Defense & Military
Spain selects Airbus and Indra for new SIGINT aircraft study
Spain’s Ministry of Defence appoints Airbus and Indra to define a new fleet of strategic SIGINT aircraft, enhancing national electronic intelligence capabilities.

This article is based on an official press release from Airbus.
The Spanish Ministry of Defence has officially selected Airbus Defence and Space and Indra to lead the definition phase for a new fleet of Signals Intelligence (SIGINT) aircraft. Announced on December 30, 2025, this strategic agreement tasks the two industrial heavyweights, with designing a “national solution” to restore and enhance Spain’s electronic intelligence capabilities.
According to the official press release, the contract covers an 18-month conceptual definition study. The primary objective is to define a solution for three aircraft that will eventually replace Spain’s retired strategic intelligence assets. This initiative is part of a broader push for European “Strategic Autonomy,” ensuring that critical defense technologies remain under national and continental control.
The collaboration divides responsibilities clearly: Airbus will focus on the aircraft platform and integration, while Indra will lead the development of the advanced mission systems and sensors. This partnership aims to secure high-tech industrial workload for Spanish facilities, specifically in Getafe and Madrid, while providing the Spanish Air and Space Force with a sovereign capability to detect and classify electronic threats.
Defining a Sovereign SIGINT Solution
The core of this agreement is the development of a sovereign Signals Intelligence capability. Since the retirement of the Boeing 707 “Santiago” fleet, Spain has lacked a dedicated strategic platform for long-range electronic warfare and intelligence gathering. The new program aims to fill this gap with a modern, integrated solution.
Roles and Industrial Workshare
Under the terms of the agreement, the workshare leverages the specific strengths of both companies:
- Airbus Defence and Space: As the platform leader, Airbus is responsible for selecting the most suitable aircraft to meet the operational requirements of the Spanish Armed Forces. The company will also handle the integration of systems and the eventual industrialization of the solution at its Getafe facilities.
- Indra: As the mission systems leader, Indra will define the SIGINT payload. This includes the complex suite of sensors required for Electronic Intelligence (ELINT) and Communications Intelligence (COMINT).
“The study will analyze and define the most suitable platform and signals intelligence equipment to provide a national solution… to detect, track, classify, and identify targets of interest to the Spanish Armed Forces.”
— Airbus Press Release
Advanced Sensor Technology
Indra’s role is critical in ensuring the aircraft can operate in modern contested environments. The mission system must be capable of processing vast amounts of data to identify radar and communication emissions. Industry observers note that Indra is likely to leverage technology from its “Pegaso” family of electronic defense systems, ensuring the new fleet remains interoperable with other NATO and European assets.
Strategic Context and Modernization
This announcement arrives amidst a significant modernization drive for the Spanish Air and Space Force. By mandating a “national solution,” the Ministry of Defence is prioritizing industrial sovereignty, reducing reliance on non-European suppliers for sensitive intelligence data collection.
Broader Fleet Updates
The SIGINT study is one component of a larger overhaul of Spanish military aviation confirmed in late 2025. Alongside the intelligence aircraft, Spain is moving forward with the acquisition of Turkish Aerospace Hürjet trainers to replace aging F-5s and expanding its transport capabilities with additional Airbus C295 aircraft. This coordinated effort ensures that the Spanish aerospace industry remains deeply involved in the lifecycle of its defense assets.
AirPro News Analysis
While the press release does not specify which aircraft airframe will be selected, the requirement for a strategic platform capable of housing complex consoles and offering long endurance narrows the field.
We believe the Airbus A320neo family is a strong contender. Airbus has previously explored “Modular Multi-Mission Aircraft” (M3A) concepts based on the A320, which would offer the cabin volume necessary for extensive SIGINT workstations and crew rest areas during long missions. Furthermore, utilizing an Airbus airframe would maximize the industrial return for the Getafe facility.
Alternatively, a high-end business jet (such as a Dassault Falcon 10X or similar) could offer lower operating costs and higher altitude performance. However, given the emphasis on a “national solution” and Airbus’s leadership in the platform definition, a commercial derivative based on an Airbus jetliner appears to be the most politically and industrially consistent choice.
Regardless of the airframe selected, this 18-month study marks a critical step in restoring Spain’s independent strategic eyes and ears in the electromagnetic spectrum.
Sources
Defense Contracts
Leonardo DRS Wins NAVAIR Production Contract for DAIRCM System
NAVAIR awarded Leonardo DRS a three-year IDIQ contract for low-rate initial production of the AN/AAQ-45 DAIRCM survivability system.

