Connect with us

Space & Satellites

Space Nuclear Power Faces Logistical and Economic Barriers, DRACO Canceled

Experts say space nuclear power challenges are logistical and economic, not technical. DRACO canceled; focus shifts to nuclear reactors in space and on the Moon.

Published

on

This article summarizes reporting by Aerospace America.

For decades, the aerospace industry has recognized the immense potential of space nuclear power. Despite possessing the foundational technical knowledge since the 1960s, modern spacecraft continue to rely predominantly on chemical propulsion and solar arrays. A recent workshop at the May 2026 AIAA ASCEND event in Washington, D.C., sought to unpack this enduring paradox.

According to reporting by Aerospace America, a panel of aerospace and policy experts concluded that the primary barriers to deploying nuclear reactors in space are no longer technical. Instead, the industry is grappling with logistical, economic, and systemic hurdles that have repeatedly stalled progress.

The recent cancellation of the highly publicized Demonstration Rocket for Agile Cislunar Operations (DRACO) program in mid-2025 serves as a stark, real-world validation of these expert assessments, demonstrating how shifting economic landscapes can ground even the most ambitious nuclear initiatives.

The Illusion of Technical Barriers

During the ASCEND workshop, hosted by Brian Weeden of The Aerospace Corporation, panelists emphasized the extensive capital and time already invested in space nuclear research. Bhavya Lal, a professor at the RAND School of Public Policy, highlighted that the United States has spent 60 years and over $20 billion proving that the technology itself is viable.

“The technology has never been the bottleneck. What has failed each time is the system around the reactor,” Lal stated, according to the workshop coverage.

Lal further explained that these systemic failures include shifting mission scopes, a lack of political continuity, and unstable leadership architectures that prevent long-term projects from reaching the launch pad.

Stagnation Since the Space Race

The historical context of space nuclear power underscores the panel’s frustrations. During the Cold War, the U.S. heavily researched and successfully ground-tested nuclear thermal rockets through initiatives like the NERVA program. However, as reported by Aerospace America, these programs were ultimately scrapped due to changing political administrations and budget cuts following the Apollo era.

Tabitha Dodson, a program manager at the DARPA Defense Sciences Office, noted the resulting stagnation in the field during her panel remarks.

“The United States hasn’t really evolved our nuclear space technology since the fifties or sixties,” Dodson remarked at the event.

Dodson added that current research priorities have had to pivot toward radioisotope power systems and direct-energy power conversion systems to maintain momentum in a risk-averse funding environment.

Economic Realities and the DRACO Cancellation

The intersection of aerospace engineering and economic viability was brought into sharp focus with the recent fate of the DRACO program. Initiated in 2020 as a joint effort between DARPA, NASA, Lockheed Martin, and BWX Technologies, DRACO aimed to test a nuclear thermal rocket in orbit by 2027. Nuclear thermal propulsion was projected to be two to three times more efficient than chemical propulsion, potentially halving the travel time to Mars.

The Impact of Commercial Launch Costs

In June 2025, DARPA officially canceled the DRACO program. According to public statements from DARPA deputy director Rob McHenry, the decision was driven entirely by economics rather than technical failure.

The rapid decrease in commercial launch costs, largely propelled by the heavy-lift capabilities of companies like SpaceX, fundamentally altered the financial equation. The massive research and development costs required to perfect nuclear thermal propulsion could no longer be justified by a positive return on investment when chemical launches had become so inexpensive.

Current Mandates and the Path Forward

Despite the setbacks in nuclear propulsion, the push for nuclear power generation in space remains robust. Current executive mandates have established ambitious timelines, aiming for a functional nuclear reactor in space by 2028 and a working reactor on the lunar surface by 2030. These systems are considered critical for supporting long-term lunar habitats and deep-space exploration missions.

Balancing Ambition and Safety

Aaron Miles, Coordinator for Strategic Capabilities at the White House Office of Science and Technology Policy, discussed these targets at the ASCEND workshop. He emphasized the administration’s focus on setting goals that push the industry forward without ignoring logistical realities.

“Lunar surface reactor development efforts and in-space reactor efforts can benefit each other,” Miles noted regarding the dual mandates.

