Technology & Innovation
SkyDrive Studies 146 Osaka Rooftops for eVTOL Vertiports
SkyDrive targets 146 Osaka rooftop emergency helipads for eVTOL vertiport conversion, aiming for 2028 commercial service.

Japanese electric vertical takeoff and landing (eVTOL) developer SkyDrive Inc. has initiated a feasibility study to convert 146 existing rooftop emergency landing sites in Osaka City into commercial vertiports, aiming to bypass the high costs and space constraints of ground-up infrastructure in dense urban centers.
Announced in an October 1, 2026, press release, the initiative brings together local government entities and corporate partners, including Chodai Co. Ltd., Kansai Electric Power Co. Inc., the Organization of Airport Facilitation, and Osaka Metro. The consortium will evaluate structural and regulatory hurdles ahead of a targeted 2028 commercial service launch in Osaka Prefecture and Osaka City.
Evaluating urban infrastructure
Finding suitable locations for new takeoff and landing sites remains a primary obstacle for urban air mobility operators. In Osaka City, local fire safety regulations require buildings over 100 meters tall to feature rooftop emergency landing sites, which are marked with an “H” symbol. SkyDrive identified 146 such locations that already possess reinforced floor loading, fire suppression systems, and lighting.
Currently, Japanese regulations restrict the use of these helipads exclusively to emergency disaster relief operations. The newly launched study aims to determine what modifications and regulatory exemptions would be required from the Japan Civil Aviation Bureau and the Osaka Municipal Fire Department to open these sites to daily commercial eVTOL traffic.
In its official statement, SkyDrive noted the strategic divergence from other industry players regarding infrastructure use.
“Unlike the global eVTOL market’s primary focus on inter-city transport between major airports and suburban heliports, SkyDrive aims to make daily intra-city travel accessible using compact, quiet, and agile aircraft.”
Regulatory and engineering hurdles
The feasibility study will conduct a comprehensive review of the physical and operational requirements for rooftop vertiports. Engineers will assess floor load capacities to ensure the structures can withstand repeated aircraft landings rather than occasional emergency use.
The survey will also map out passenger movement flows during flight diversions and establish logistics for transporting aircraft off the roof in cases of mechanical failure. The consortium must evaluate airspace compliance, wind patterns at high altitudes, and noise impacts on surrounding urban environments to address regulatory and engineering barriers.
SkyDrive has tailored its aircraft design to align with these infrastructure constraints. In September 2026, the manufacturer published its updated aircraft design concept, which emphasizes low disk loading. This design choice is intended to ensure stable hover capabilities and safe vertical landings directly onto constrained rooftop vertiports, even in single-failure scenarios.
SkyDrive production and operational timeline
The Osaka vertiport study is part of a broader push to establish a viable eVTOL ecosystem in Western Japan. On October 6, 2026, SkyDrive announced a parallel joint initiative with leading enterprises in the Kansai region, including MUFG Bank Ltd., to evaluate the commercial deployment and operational framework for eVTOL aircraft across the wider area.
These infrastructure and operational studies run concurrently with the company’s manufacturing ramp-up under the leadership of Chief Executive Officer Tomohiro Fukuzawa. SkyDrive began production of the SKYDRIVE (Model SD-05) eVTOL in March 2024 at a facility owned by Suzuki Motor Corporation in Iwata-city, Shizuoka. The plant has a maximum annual production capacity of 100 aircraft.
The company previously conducted extensive demonstration flights at the Expo 2025 in Osaka between July 31, 2025, and August 24, 2025. Data gathered during those flights is now informing the push toward the 2028 commercial launch target shared by SkyDrive and Osaka Metro.
AirPro News analysis
We view the Osaka rooftop study as a highly pragmatic approach to the vertiport real estate bottleneck. Ground-up vertiport construction in tier-one cities requires prohibitive capital expenditure and complex zoning approvals. By targeting existing emergency helipads, SkyDrive is attempting to leverage sunk infrastructure costs. If the consortium can successfully lobby regulators to permit dual-use of these sites, it would create a scalable, low-capex model for intra-city eVTOL networks that other municipalities could replicate.
Electric Aircraft
Vertical Aerospace Completes Bristol Powertrain and Battery Centre
Vertical Aerospace finished a 30,000-square-foot Bristol centre expected to triple battery capacity, with operations ramping up from 2027.

Vertical Aerospace has completed construction of the Vertical Powertrain Centre, a 30,000-square-foot facility in Bristol, UK, that the company expects to triple its battery-production capacity over time. Equipment installation and engineering activity come next, with operations expected to ramp up from 2027.
