward production scaling and the integration of the Stingray into the carrier air wing’s daily operational rhythm.
Sources: U.S. Department of Defense
Photo Credit: Boeing
Defense & Military
Lockheed Martin Vectis CCA Expands to Five Prototypes
Lockheed Martin Skunk Works expands Vectis to five prototypes, targeting first flight by end of 2027 and a $20M unit cost.

Lockheed Martin Skunk Works has expanded production of its internally funded Vectis uncrewed aircraft program to five prototypes, unveiling a full-scale model of the autonomous wingman on September 14, 2026, at the Air, Space & Cyber Conference in National Harbor, Maryland.
The expansion, announced via a company press release, signals Lockheed Martin’s continued investment in the Collaborative Combat Aircraft (CCA) space. The Vectis is designed to operate alongside crewed fighters such as the Lockheed Martin F-35 Lightning II and F-22 Raptor, utilizing the manufacturers‘s MDCX autonomy command and control platform.
Design and technical specifications
The Vectis is classified as a Group 5 uncrewed aircraft, weighing more than 1,320 pounds. It features a tailless, lambda-wing design measuring 34 feet in length with a 38-foot wingspan. The airframe incorporates a submerged dorsal engine inlet, a design choice intended to reduce frontal drag and minimize the risk of foreign object debris (FOD) ingestion.
This inlet configuration aligns with the U.S. Air Force (USAF) Agile Combat Employment (ACE) concept, which emphasizes operating from austere or debris-prone locations. The aircraft is powered by a Williams International FJ44-4 turbofan engine, which delivers 3,600 pounds of thrust. For combat operations, the Vectis includes an internal weapons bay capable of carrying munitions such as the AIM-120 advanced medium-range air-to-air missile.
Rapid development and production timeline
Lockheed Martin first unveiled the Vectis concept on September 21, 2025, and confirmed the selection of the Williams International engine on December 18, 2025. The program has utilized digital engineering to accelerate its timeline. According to the manufacturer, the project moved from the first drawing to a wind tunnel fly-off in less than two months. The first digital build was completed in six months, and the first physical part was released at the eight-month mark.
Ron Fehlen, Vice President and General Manager of Lockheed Martin Skunk Works, confirmed that development work on the four additional aircraft is already underway. The company is targeting the end of 2027 for the first flight of the Vectis prototype.
“The team is extremely excited as these parts start to come together, to actually get the wheels off the ramp by the end of 2027,” Fehlen stated.
Market positioning and cost targets
While Lockheed Martin was not selected for the first increment of the USAF CCA program, the company is positioning the Vectis for future increments and potential contracts with the U.S. Navy (USN) and U.S. Marine Corps (USMC). The USAF has publicly targeted a cost of approximately $20 million per CCA unit. Lockheed Martin has stated that the Vectis is targeting a competitive price point within this range, though exact unit costs remain undisclosed.
Fehlen noted that the aircraft is designed to be survivable, affordable, and flexible across a range of missions required by military customers.
AirPro News analysis
We view Lockheed Martin’s decision to self-fund four additional prototypes as a strategic commitment to remaining competitive in the autonomous combat aircraft market. By targeting the $20 million unit cost and emphasizing austere operational capabilities through the dorsal inlet design, the manufacturer is positioning Vectis as a mature, ready-to-produce option for future CCA increments. The rapid development timeline also demonstrates the efficacy of Skunk Works’ digital engineering processes, which will be critical for meeting the high-volume production demands anticipated for uncrewed wingman programs.
Sources: Lockheed Martin
Photo Credit: Lockheed Martin
Defense & Military
South Korea Approves $2.4B MH-60R Seahawk Acquisition
DAPA approved a $2.4B project to acquire ~20 MH-60R Seahawks for the Republic of Korea Navy, replacing its Westland Lynx fleet.

This article summarizes reporting by Asiae.
South Korea’s Defense Acquisition Program Administration (DAPA) approved a 3.24 trillion won ($2.4 billion) project on September 15, 2026, to acquire approximately 20 additional Lockheed Martin MH-60R Seahawk helicopters for the Republic of Korea Navy (ROKN). The acquisition, scheduled to run from 2025 through 2032, will replace the navy’s aging fleet of shipborne Westland Lynx helicopters and expand its anti-submarine warfare capabilities.
The approval of the Maritime Operational Helicopter-II project follows a May 18, 2026, clearance by the U.S. State Department for a potential $3 billion Foreign Military Sale of up to 24 MH-60R airframes to South Korea. According to reporting by Asiae, the final number of helicopters will be solidified during concluding contract negotiations, though DAPA currently projects a fleet addition of around 20 aircraft.
Expanding the Republic of Korea Navy fleet
The ROKN is already in the process of integrating the Lockheed Martin MH-60R Seahawk into its frontline operations. South Korea signed an initial $878 million contracts in December 2020 for 12 of the maritime helicopters. The first airframe from that order was delivered in December 2024.
Operational deployment of the initial batch began recently, with the first two Seahawks entering active service on April 1, 2026, at the 62nd Maritime Aviation Squadron based in Jinhae. The newly approved second batch will significantly increase the ROKN’s operational footprint and surface fleet integration.
Brigadier General Kang Seong-kwon, head of the Aircraft Business Division at DAPA, highlighted the platform’s multi-role utility during the procurement process.
“The new MH-60R maritime operational helicopter is capable of performing various missions, including anti-submarine, anti-ship, and search and rescue operations,” Kang stated.
Technical specifications and parallel defense projects
The Lockheed Martin MH-60R Seahawk is designed for a maximum takeoff weight of 10.2 tons and can reach a maximum speed of 180 knots. The platform is equipped with advanced sensor suites and weapon systems tailored for detecting and neutralizing underwater and surface threats, a critical requirement for South Korea’s maritime defense strategy.
During the same September 15, 2026, Defense Project Promotion Committee meeting, DAPA authorized a separate 2.16 trillion won initiative. This parallel project aims to indigenously develop vertical takeoff and landing (VTOL) reconnaissance unmanned aerial vehicles (UAVs) by 2036, further modernizing the country’s aerial surveillance capabilities.
AirPro News analysis
We view DAPA’s rapid follow-on order for the Lockheed Martin MH-60R Seahawk as a strong indicator of the ROKN’s satisfaction with the initial 2020 batch. Transitioning from the legacy Westland Lynx to a unified fleet of MH-60Rs streamlines maintenance, training, and interoperability with United States Navy assets operating in the Indo-Pacific region. The slight discrepancy between the U.S. State Department’s approval for 24 airframes and DAPA’s stated goal of “approximately 20” is standard in Foreign Military Sales, where the maximum approved quantity often provides a buffer for final budget negotiations and equipment configurations.
Sources: Asiae
Photo Credit: Lockheed Martin
-
Technology & Innovation3 days agoFAA Launches Texas eVTOL Flights Under Project Nexus eIPP
-
MRO & Manufacturing7 days agoGE Aerospace Acquires CPP for $11.75 Billion
-
Defense & Military6 days agoSikorsky VH-92A Patriot Completes Marine One Fleet Replacement
-
Space & Satellites4 days agoBoeing Delivers Final O3b mPOWER Satellites to SES
-
Space & Satellites3 days agoFirefly Aerospace Signs Two Alpha Launches from Esrange Sweden