To meet these goals while navigating strict regulatory and safety hurdles, modern programs are utilizing High-Assay Low-Enriched Uranium (HALEU). Furthermore, contemporary reactor designs ensure that fission is only initiated once the system is safely in orbit, mitigating the historical public fears and international treaty complications associated with launching nuclear material.

AirPro News analysis

We observe that the pivot from nuclear propulsion (like the canceled DRACO program) to stationary nuclear surface power reflects a pragmatic maturation of the aerospace sector. While reusable chemical rockets have decisively won the current launch economics battle, sustained deep-space habitats and lunar bases will undeniably require the continuous, high-density energy that only nuclear reactors can provide. The looming 2028 and 2030 mandates will serve as a critical test of whether the U.S. government and its commercial partners can finally overcome the systemic inertia and political discontinuity described by the ASCEND panelists.

Frequently Asked Questions

What was the DRACO program?

The Demonstration Rocket for Agile Cislunar Operations (DRACO) was a joint U.S. government and industry program initiated in 2020 to develop and test a nuclear thermal rocket by 2027. It was canceled in June 2025 due to shifting economic priorities and the falling cost of commercial chemical rocket launches.

Why is nuclear power needed in space?

While solar panels and chemical batteries are sufficient for operations near Earth, deep-space exploration and permanent lunar or Martian habitats require reliable, high-density power sources that can operate continuously without sunlight or frequent resupply.

What is HALEU?

High-Assay Low-Enriched Uranium (HALEU) is a type of nuclear fuel that provides a balance between high energy output and safety, making it a preferred choice for modern space reactor designs to comply with international regulations and safety standards.

Sources

Photo Credit: Aerospace America

Continue Reading
Click to comment

Leave a Reply

Space & Satellites

Isar Aerospace Spectrum Rocket Reaches Orbit From Norway

Isar Aerospace’s Spectrum rocket became the first privately developed European launch vehicle to reach orbit on Sept. 5, 2026.

Published

on

German commercial space company Isar Aerospace successfully launched its Spectrum rocket into orbit from Andøya Spaceport in northern Norway on September 5, 2026, marking the first time a privately developed European launch vehicle has reached orbit.

In a press release issued following the launch, Isar Aerospace confirmed the two-stage rocket lifted off at 20:12 UTC and successfully deployed five commercial and educational CubeSats, along with one experimental payload, into Low Earth Orbit (LEO). The mission, designated “Onward and Upward,” establishes a critical new domestic launch capability for Europe following a period of restricted access to space.

Overcoming previous setbacks and securing funding

The successful flight follows the loss of the first Spectrum rocket during its maiden test flight on March 30, 2025. That mission, named “Going Full Spectrum,” failed approximately 30 seconds after liftoff due to an unintended vent valve opening that resulted in a loss of attitude control.

Following the 2025 anomaly, Isar Aerospace focused on vehicle modifications and scaling operations. In June 2026, the company closed a €270 million Series D funding round to drive global scaling and serial production of the Spectrum vehicle. The successful September 2026 Launch followed multiple scrubbed attempts earlier in the year due to valve issues, weather constraints, and range violations by unauthorized vessels.

European Space Agency support and payload details

The Space-Agencies (ESA) supported the mission through its Boost! program, which aims to foster commercial space transportation services in Europe. ESA Director General Josef Aschbacher praised the milestone in an official statement.

“A historic launch from Andøya Spaceport in Norway today, the first European Launcher Challenger to reach orbit… Spectrum quite literally rose to the challenge and delivered its payloads in low Earth orbit. An astounding achievement by German company Isar Aerospace, founded only eight years ago, and backed by the European Space Agency. This is yet another step towards a more diverse autonomous European launch service sector, and I am excited for what is still to come!”

The 28-meter-tall, 2-meter-diameter Spectrum rocket is powered by 10 engines and is designed to carry up to 1,000 kilograms to LEO. For this flight, the vehicle carried payloads from European universities and commercial entities, including:

  • CyBEEsat (TU Berlin)
  • TriSat-S (University of Maribor)
  • Platform 6 (EnduroSat)
  • FramSat-1 (NTNU)
  • SpaceTeamSat1 (TU Wien Space Team)
  • Let It Go experiment (Dcubed)

Strategic implications for European spaceflight

The launch from Andøya Spaceport represents the first successful orbital launch from Western European soil. Historically, European orbital launches have been conducted from the Guiana Space Centre in French Guiana or relied on international partners.

