Defense & Military
Amentum Secures 995 Million Air Force Contract for MQ-9 Reaper Maintenance
Amentum awarded $995M contract to maintain MQ-9 Reaper UAVs globally through 2030, supporting U.S. Air Force readiness and advanced drone operations.

Amentum Secures $995 Million Air Force Contract for Global MQ-9 Reaper Maintenance: Analysis of Defense Contracting and Military Drone Operations
The recent award of a $995 million indefinite-delivery/indefinite-quantity (IDIQ) contract to Amentum Services Inc. for MQ-9 Reaper maintenance marks a pivotal moment in the evolution of military Drones operations and defense contracting. Announced in September 2024, this contract underscores the U.S. Air Force’s reliance on advanced unmanned aerial systems (UAS) and highlights the expanding role of private sector contractors in sustaining America’s cutting-edge military capabilities. Spanning five years through September 2030, the agreement covers organizational-level maintenance support for MQ-9 Reaper weapons systems at bases in the United States and across global theaters of operation.
This development emerges against the backdrop of steadily growing global defense spending and the rapid adoption of advanced military technologies. According to the Stockholm International Peace Research Institute, world military expenditure reached $2.7 trillion in 2024, the highest figure ever recorded. Unmanned systems, such as the MQ-9 Reaper, are increasingly central to modern military doctrine, and their market is projected to reach $22.8 billion by 2030. The Amentum contract both reflects and reinforces these trends, raising important considerations for military readiness, industrial base health, and the future of defense outsourcing.
Corporate Profile and Strategic Positioning of Amentum
Amentum Holdings Inc. has rapidly emerged as a leading government services contractor in the United States. Established in 2020 as a spinout from AECOM’s Management Services Group, Amentum’s growth strategy has focused on acquisitions and mergers, including the purchases of DynCorp in 2020 and PAE in 2022. In March 2024, the company merged with Jacobs Solutions Inc.’s Critical Mission Solutions and Cyber and Intelligence businesses, further consolidating its position in the defense services sector.
As of late 2024, Amentum employs over 20,000 people across 48 states and 28 foreign countries and territories. Its expertise spans critical mission support, equipment sustainment, information technology, intelligence operations, nuclear and environmental remediation, and facility maintenance. Notable projects include training all U.S. Army helicopter pilots at Fort Rucker and managing major nuclear remediation sites such as Savannah River and Hanford.
The company’s September 2024 public offering on the New York Stock Exchange under the ticker “AMTM” and inclusion in the S&P 500 index underscore its status as a major defense contractor. Amentum’s operational footprint and technical depth position it to meet the complex maintenance needs of the MQ-9 Reaper fleet and similar advanced defense systems.
Understanding the MQ-9 Reaper Program and Its Strategic Importance
Technical Capabilities and Role
The General Atomics MQ-9 Reaper, also known as Predator B, is a medium-altitude, long-endurance unmanned aerial vehicle (UAV) developed primarily for the U.S. Air Force. First flown in 2001, the MQ-9 represents a significant technological leap over its predecessor, the MQ-1 Predator. The Reaper is powered by a 950-shaft-horsepower Honeywell turboprop engine, enabling it to carry 15 times the ordnance payload of the MQ-1 and cruise at three times the speed.
The MQ-9’s specifications include a 66-foot wingspan, a length of 36 feet, and a maximum takeoff weight of 10,500 pounds (or 11,700 pounds in extended range configuration). It can operate at altitudes up to 50,000 feet, with a maximum speed of 240 knots and an endurance of over 27 hours for surveillance missions. The aircraft’s payload capacity,850 pounds internal and 3,000 pounds external,allows for a wide range of mission configurations, from intelligence gathering to precision strike.
As of May 2021, the U.S. Air-Forces operated over 300 MQ-9 Reapers, with Air Force Special Operations Command maintaining 50 aircraft as of January 2025. The average unit cost is estimated at $33 million (2023 dollars), and a complete system (four aircraft, sensors, ground station, and satellite link) cost $56.5 million (FY2011 dollars). The MQ-9 fleet’s projected end of service is 2035, making robust maintenance support essential for operational readiness.
“The MQ-9 Reaper’s endurance, payload, and sensor suite make it a cornerstone of U.S. and allied intelligence, surveillance, and reconnaissance capabilities.”