Vertical Aerospace (NYSE: EVTL) announced the milestone in a press release dated November 23, 2026. The centre sits beside the company’s existing Vertical Energy Centre (VEC) and will support powertrain engineering, systems integration, and battery testing and production for Valo certification aircraft and early commercial production. Vertical presents its batteries as a source of recurring revenue: it expects to supply approximately 20 battery packs per aircraft over each aircraft’s operational life.
What the new building will do
According to the release, powertrain systems and batteries are core in-house technologies for Vertical. They power the all-electric Valo, a piloted, four-passenger electric vertical take-off and landing (eVTOL) aircraft, and the company’s hybrid-electric programme. Vertical works with Honeywell, Syensqo and Sonaca on other key aircraft components.
Beyond production, the centre will develop battery recycling, reuse and remanufacturing capabilities for second-life applications in eVTOL aircraft, the wider aerospace sector, high-power charging and other mobility sectors.
Richard Moore, VP of Powertrain at Vertical Aerospace, said the facility “will bring together batteries, power electronics and propulsion systems for integrated development and testing.” He said it would help the company scale battery production for its certification aircraft and first customers, and pointed to longer-term potential to supply Vertical’s powertrain and battery expertise beyond its own aircraft and the eVTOL sector.
How the plan for the Bristol site took shape
The new centre builds on the 15,000-square-foot VEC, which opened in 2023 and has designed, tested and produced the batteries used in Vertical’s piloted flight testing since 2024. On March 18, 2026, Vertical said its automated battery pilot production line was operational at the VEC, built to test and produce the final battery packs for its seven Valo certification aircraft. That release said the flight-test batteries deliver “up to 1.4 MW of peak power during flight testing.”
The same March release set out plans for “Vertical Energy Centre 2 (VEC2), its powertrain hub”: a new 30,000 sq ft facility adjacent to the existing site, expected at the time to open later in 2026 and to triple battery production capacity. The Vertical Powertrain Centre announced on November 23 has the same floor area, location and capacity goal. In March, Vertical said it expected to have invested £6.4 million ($8.5 million) across the VEC and VEC2 facilities by 2027.
On May 19, 2026, Vertical reported the first all-electric Valo battery from the upgraded VEC line and the start of testing of its hybrid-electric propulsion system on the Hybrid Propulsion Evaluation Rig (HYPER) at its Flight Test Centre at Cotswold Airport. The company is targeting certification of the hybrid-electric variant with the UK Civil Aviation Authority (CAA) and EASA.
Where Valo certification and production stand
The powertrain centre is one part of what Vertical calls a phased investment in engineering, battery production and aircraft assembly. On September 25, 2026, the company opened an Aircraft Assembly Centre at Cotswold Airport, backed by a £1.5 million investment and adding 60,000 square feet of space. Vertical said then that it is working with the CAA toward a target of Type Certification in 2029, with assembly of the first certification-conforming aircraft expected to begin in the fourth quarter of 2027.
The Cotswold centre will also retrofit one prototype for hybrid-electric flight testing in the first half of 2027. After certification, it has capacity to assemble more than 25 Valo aircraft a year during early production. Higher-volume manufacturing will take place at a separate full-scale production facility, and Vertical said in the November 23 release that it expects to announce the location of that first full-scale aircraft production site before the end of 2026.
The demand figures come from the company. Vertical reports about 1,500 pre-orders for Valo from customers on four continents, including American Airlines, Avolon, Bristow, GOL and Japan Airlines, and says certain customer obligations are expected to be fulfilled through third-party agreements. In March, it said it expected to have supplied up to approximately 45,000 battery packs across its aircraft fleet by 2035.
The November release also cites an analysis by Frontier Economics, commissioned by Vertical and based on data the company supplied, which estimates that Vertical could add £3 billion a year to the UK economy by 2035 and anchor more than 2,000 high-value jobs, with 90% of future sales expected from global markets.
Technology & Innovation
Zurich Airport Trials Four Self-Driving Wheelchairs for PRM Passengers
Zurich Airport is testing four self-driving wheelchairs over three years, taking reduced-mobility passengers from a waiting area to Dock A gates.

Zurich Airport (ZRH) will put four self-driving wheelchairs into service on set airside routes during a three-year trial, carrying passengers with reduced mobility from their waiting area to the gates in Dock A so that assistance staff can spend more time with travellers who need hands-on help.
Flughafen Zürich AG announced the trial in a press release dated November 16, 2026. The airport is following a path Singapore Changi Airport (SIN) has already taken: Changi Airport Group and ground handler SATS began the first phase of an autonomous wheelchair deployment there on August 4, 2026, after trials in which more than 13,000 passengers used the chairs.
How the Zurich trial will work
The wheelchairs will run on set routes in the passenger area, where no boarding pass, security or passport checks are needed. At first they will carry passengers between the airside waiting area for passengers with reduced mobility and the gates in Dock A, with an extension to Dock B planned for a later stage, according to the airport.