Géraldine Naja, ESA Director of Space Transportation, noted the shifting landscape in an official statement, stating that the European space transportation sector is undergoing an incredible transformation as new actors develop vehicles alongside traditional launchers.

AirPro News analysis

We view the success of the Spectrum rocket as a pivotal moment for the European aerospace sector. The continent has faced a well-documented capability gap following the retirement of the Ariane 5, delays in the Ariane 6 program, and the loss of access to Russian Soyuz vehicles. Isar Aerospace’s successful deployment of payloads demonstrates that Europe’s commercial space industry can deliver viable, autonomous access to Low Earth Orbit for small and medium payloads, reducing reliance on international launch providers.

Sources: Isar Aerospace

Photo Credit: Isar Aerospace

Continue Reading

Commercial Space

Dawn Aerospace Aurora Spaceplane to Support Astral Materials

Dawn Aerospace will conduct up to 100 microgravity flights for Astral Materials using the Aurora spaceplane from Oklahoma starting 2028.

Published

on

Astral Materials has selected Dawn Aerospace to conduct up to 100 microgravity test flights using the Aurora spaceplane to accelerate the development of next-generation semiconductor manufacturing hardware. The campaign, announced on September 1, 2026, will operate out of the Infinity One Oklahoma Spaceport in Burns Flat, Oklahoma.

In a press release issued on September 1, 2026, Dawn Aerospace detailed the agreement, which leverages the rapid reusability of the Aurora spaceplane to provide high-cadence microgravity testing. Astral Materials plans to use these flights to refine its microgravity furnace hardware. The system is designed to reduce gravity-driven defects, such as convection and sedimentation, during the growth of semiconductor crystals. These materials have potential applications in photonics, quantum computing, and high-power electronics.

Rapid iteration in suborbital flight

The Aurora spaceplane is designed to reach a top speed of Mach 3.7 and a maximum altitude of 100 kilometers, providing payloads with up to 127 seconds of microgravity per flight. According to the manufacturers, the vehicle supports a four-hour turnaround time between flights. This operational tempo allows researchers to conduct multiple tests within a single day.

Astral Materials Chief Technology Officer Jiya Janowitz highlighted the value of this cadence for hardware development, noting that payloads can be recovered in approximately 45 minutes.

“We can test an idea, recover it in around 45 minutes, make an adjustment on the ground and test it again later that same day. That kind of rapid iteration has never existed for microgravity manufacturing, and it fundamentally changes how quickly we can develop our technology.”

Astral Materials Chief Executive Officer Dr. Jessica Frick stated that the Aurora spaceplane provides a practical pathway to validate manufacturing systems before scaling to commercial production in orbit, where longer-duration microgravity is available.

Commercial operations and Oklahoma infrastructure

Commercial flight operations for the Astral Materials campaign are slated to begin in 2028 at the Infinity One Oklahoma Spaceport. The Oklahoma Space Industry Development Authority (OSIDA) welcomed the partnerships in an official social media statement on September 1, 2026, emphasizing the state’s focus on attracting high-cadence commercial spaceflight operations.

This agreement follows an April 16, 2026, announcement in which Dawn Aerospace and OSIDA launched the Suborbital Spaceplane Challenge. That initiative offered United States researchers up to 25 flights aboard the Aurora spaceplane to stimulate utilization of the Oklahoma facility.

Dawn Aerospace Chief Executive Officer Stefan Powell noted that routine access is required to transition microgravity manufacturing from a scientific curiosity to a viable industry, comparing the need for rapid experimentation to previous industrial revolutions.

AirPro News analysis

The partnership between Dawn Aerospace and Astral Materials highlights a critical gap in the current space manufacturing ecosystem. While orbital platforms like the International Space Station offer long-duration microgravity, the cost and lead times associated with orbital launches prohibit the rapid trial-and-error necessary for hardware development. Suborbital spaceplanes like Aurora serve as an essential stepping stone. By providing brief but frequent periods of microgravity, these vehicles allow companies to validate complex systems before committing to expensive orbital deployments.