Naval Air Systems Command (NAVAIR) has awarded Leonardo DRS a three-year indefinite-delivery/indefinite-quantity (IDIQ) contract for low-rate initial production (LRIP) of the AN/AAQ-45 Distributed Aperture Infrared Countermeasure (DAIRCM) aircraft survivability system. The award takes DAIRCM out of the Engineering and Manufacturing Development (EMD) phase that NAVAIR funded in 2020 and into production.
Leonardo DRS announced the contract in a press release dated November 10, 2026. The release does not state the contract’s value, the number of systems to be produced or the aircraft types that will receive them.
What the production contract covers
Under the contract, Leonardo DRS will provide hardware production, aircraft integration, systems engineering, program management and associated logistics support. According to the company, DAIRCM hardware will be manufactured at its facilities in Dallas, Texas, and San Diego, California, while aircraft integration and logistics work will be carried out at its Fort Walton Beach, Florida, site.
Leonardo DRS describes DAIRCM as a combat-proven, lightweight survivability suite for small- and medium-sized aircraft with demanding size, weight and integration requirements. The modular system combines missile warning, directed infrared countermeasures, laser warning and hostile-fire indication to help protect aircraft and crews from surface-to-air threats.
The company said the LRIP award follows the program’s EMD phase, during which it incorporated capability and producibility enhancements into the system configuration. To date, the release states, DAIRCM has been deployed on aircraft operating under a Joint Urgent Operational Need Statement.
John Baylouny, president and chief executive officer of Leonardo DRS, said in the release:
“This award moves the DRS DAIRCM System into low-rate initial production and expands our ability to provide critical integrated aircraft survivability capabilities to our military customers.”
Baylouny added that the company is proud to help address evolving aircraft survivability requirements and to enhance crew protection with what he called a cost-effective advanced integrated capability.
From an urgent need to a production line
DAIRCM’s route to production began with an urgent operational requirement. In a press release dated March 18, 2020, Leonardo DRS announced that the first AN/AAQ-45(V) DAIRCM systems had been deployed on U.S. Air Force HH-60G helicopters in support of a Joint Urgent Operational Needs Statement, with the company integrating DAIRCM kits on the HH-60G under an Air Force Materiel Command contract.
On July 20, 2020, the company announced a $120 million NAVAIR contract, mixing cost-plus-incentive-fee and firm-fixed-price terms, for engineering design and test hardware. Leonardo DRS said then that the earlier urgent-needs program had fielded the system on U.S. Air Force, Army and Navy platforms, and that the EMD program would continue developing and testing improved capabilities against enhanced and future threats.
That 2020 contract covered non-recurring engineering to design, develop, integrate and test engineering development models and production-representative models of the system’s weapons replaceable assemblies for government testing. The company described an open, scalable architecture that can be optimised for different aircraft types, with a low size, weight and power design suited to rotary and tilt-wing aircraft, including emerging future vertical lift programs. Work was planned at Dallas, San Diego, Fort Walton Beach and Melbourne, Florida, with completion expected in 2024.
According to the 2020 releases, Leonardo DRS developed DAIRCM through three business units: Airborne & Intelligence Systems, Daylight Solutions, and Electro-Optical & Infrared Systems. The company said at the time that, as missile and anti-aircraft threats evolve worldwide, frontline helicopters will need a small but capable system to defeat them. Baylouny, who appears as president and chief executive officer in the November 2026 release, was quoted in both 2020 announcements as executive vice president and chief operating officer.
What the release leaves open
The November 10 release gives no contract ceiling, delivery quantities, production schedule or list of aircraft that will carry the LRIP systems.
Leonardo DRS said the DAIRCM program expands its aircraft survivability portfolio with an integrated capability designed for increasingly complex threat environments, and that it addresses the increasing evolution and proliferation of threats to airborne platforms. The company, listed on Nasdaq under the symbol DRS, says it supplies defense technologies to U.S. national security customers and allies worldwide.
Defense & Military
Ghana Air Force Takes Delivery of Dassault Falcon 6X in Accra
The Ghana Air Force received a Dassault Falcon 6X at Accra on November 16, 2026, under a Parliament-approved fleet programme.

The Ghana Air Force has received a new Dassault Falcon 6X long-range aircraft, which arrived at Accra International Airport on November 16, 2026. The jet belongs to the same Parliament-approved procurement programme as new Airbus H160 and H175 helicopters, the first of which landed in Accra in March 2026.