Before each trip, staff from the airport’s PRM Services unit (the team that assists passengers with reduced mobility) introduce passengers to the wheelchair and explain how to use it. The chair then takes the passenger along the set route to the gate on its own. Each unit has 30 sensors that continuously monitor its surroundings, detect obstacles and brake automatically when needed. Passengers who need help during the journey can press an SOS button, and PRM Services staff will assist on site.
The airport said the wheelchairs are meant to supplement personal assistance, not replace it, and that using them is optional. The trial will test how the chairs fit into existing PRM Services operations and how much they can reduce the workload of staff.
The release does not name the manufacturer or supplier of the wheelchairs, give a start date for the first trips, or describe any remote monitoring of journeys beyond the SOS button.
Who pays for assistance at Zurich
Under EU regulations, airports must assist passengers with reduced mobility. At Zurich, Flughafen Zürich AG staff provide the service free of charge to eligible passengers, and it is funded through airport charges. In September 2023, the airport said the service is financed by a solidarity contribution of one franc per passenger from airport charges, and that responsibility for these passengers passed to Swiss airport operators under a 2009 EU regulation.
The airport operator has not always run the service itself. In that September 2023 release, Flughafen Zürich AG said it would take over the service from January 2025 along with approximately 120 employees of Goldair AAS Assistance AG, whose five-year contract ran until the end of 2024, and would assign it to its Aviation Division. It estimated about 250,000 passengers with reduced mobility for the 2023 operating year, just under 1% of total passenger volume.
For scale, the AirPro Atlas record for Zurich Airport lists 32,593,966 passengers in 2025.
Part of a wider automation programme at ZRH
The airport said the wheelchair trial is one of several automation projects at Zurich, which already uses cleaning robots, self-driving waste bins and automated shuttle buses for employees. The shuttle project, run with technology partner WeRide since March 2025, reached the targeted Level 4 automation level at the start of September 2026, when two buses began operating with no safety driver on board, monitored from a remote cockpit by employees of partner companies Swissport and Krummen Kerzers.
Coralie Klaus Boecker, Head ZRH Innovation Hub at Zurich Airport Ltd., said in the September 9, 2026, release that gradual vehicle automation can make an important contribution for airports because of an emerging shortage of skilled workers. Senior Innovation Manager Raphaël Glaesener said that “Automated driving does not mean that people disappear,” adding that tasks will change. The two buses had covered more than 15,000 kilometers, and their operation is planned until the end of 2026, with a possible continuation under review.
On the ramp, Swissport announced on May 21, 2025, a pilot with UK-based Aurrigo International at Zurich, starting with a digital simulation platform called Auto-Sim and followed by a live trial of Aurrigo’s autonomous electric Auto-DollyTug, which has 360° obstacle detection.
What Changi’s rollout shows
Changi’s experience gives a reference point for what Zurich will be testing. Changi Airport Group and SATS said trials began in Terminal 3 in March 2025 and later expanded to Terminal 2. The deployment supports about 10% of daily mobility assistance demand at Changi, and the airport recorded a 20% increase in wheelchair assistance requests between 2023 and 2025.
The Changi chairs follow predefined routes within departure transit areas, move only when the seatbelt is fastened, and carry an emergency stop button and an assistance call function, while a SATS ground handling supervisor monitors each journey from a control centre. Damon Wong, Senior Vice President, Airport Operations Planning at Changi Airport Group, said that “The autonomous wheelchairs offer these passengers greater independence and convenience.”
AirPro News has also covered accessibility work for these passengers inside the cabin, such as Airbus’s Airspace U Suite for wheelchair users. At Zurich, the next step the airport has named is the later extension of the routes to Dock B.
Sustainable Aviation
Metafuels, Norwegian and European Energy Plan Danish e-SAF Chain
Metafuels, Norwegian and European Energy signed an MoU on Danish e-SAF, starting with a showcase flight on fuel made in Switzerland.

Swiss aviation technology company Metafuels, Nordic airline Norwegian and Danish renewable energy developer European Energy have signed a memorandum of understanding (MoU) to develop a Danish value chain for synthetic sustainable aviation fuel (e-SAF). Their first step is a showcase flight on fuel made from European Energy e-methanol at Metafuels’ demonstration plant in Switzerland.
Metafuels announced the agreement in Copenhagen on November 19, 2026. The partnership builds on heads of terms already agreed between Metafuels and Norwegian for future e-SAF offtake from Turbe, Metafuels’ first commercial facility in the Port of Rotterdam. European Energy now joins that chain, with e-methanol supply to Turbe being explored, and the partners will look at longer-term commercial-scale e-SAF production with more of the value chain in Denmark.