Operational and Strategic Value
The MQ-9 Reaper’s flexibility and persistence have made it an indispensable asset for a range of military missions, including intelligence, surveillance, reconnaissance (ISR), close air support, combat search and rescue, and precision strike. Its ability to loiter for extended periods and deliver accurate, real-time intelligence has proven critical in both counterterrorism and conventional operations.
Beyond the U.S., the MQ-9 has been exported to several allied nations, including the United Kingdom, Italy, France, and Spain. India has also signed a major deal for 31 MQ-9B UAVs, further expanding the platform’s global footprint and increasing demand for specialized maintenance and support services.
The advanced sensor and communications suite on the MQ-9 enables integration with joint and coalition forces, enhancing situational awareness and force coordination. As military operations grow more networked and data-driven, the maintenance and readiness of such platforms are directly linked to broader operational effectiveness.
Contract Specifications and Operational Scope
The newly awarded contract (FA4890-25-D-0004) tasks Amentum with providing organizational-level maintenance support for MQ-9 Reaper systems worldwide. This includes inspection, repair, and replacement of components to ensure mission readiness. The contract’s IDIQ structure allows for flexible tasking, with a ceiling value of $995 million over five years, through September 29, 2030.
Maintenance will be performed at multiple strategic locations, including Creech Air Force Base (NV), Nellis AFB (NV), Shaw AFB (SC), Ellsworth AFB (SD), Whiteman AFB (MO), Battle Creek Air National Guard Base (MI), Berry Field ANGB (TN), Fort Smith (AR), Horsham ANGB (PA), and various overseas sites. This global reach reflects the widespread deployment of MQ-9 operations for both combat and training missions.
The contract award followed a competitive process, with three offers received. Initial fiscal 2025 operations and maintenance funds of $42,218 were obligated at award, with additional funding expected as task orders are issued. The Air Combat Command at Joint Base Langley-Eustis, Virginia, serves as the contracting authority.
“Organizational-level maintenance is the highest level performed by operating units, encompassing advanced sensors, weapons, communications, and propulsion systems,critical for keeping MQ-9s mission-ready worldwide.”
Historical Context and Previous Maintenance Contracts
The current contract builds on a substantial history of contracted maintenance for unmanned aircraft. A previous major contract (FA4890-18-D-0002) was awarded in March 2018 to URS Federal Technical Services Inc. (later acquired by Amentum), with an initial ceiling of $961 million, later increased to $1.922 billion. This agreement covered organizational-level maintenance for MQ-1, MQ-9, and RQ-4 systems, with work performed in Afghanistan and other global locations.
Through the previous contract, $440.2 million was obligated, representing 23% of the total ceiling, and a reported backlog of $256.7 million highlighted the sustained demand for these services. The expansion of the contract ceiling reflected the growing scope and operational tempo of drone fleets.
The Department of Defense has consistently emphasized the comprehensive nature of these contracts, which include not only maintenance but also qualified launch and recovery element pilot and sensor operator aircrew support. The continuity in contract language and scope speaks to the enduring requirements of the MQ-9 program and the Air Force’s approach to sustaining critical unmanned systems.
Military Drone Maintenance Market Dynamics and Cost Trends
The military drone maintenance sector is shaped by the broader trend of rising maintenance costs for advanced military aircraft. According to analysis by Oliver Wyman, global spending on maintenance, repair, and overhaul (MRO) for military aircraft reached approximately $97 billion in 2025, with projections indicating annual growth of 1.4%,potentially exceeding $111 billion by 2035.
Drone fleets are a significant driver of this growth. Over the past five years, major air forces have added 350 drones to their fleets, with the total number expected to more than double to 3,460 by 2035. Modern drones, equipped with artificial intelligence and sophisticated navigation systems, require specialized and costly maintenance operations.
Notably, the cost of maintaining advanced aircraft is rising faster than fleet size. For example, F-35s constitute 2.2% of the global military aircraft fleet but represent 4.5% of global maintenance spending. Similar patterns are seen with technologically advanced drones. The military drone market itself is valued at $15.23 billion in 2024 and is projected to reach $22.81 billion by 2030, with the U.S. maintaining the largest share.
“The integration of advanced technologies into military drones is driving maintenance costs upward, making specialized contractor support increasingly vital.”
Strategic and Operational Implications for Military Readiness
The outsourcing of MQ-9 maintenance to Amentum is consistent with broader trends in military contracting and force structure optimization. The U.S. military has increasingly relied on contractors for logistics and maintenance, with the Army’s service contract expenses rising from less than a quarter to more than a third of its total budget by 2004.