In a news release dated November 16, 2026, the Ghana Air Force said the delivery fulfils two major defence procurement agreements that Parliament approved in November 2025. The service said the Government of Ghana received the aircraft and that the Ghana Air Force will hold custody of it and operate, maintain and deploy it to meet national requirements.
Arrival in Accra
The aircraft received a ceremonial water cannon salute on arrival. According to the Ghana Air Force, those present included the Minister for Defence, Kenneth Gilbert Adjei, the French Ambassador to Ghana, Diarra Dimé Labille, and members of the Military High Command.
The service described the acquisition as another milestone in the government’s defence modernisation programme, aimed at improving strategic air mobility, operational efficiency and national development. It said the delivery reflects the government’s continued investment in modern aviation assets to strengthen Ghana’s strategic transport capabilities and support national interests.
What the Falcon 6X brings to the fleet
The Ghana Air Force release gives the jet’s maximum range as 5,500 nautical miles (approximately 10,186 kilometres), which it says allows long-distance international flights without refuelling. It also points to Dassault’s Digital Flight Control System, which the service says improves stability, reduces pilot workload and adds safety features, and to a cabin it describes as spacious and adaptable for long journeys.
Dassault Aviation’s published specifications quote the 5,500 nm range at Mach .80 with eight passengers, three crew and National Business Aviation Association (NBAA) instrument flight rules (IFR) reserves, and a maximum operating speed of Mach .90. The aircraft is powered by two Pratt & Whitney PurePower PW812D engines, each listed at 13,500 lb of sea-level thrust.
According to Dassault, the cabin measures 6 ft 6 in high, 8 ft 6 in wide and 40 ft 4 in long, excluding the flight deck and baggage area. The manufacturer states that the Falcon 6X received EASA and FAA certification in August 2023.
Part of a wider fleet renewal
The Falcon 6X is one element of a broader purchase. According to an earlier Ghana Air Force release, the programme includes one H160 and three H175 helicopters from Airbus Helicopters alongside the Falcon 6X from Dassault Aviation. The service said the procurement is meant to address the limitations of its ageing fleet and improve mission readiness and operational flexibility.
The first H175 was ferried from Marignane, France, and arrived in Accra on March 5, 2026, after completing technical acceptance with Airbus Helicopters. The Ghana Air Force said the type would support search and rescue, medical evacuation, humanitarian assistance, disaster response, maritime surveillance, and troop and logistics transport. AirPro News covered that first H175 arrival in March and, before it, Ghana’s Airbus helicopter contract.
A type first shown in Accra in 2024
The Falcon 6X is not new to the Ghana Air Force. On October 1, 2024, the service hosted a static display and flight demonstration of the type at Air Force Base Accra. According to its account of that event, the aircraft shown was the fourth Falcon 6X produced and the first to land in Africa, and the Ghana Air Force described the model as the first extra-widebody business jet.
At that event, Chief of the Air Staff Air Vice Marshal Frederick Asare Kwasi Bekoe praised a partnership with Dassault Aviation spanning more than 14 years and said he was confident the Falcon 6X would help augment the Ghana Air Force’s fleet capabilities. Igor Fain, Dassault Aviation’s International Sales Manager, led the manufacturer’s team.
The release of November 16, 2026 does not give a contract value or an entry-into-service date for the jet. For the H175, the Ghana Air Force listed post-delivery steps before operational deployment, including technical inspections, documentation checks, ground and functional tests, aircrew conversion training and formal induction into the inventory. The Falcon 6X release does not describe the equivalent steps for the jet.
Defense & Military
Germany Funds 16 More Airbus A400M in 2027 Defense Budget
Germany’s Bundestag budget committee cleared 16 more tactical Airbus A400M transports in the 2027 defense budget, the BMVg said.

Germany’s parliamentary budget committee has cleared funding for 16 more Airbus A400M transport aircraft in a tactical configuration, after the Luftwaffe accepted the 53rd and final aircraft of its current order in April 2026. The German Federal Ministry of Defence (BMVg) said the aircraft were among the last changes the committee made to the 2027 defense budget.
In a press release dated November 13, 2026, the ministry said the Haushaltsausschuss (Budget Committee) of the Bundestag had adopted its recommendation for the 2027 defense budget and the economic plan of the Bundeswehr special fund overnight, with a combined volume of more than 139 billion euros. According to the release, the changes made in the committee’s final adjustment session allow the ministry, among other things, to procure 16 additional A400M in tactical configuration, which it described as suitable for deployment across the entire threat spectrum.