How the Danish value chain would work
Each partner brings one link of the chain. European Energy, a Copenhagen-based developer of renewable energy and Power-to-X projects, operates the e-methanol facility at Kassø in southern Denmark, which began operating in May 2025. The company describes Kassø as the world’s first large-scale e-methanol facility, with capacity of up to 42,000 tonnes of e-methanol a year.
Zurich-based Metafuels supplies the conversion step. Its aerobrew process turns renewable methanol into jet fuel, which the company says delivers up to 90% lower lifecycle emissions than fossil kerosene and is compatible with existing aircraft and airport infrastructure. Norwegian, a Nordic aviation group headquartered at Fornebu, Norway, with around 8,900 employees across the airlines Norwegian and Widerøe, provides the fuel demand.
In the showcase project, European Energy will supply e-methanol, Metafuels will convert it into synthetic aviation fuel at its aerobrew demonstration plant at the Paul Scherrer Institute (PSI) in Switzerland, and Norwegian will take the fuel for a flight. The release gives no date for that flight.
Saurabh Kapoor, Chief Executive Officer of Metafuels, described aerobrew as “the piece of the puzzle that turns green methanol into fuel an airline can actually fly on”. He said the partnership applies the company’s route from laboratory to operating plant in Switzerland, and that there is real airline appetite for methanol-to-jet fuel.
Where Metafuels’ plants stand
Turbe is hosted at the Evos Rotterdam terminal, with McDermott as engineering partner. According to the November 19 release, front end engineering and design (FEED) is “close to completion (end 2026)”, and the plant is due to be operational in 2030.
When the Port of Rotterdam announced the project on May 16, 2025, it said Turbe would initially produce 12,000 litres of e-SAF per day, with a second phase raising output tenfold to 120,000 litres per day. That release set FEED as the next step, followed by a final investment decision in mid-2026. The new release does not mention an investment decision. The Port of Rotterdam release also referred to Metafuels’ 2024 announcement of Pizol, a planned production facility in Denmark, which the new release does not mention.
The demonstration plant has its own history. PSI said on August 5, 2024, that a pilot plant to demonstrate aerobrew would be built on its campus, supported by the Swiss Federal Office of Energy’s pilot and demonstration programme and a funding contribution of 4.4 million Swiss francs. Metafuels’ website lists the opening of the aerobrew demonstration plant in an item dated August 20, 2026. AirPro News has also covered Metafuels’ synthetic fuel partnership with SWISS.
The policy asks behind the deal
The partners tie the project to the e-SAF sub-mandates that come into force from 2030 under ReFuelEU Aviation. The Port of Rotterdam’s 2025 release put the synthetic SAF sub-mandate at 1.2% from 2030, rising to 35% from 2050. The three companies call on Danish and EU policymakers to use EU Emissions Trading System (ETS) revenues and the Danish Air Passenger Duty to close the price gap between European-produced e-SAF and fossil jet fuel. Their joint asks are:
- a significant increase in SAF allowances in the current EU ETS revision, to cover the entire price gap for SAF blending mandates over the next decade;
- use of the entire revenue from the Danish Air Passenger Duty to green Danish aviation, aiming for domestic aviation to be 100% green by 2030 and supporting Danish production;
- the next green domestic route tender from 2028 to 2029, switching from biofuels to e-fuels and moving from demonstration flights to regular commercial operations.
Knut Olav Høeg, Chief IT and Business Services Officer at Norwegian, said the airline supports new SAF supply chains closer to fuel markets and said “clear financial incentives for early movers is needed”. He urged Danish politicians to channel aviation tax revenues back to the industry to cover the extra cost of SAF. René Alcaraz Frederiksen, EVP and Head of Power-to-X at European Energy, said “Denmark has the opportunity to develop strong leadership in this emerging industry”, and that Denmark needs to scale production alongside market-creating mandates, long-term commercial agreements and mechanisms that address the price difference between e-SAF and conventional jet fuel.
In the AirPro Atlas, Norwegian Air Shuttle (DY) lists Copenhagen Kastrup Airport (CPH) among its hubs, and the aircraft seen flying with it since October 21, 2026, are Boeing 737-800s and 737 MAX 8s.
-
Space & Satellites6 days agoNASA Targets November 18 Undocking for SpaceX CRS-35 Cargo Dragon
-
Route Development5 days agoPhoenix Sky Harbor Unveils Preferred West Terminal Concept
-
Space & Satellites6 days agoSierra Space Expands Victory Works Satellite Factory in Colorado
-
Company Performance7 days agoS&P Upgrades Aviation Capital Group to BBB After ITOCHU Deal Closes
-
Space & Satellites5 days agoESA Hera Returns First Close-Up Images of Didymos Asteroid System