Outsourcing brings specialized skills and resources to the table, often leading to higher maintenance quality for complex systems like the MQ-9. However, it also introduces risks, such as potential loss of control over mission-essential functions and dependency on external providers. Effective oversight is critical to ensure contractor performance aligns with operational requirements.
For the MQ-9 program, reliable maintenance is directly tied to operational readiness. The aircraft’s diverse mission set,ranging from ISR to combat search and rescue,means that any degradation in maintenance quality could impact aircraft availability and mission success, especially in high-tempo or contested environments.
Global Defense Spending Context and International Implications
The Amentum contract award occurs amid record global defense spending. World military expenditure climbed by 9.4% in real terms to $2.7 trillion in 2024, marking the tenth consecutive year of increases. The United States led with $997 billion in spending, a 5.7% rise from 2023.
This surge is driven by evolving security challenges, including Russia’s invasion of Ukraine and rising tensions in the Indo-Pacific. European nations have also significantly increased military investment, with total European defense spending up 17% in 2024.
The focus on advanced technologies,drones, in particular,reflects a shift in warfare paradigms. The global drone warfare market was valued at $21.3 billion in 2023 and is projected to reach $42.1 billion by 2030. International customers, such as India’s recent $3.4 billion deal for MQ-9B UAVs, further expand the demand for maintenance expertise and services.
Future Outlook and Industry Implications
The Amentum contract is indicative of broader trends shaping the defense industry. The five-year term aligns with the MQ-9 fleet’s projected service life, suggesting that such maintenance contracts will remain essential as the Air Force transitions to next-generation systems.
Technological advancements are increasing the complexity of military systems, driving up maintenance requirements and costs. Contractors with proven expertise in maintaining advanced platforms are likely to see continued demand. Industry consolidation, as seen in Amentum’s rapid expansion, suggests that larger, more capable firms will dominate future defense services contracts.
Supply chain management is also becoming more critical, as contractors must ensure the availability of spare parts and address obsolescence issues. Effective supply chain strategies will be a key differentiator for companies competing for future maintenance contracts.
Economic and Budgetary Considerations
The $995 million contract provides Amentum with significant revenue visibility and supports its growth trajectory as a newly public company. For the U.S. government, the contract represents a major operations and maintenance commitment to sustain critical drone capabilities.
The cost-effectiveness of contractor-performed maintenance versus military-performed maintenance remains a subject of debate. Advocates highlight contractor expertise and efficiency, while critics point to potential cost overruns and dependency risks. The competitive award process for this contract, with three offers received, suggests ongoing market interest and the possibility of favorable pricing for the government.
Conclusion
The award of the $995 million MQ-9 Reaper maintenance contract to Amentum Services Inc. marks a significant milestone in defense contracting and military aviation. It reflects the increasing importance of unmanned systems, the rising complexity of military technologies, and the continued trend toward outsourcing specialized functions to private contractors.
As global defense spending and the adoption of advanced technologies continue to rise, contracts like Amentum’s will play a critical role in sustaining operational readiness and supporting the evolution of military capabilities. The implications extend beyond the immediate scope of the contract, shaping broader debates on military readiness, industrial base health, and the optimal balance between in-house and contractor-provided services.
FAQ
What is the value and duration of the Amentum Air Force contract for MQ-9 maintenance?
The contract is valued at up to $995 million and runs through September 29, 2030.
What does organizational-level maintenance for the MQ-9 Reaper include?
It covers inspection, repair, and replacement of components, including advanced sensors, weapons, communications, and propulsion systems, to keep the Military-Aircraft mission-ready.
Why is contractor maintenance important for military drone operations?
Advanced drones require specialized technical expertise for maintenance. Contractors like Amentum provide skills and resources that support operational readiness and allow military personnel to focus on core missions.
How does the Amentum contract fit into broader defense industry trends?
It reflects the ongoing trend toward outsourcing complex maintenance tasks, the increasing complexity of military systems, and the consolidation of defense services among large contractors.
Sources: ClearanceJobs
Photo Credit: National Guard Bureau
Defense & Military
RCAF Accepts First Two CF-35A Fighters at Luke Air Force Base
Canada takes delivery of CF-35A fighters AR-1 and AR-2 at Luke AFB as its C$19B procurement program remains under review.