What the budget committee decided
The A400M decision came out of the committee’s Bereinigungssitzung, the final adjustment session in which the committee made its last changes to the draft. A Bundestag parliamentary news report of October 16, 2026, said the committee had approved the defense ministry’s budget section, Einzelplan 14, without numerical changes in an earlier session week, and that further changes were possible at the adjustment session scheduled for Thursday, November 12, 2026. The ministry’s release of November 13 says the committee issued its recommendation overnight.
The BMVg said the changes result from current findings and project developments. Besides the A400M, they secure financing for further MEKO A-200 frigates and a fourth fleet service boat (Flottendienstboot), and raise spending on space, including the SATCOM (Stufe 3) project for protected satellite communications and the Sensorwirkverbund Weltraum, a space-based sensor and effector network. Einzelplan 14 is also to get a new budget title for innovation projects and civilian research funding, to pay for short-term procurement and testing of technologies already on the market by the Bundeswehr’s innovation centers and for innovation competitions.
According to the ministry, the changes adopted in the adjustment session offset each other within Einzelplan 14 and do not alter the total volume of the government’s draft. Einzelplan 14 alone grows to around 109.7 billion euros in 2027. The release also says more than 11.6 billion euros will again be available in the coming year, under a separate budget section (Einzelplan 60), to support states attacked in violation of international law, which the ministry links to its continued military support for Ukraine.
Where Germany’s A400M fleet stands
The decision follows the completion of Germany’s existing order in April. OCCAR, the Organisation for Joint Armament Co-operation that manages the A400M program, said a ceremony in Seville, Spain, on April 16, 2026, marked the handover of MSN147, the 53rd A400M for Germany and the final aircraft of Germany’s current order. The Bundeswehr reported that the aircraft landed at Wunstorf air base in Lower Saxony on April 17, 2026, where it joined Air Transport Wing 62 (Lufttransportgeschwader 62). AirPro News covered the 53rd German A400M delivery at the time.
According to the Bundeswehr, Germany is the largest A400M user with 53 aircraft, and the type has been in daily use for eleven years after a program that began in 2014 with delays and early technical problems. The Bundeswehr says the A400M carries up to 37 tonnes about 3,300 km without refueling, can carry up to 116 soldiers, refuels other aircraft in flight and can land on unpaved runways. OCCAR manages the program for Belgium, France, Germany, Spain, Turkey and the United Kingdom.
Self-protection and support
Self-protection systems for German A400M aircraft are already on contract. In July 2025, Elbit Systems said it had received a contract worth about $260 million from Airbus Defence and Space to supply J-MUSIC Directed Infrared Counter Measures (DIRCM) systems for German Air Force A400M aircraft, to be executed over six years following a procurement decision by the Bundeswehr’s procurement office (BAAINBw). AirPro News reported on the J-MUSIC self-protection contract when it was announced.
The Bundeswehr said in April that maintenance, modernization and retrofits with systems that protect against surface-to-air missiles will shape the fleet for decades. It also said Airbus is building an A400M maintenance center at Wunstorf, where about 300 employees are to maintain the German aircraft from mid-2027.
What the release leaves open and what comes next
The ministry’s release does not give a cost for the 16 aircraft, a delivery schedule or a contract route, and it does not say whether the aircraft will add to the 53 already in service or replace some of them. The committee’s decision is a recommendation (Beschlussempfehlung) to the full Bundestag, which still has to hold its final readings.
The BMVg said those final readings of the 2027 budget will take place in the coming weeks. The Bundestag’s parliamentary news service said on November 6, 2026, that the final deliberation of the draft, in the version adopted by the committee, is planned for the session week of November 23 to 27, 2026.
-
Space & Satellites6 days agoNASA Opens Applications for Astronaut Candidate Class of 2027
-
Regulations & Safety6 days agoFAA Orders Ground Stop at All Airports After Telecommunications Outage
-
Space & Satellites4 days agoSpaceX Catches Starship From Orbit as Flight 15 Booster Is Lost
-
Defense Contracts6 days agoAEVEX Wins Nearly $400 Million IDIQ for Unmanned Aircraft Systems
-
Commercial Aviation4 days agoLufthansa A350-1000 Brings Starlink Wi-Fi to Long-Haul on December 3