We note a minor discrepancy in Dawn Aerospace’s published materials regarding the commencement of operations at the Oklahoma site. The main announcement targets 2028 for commercial flights, while the company’s boilerplate text references 2027. Regardless of the exact start date, establishing a reliable suborbital testbed will be vital for the commercial viability of in-space manufacturing applications.

Sources: Dawn Aerospace

Photo Credit: Dawn Aerospace

Continue Reading

Space & Satellites

NASA X-59 Completes 25th Flight, Enters Acoustic Validation

NASA’s X-59 quiet supersonic aircraft finished initial envelope expansion and moves to acoustic validation for the Quesst mission.

Published

on

The National Aeronautics and Space Administration (NASA) X-59 quiet supersonic experimental aircraft completed its 25th test flights on August 21, 2026, validating aerodynamic models and clearing the way for the program’s critical acoustic validation phase.

In a press release issued on September 4, 2026, the agency confirmed the milestone marks the conclusion of initial envelope expansion for the centerpiece of the Quesst mission. The X-59 is designed to cruise faster than the speed of sound while producing a muted sonic thump rather than a disruptive sonic boom. Data collected during the upcoming flight phases will be shared with U.S. and international regulators to inform new noise thresholds, which could eventually lead to the lifting of the ban on commercial supersonic flight over land.

Flight envelope expansion and performance

During the 72-minute test flight originating from NASA’s Armstrong Flight Research Center in Edwards, California, the X-59 reached a speed of Mach 1.2 and an altitude of 49,000 feet. The flight followed a rapid envelope expansion campaign over the summer. The aircraft achieved its first supersonic flight on June 5, 2026, and reached its target cruise conditions of Mach 1.4 (924 mph) and 55,000 feet on June 12, 2026.

NASA Test Pilot Nils Larson described the test flights as “exciting but uneventful,” noting that the aircraft “likes to fly fast.”

The initial 25 flights focused on proving the airworthiness and baseline performance of the unique airframe, which was built by prime contractor Lockheed Martin and powered by a General Electric GE-F414 engine.

“Through our ongoing flight tests with the X-59, we’ve gained invaluable insights into both the aircraft’s performance and the unique challenges of the aircraft design,” said Cathy Bahm, Project Manager for the NASA Low Boom Flight Demonstrator project. “Each test point has validated our models and predictions, and it has strengthened our confidence in the aircraft’s performance.”

Transitioning to acoustic validation

With baseline performance established, the Quesst mission will now shift focus to measuring the sound produced by the aircraft. During the acoustic validation phase scheduled for later this year, NASA will utilize ground- and air-based tools to measure the sonic thumps generated by the X-59 at supersonic cruise speeds.

The objective is to verify that the physical aircraft meets the low-boom design targets established by computer modeling.

“This is the phase we’ve been working toward,” said Larry Cliatt, Acoustic Validation Technical Lead for the NASA Quesst mission. “Building and flying a brand-new aircraft is an extraordinary accomplishment, but the next phase is where the real research begins.”

Cliatt noted that the acoustic validation campaign will be complex and demanding. The tools and methods used to design the X-59 will be put to the test, potentially forming the foundation for future commercial supersonic aircraft development.

AirPro News analysis

The successful completion of the X-59’s initial flight test phase marks a pivotal transition for the Quesst mission. We view the upcoming acoustic validation phase as the true test of the program’s value to the broader aerospace industry. While building a supersonic demonstrator is a significant engineering feat, the X-59 is fundamentally a data-gathering tool. If the acoustic measurements match NASA’s models, the agency will possess the empirical evidence required by the Federal Aviation Administration (FAA) and the International Civil Aviation Organization (ICAO) to establish noise-based certification standards. Establishing these standards is the mandatory first step toward opening overland routes to a new generation of commercial supersonic aircraft.

Sources: NASA Quesst Blog

Photo Credit: NASA

Continue Reading
Every coffee directly supports the work behind the headlines.

Support AirPro News!

Advertisement

Follow Us

newsletter

Latest

Categories

Tags

Every coffee directly supports the work behind the headlines.

Support AirPro News!

Popular News