This is original reporting and analysis by AirPro News.
The Royal Canadian Air Force (RCAF) officially accepted delivery of its first two Lockheed Martin CF-35A Lightning II stealth fighters at Luke Air Force Base in Arizona on October 22, 2026, marking the physical introduction of the fifth-generation platform into the Canadian military.
The handover of the aircraft, designated AR-1 and AR-2, proceeds even as the broader C$19 billion procurement program remains in political limbo. Following trade and diplomatic tensions with the United States, Prime Minister Mark Carney initiated a formal review of the 88-aircraft purchase in March 2025, leaving the ultimate size and composition of Canada’s future fighter fleet unconfirmed.
Initial training operations in Arizona
The first two CF-35As will remain stationed at Luke Air Force Base to support the initial training cadre of Canadian instructor pilots and maintainers. The Arizona installation serves as a primary international training hub for the F-35 platform, hosting multiple allied nations. According to the Department of National Defence (DND), a total of eight Canadian jets are planned to be based at the facility through 2026 and 2027.
The delivery occurred exactly one month after the first Canadian aircraft completed its maiden flight at Lockheed Martin’s production facility in Fort Worth, Texas, on September 23, 2026. In an official statement regarding the delivery, the RCAF noted that the arrival of the jets represents a foundational step, adding that the future of air and space power is built on more than equipment alone.
Procurement review and fleet uncertainty
Canada has been a partner in the Joint Strike Fighter program since 1997. After years of political debate and a reset of the procurement process, the Canadian government selected the F-35A in 2022 over the Saab Gripen E to replace its aging McDonnell Douglas CF-18 Hornet fleet. The CF-18 has been in service since the 1980s and is slated for retirement in the early 2030s. In January 2023, Ottawa finalized the agreement to purchase 88 F-35As.
The procurement trajectory shifted in March 2025 when Prime Minister Carney ordered a formal review of the acquisition. Currently, only 16 of the 88 jets are firmly committed and funded. Minister of National Defence David McGuinty confirmed the ongoing evaluation, stating that the question of the F-35 remains under review and that both he and the prime minister are highly engaged in the issue alongside the emerging Defence Investment Agency.
The government is actively evaluating the possibility of operating a mixed fighter fleet. This approach could integrate Saab Gripen E fighters alongside a smaller number of F-35s, reopening a competition that Saab had previously lost during the Future Fighter Capability Project selection.
Path to operational capability
Despite the political uncertainty surrounding the final fleet size, the RCAF continues to execute its transition plan for the funded aircraft. The first CF-35As are scheduled to arrive on Canadian soil at 4 Wing Cold Lake in Alberta in 2028.
The air force plans to declare Initial Operational Capability (IOC) for the CF-35A fleet between 2029 and 2030. This timeline aligns with the necessary infrastructure upgrades at Canadian bases and the completion of initial pilot and maintainer training in the United States.
AirPro News analysis
Canada’s ongoing review of the F-35 program is highly unusual for a Tier 3 partner at this late stage of procurement. While the physical delivery of AR-1 and AR-2 ensures the RCAF can begin building its fifth-generation institutional knowledge, the potential pivot to a mixed fleet introduces significant logistical and interoperability questions. Operating both the CF-35A and the Saab Gripen E would require maintaining two distinct supply chains, training pipelines, and maintenance infrastructures. We note that these dual-fleet requirements could potentially offset the initial acquisition savings of a split purchase, complicating the RCAF’s transition away from the CF-18 Hornet.
Photo Credit: Royal Canadian Air Force
Defense & Military
U.S. Army Validates AH-64E Apache Maritime Lifting Sling
The U.S. Army validated a lifting sling for the AH-64E Apache, enabling crane-based maritime loading with rotor blades folded.

The U.S. Army has successfully validated a prototype lifting sling for the Boeing AH-64E Apache, clearing the attack helicopter for crane-based maritime loading and unloading with its main rotor blades folded.
Announced on October 21, 2026, by the Apache Helicopter Project Office, the validation fulfills the final transportability requirement outlined in the aircraft’s Capability Production Document (CPD). The milestone significantly expands the Army’s expeditionary logistics options by reducing reliance on specialized port infrastructure.
Expanding maritime logistics capabilities
Prior to this validation, maritime deployment of the Apache fleet often depended on Roll-On/Roll-Off (RORO) vessels or specialized dock facilities equipped with ramps capable of supporting towed aircraft. The new sling, engineered by industry partner ASRC Federal, allows the AH-64E to be hoisted using standard harbor and shipboard cranes.
This Lift-On/Lift-Off (LOLO) capability mitigates transit bottlenecks and lowers vessel charter costs by opening access to a wider range of global seaports. The U.S. Army stated that the ability to load and unload the aircraft with its main rotor blades folded is a major milestone for expeditionary mobility.
Prototype validation and next steps
The validation exercise took place at Fort Hood, Texas, overseen by the Apache Project Management Transportability Team based at Redstone Arsenal, Alabama. During the testing, the team successfully demonstrated the safe hoisting of the AH-64E using the ASRC Federal prototype hardware.
Following the exercise, the test team identified minor adjustments required before full production. These modifications include the addition of protective padding to prevent the hoisting cable from contacting the main rotor blades during lifting operations. Once these adjustments are validated, ASRC Federal will manufacture and deliver five contracted production prototypes to the U.S. Army.
The AH-64E Apache global footprint
Manufactured by The Boeing Company, the AH-64 Apache has served as the primary attack helicopters for the U.S. Army since 1984. The AH-64E is the latest variant, featuring upgraded sensors, software, and weapons performance. The U.S. Army is currently modernizing its fleet to the AH-64E Version 6.5 standard while gradually retiring older AH-64D models.
The global Apache fleet consists of more than 1,280 aircraft operating across 19 defense forces. In March 2023, Boeing reported the U.S. Army fleet had surpassed 5 million total flight hours.
International demand for the platform remains active. On August 11, 2026, Boeing signed offset agreements with Polish industry partners to build a long-term sustainment infrastructure supporting Poland’s incoming fleet of 96 AH-64E helicopters.
AirPro News analysis
The shift from RORO dependency to LOLO capability represents a critical logistical upgrade for U.S. Army aviation. As military planners focus on distributed operations and expeditionary mobility, the ability to utilize commercial container ports and standard maritime cranes reduces reliance on specialized military sealift vessels. This transportability milestone ensures the AH-64E can be deployed more rapidly and flexibly in contested or infrastructure-limited theaters.
Photo Credit: United States Army – Courtesy
Defense & Military
GA-ASI and Spirit Defense Partner on FQ-42 Vengeance CCA
GA-ASI and Spirit Defense team up to manufacture the FQ-42 Vengeance airframe as the USAF targets 500 CCAs by 2032.

General Atomics Aeronautical Systems, Inc. (GA-ASI) and Spirit Defense have formed a strategic partnership to manufacture the airframe for the U.S. Air Force’s FQ-42 Vengeance Collaborative Combat Aircraft (CCA).
Announced in an October 23, 2026, press release, the agreement designates Spirit Defense, a Boeing Company, as a fuselage design-build partner. The collaboration aims to expand manufacturing capacity and establish production resilience as the U.S. Air Force (USAF) accelerates its uncrewed fighter program toward a goal of fielding hundreds of aircraft by the next decade.
Scaling production for the uncrewed fleet
The partnership connects GA-ASI headquarters in San Diego, California, with Spirit Defense operations in Wichita, Kansas. Spirit Defense operates as an independent supplier to the defense industry, providing engineering, manufacturing, and lifecycle support for military programs. By integrating Spirit Defense into the supply chain, GA-ASI intends to reduce the risk of single points of failure and increase the industrial depth required for high-volume production.
GA-ASI recently completed a new low-observable paint facility to support the CCA program and stated it is currently positioned to deliver six aircraft per month to meet initial USAF objectives. The addition of Spirit Defense is designed to scale that output further.
David R. Alexander, President of GA-ASI, highlighted the strategic necessity of the agreement in meeting military requirements.
“We’re excited to be working with Spirit Defense. We’ve established our proven design, development, and manufacturing capability for the FQ-42. With Spirit Defense we add capacity, which is exactly the kind of production resilience our U.S. Air Force customer is looking for with its CCA ramp-up. This kind of partnership represents the scalable industrial base the Air Force and the U.S. Department of [Defense] are looking for from industry.”
Keith Schrader, President and CEO of Spirit Defense, confirmed the company’s readiness to support the airframe build.
“We’re proud to bring deep manufacturing expertise and proven capabilities to this important program. Our team understands the responsibility that comes with supporting critical national defense programs, and we’re ready to deliver for our customer and the warfighter.”
The FQ-42 Vengeance in testing and evaluation
The FQ-42 Vengeance is a purpose-built, fifth-generation uncrewed fighter developed to operate alongside crewed aircraft in semi-autonomous combat roles. The design features an internal weapons bay, low observability, and a modular architecture intended for the rapid integration of mission systems and autonomy software.
On September 18, 2026, GA-ASI delivered a new FQ-42 Vengeance to Creech Air Force Base in Nevada to support continued USAF test, evaluation, and experimentation. The aircraft has already participated in formation flights with crewed fighters, including the F-35 Lightning II and the F-15E Strike Eagle.
Secretary of the Air Force Troy Meink officially named the aircraft “Vengeance” on September 14, 2026. The aircraft was previously known internally as Dark Merlin. During the naming announcement, Meink emphasized the rapid pace of the acquisition program.
“Today, the first FQ-42 and FQ-44 increments are already rolling off the assembly line,” Meink stated. “They’ll be performing many of the same missions that we do with manned fighters today.”
Evolution of the Collaborative Combat Aircraft initiative
The USAF Collaborative Combat Aircraft program is designed to field affordable, semi-autonomous drones to augment crewed fighter squadrons. The target unit cost for the aircraft at full-rate production is approximately $20 million.
GA-ASI was selected by the USAF in April 2024 to build production-representative flight test articles for the program. The FQ-42 Vengeance completed its maiden flight in August 2025, and GA-ASI secured an initial production contract from the USAF in June 2026. The FQ-42 is one of two primary designs selected for the first increment of CCA production, alongside Anduril Industries’ FQ-44 Fury.
The scope of the CCA program has expanded significantly since its inception. Initial projections called for 150 aircraft, but on September 14, 2026, the USAF confirmed a revised goal to field at least 500 Collaborative Combat Aircraft by 2032.
Mike Shortsleeve, Vice President for Strategy Business Development at GA-ASI, addressed the increased production targets following the USAF announcement.
“The intent for them is to go up to as many as 500 aircraft by 2032,” Shortsleeve said. “We’re ready to do that production.”
GA-ASI has operated as a sole manufacturer of its Uncrewed Aircraft Systems (UAS) line since its founding in 1992. Over 30 years, the company’s Predator line has logged more than 9 million flight hours across platforms including the MQ-1C Gray Eagle, MQ-9A Reaper, MQ-9B SkyGuardian/SeaGuardian, and the MQ-20 Avenger.
Beyond the domestic FQ-42 program, GA-ASI is engaged in discussions with international militaries regarding the Gambit Series. The Gambit Series is a family of modular CCAs derived from the FQ-42, the XQ-67A Off-Board Sensing Station, and the MQ-20 Avenger, optimized for electronic warfare, suppression and destruction of enemy air defenses, and stand-off precision strike missions.
AirPro News analysis
The partnership between GA-ASI and Spirit Defense illustrates the central challenge of the Collaborative Combat Aircraft program: industrial capacity. Designing a capable uncrewed fighter is only half the mandate; the other half is manufacturing it at a scale and price point that traditional defense primes have struggled to achieve with crewed aircraft. By bringing a Boeing subsidiary into the fold for fuselage production, GA-ASI is signaling to the Department of Defense that it can meet the aggressive 2032 target of 500 aircraft without requiring massive, unilateral capital expenditure.
This distributed manufacturing approach also directly addresses the Pentagon’s ongoing concerns regarding supply chain fragility. Relying on a single facility in San Diego for a critical next-generation platform presents a strategic vulnerability. Distributing the airframe build to Wichita builds redundancy into the program while leveraging existing aerospace manufacturing infrastructure, a model that will likely become standard as the USAF pushes for higher volumes of attritable or semi-attritable autonomous systems.
Photo Credit: General Atomics
-
Business Aviation2 days agoDTA Aircraft JP1 eVTOL Targets April 2027 US Flight Testing
-
Regulations & Safety2 days agoFAA Launches MedGuide Medication Database for Aviators
-
Business Aviation3 days agoCivil Air Patrol Orders 21 Cessna Aircraft From Textron Aviation
-
Space & Satellites2 days agoBAE Systems Acquires Colorado Facility for Space Hardware
-
Business Aviation3 days agoUniversal Aviation Rebrands as Affinity Aviation at NBAA 2026


