Connect with us

Defense & Military

US Army Orders Nine More Boeing CH47F Block II Chinooks

The US Army doubles its CH-47F Block II Chinook order with nine new helicopters, enhancing payload, range, and avionics for modern heavy-lift missions.

Published

on

U.S. Army Doubles Down on Heavy-Lift Modernization with New Chinook Order

The U.S. Army is pushing forward with a significant upgrade to its heavy-lift helicopter fleet, placing a fresh order for nine of Boeing‘s next-generation CH-47F Block II Chinooks. Announced on October 21, 2025, the deal, structured across two contracts for production Lots 4 and 5, is valued at $461 million. This move signals a clear commitment to the Chinook platform as the backbone of the Army’s vertical lift capability for the foreseeable future, ensuring that the iconic tandem-rotor helicopter remains relevant in an increasingly complex global landscape.

This latest procurement doubles the Army’s total order of Block II Chinooks to 18 aircraft, building on a modernization program designed to enhance payload, range, and overall performance. The decision follows a “Rapid Fielding” production strategy, aimed at getting these advanced military aircraft into the hands of soldiers more quickly. With six production models already delivered and undergoing rigorous operational evaluations, the Army is actively validating the capabilities that the Block II variant brings to the field. This methodical approach underscores the importance of ensuring the new Chinooks meet the demanding requirements of modern multi-domain operations.

The CH-47 Chinook has been an indispensable asset for the U.S. Army since its introduction in the 1960s, serving in every major conflict and countless humanitarian missions. The Block II program represents the most substantial evolution in the helicopter’s storied history. It’s not just about keeping an old airframe flying; it’s a comprehensive modernization effort designed to prepare the fleet for the challenges of the next 40 years. By integrating new technologies with a proven design, the Army aims to create a more capable and sustainable heavy-lift force.

Enhanced Capabilities for the Modern Battlefield

The core of the CH-47F Block II upgrade is a series of significant performance enhancements. The new variant boasts a strengthened airframe and an improved drivetrain, which together increase its maximum gross weight by 4,000 pounds, bringing the total to 54,000 pounds. This increased lift capacity is a game-changer, enabling the Chinook to transport heavier equipment, such as the Joint Light Tactical Vehicle (JLTV), which the older Block I models could not carry. This capability is crucial for logistical operations in contested environments where speed and efficiency are paramount.

Beyond just lifting more, the Block II can fly farther. Boeing redesigned the fuel system, replacing the previous six-tank configuration with two larger, more efficient tanks. This change increases the helicopter’s fuel capacity and extends its mission radius, allowing it to deliver troops and supplies to more distant and austere locations without refueling. Combined with advanced composite rotor blades that feature a swept-tip design for better lift and efficiency, the Block II is a more capable and versatile platform for a wide range of missions.

Inside the cockpit, the aircraft is equipped with the Common Avionics Architecture System (CAAS), a fully integrated, digital cockpit management system that enhances crew situational awareness. This modern avionics suite, coupled with the helicopter’s raw power, capable of reaching speeds of 170 knots (315 km/h) and altitudes up to 20,000 feet, makes the CH-47F Block II a formidable asset. It can carry up to 55 troops or over 22,000 pounds of cargo, ensuring it can meet the diverse demands of the modern battlefield.

“The rapid succession of contracts indicates that the Chinook will continue to play an important role in the U.S. Army’s family-of-systems, particularly in a contested logistics environment.” – Heather McBryan, Vice President and Program Manager, Cargo Programs, for Boeing Defense, Space and Security

A Strategic Imperative for Future Conflicts

The Army’s investment in the Block II program is a direct response to the evolving nature of warfare. The focus on “contested logistics” highlights the need for aircraft that can operate effectively in environments where air superiority is not guaranteed. The Chinook’s ability to move large amounts of personnel and equipment quickly and efficiently is a critical enabler for the Army’s strategic responsiveness across the full spectrum of operations. The modernization effort is not just about upgrading a helicopter; it’s about future-proofing the Army’s heavy-lift capability.

The long-term vision for the program is to upgrade the Army’s entire fleet of over 465 Chinooks to the Block II standard. This ambitious goal reflects the platform’s central role in the Army’s aviation strategy. The program also employs a cost-effective induction process, where reusable parts from Block I Chinooks are integrated with new Block II technologies. This approach saves both time and money, allowing for a more efficient and sustainable modernization process. The design of the Block II also allows for more affordable technology insertions in the future, ensuring the platform can adapt to new threats and requirements as they emerge.

Advertisement

The program’s significance extends beyond the U.S. military. The CH-47F Block II has also attracted interest from international partners, with orders from the United Kingdom and Germany. This international adoption enhances interoperability among allied forces and strengthens the global defense industrial base. As Boeing and the Army are already in discussions for a potential Lot 6 procurement, the production line for this advanced helicopter is set to remain active for years to come, solidifying the Chinook’s status as the premier heavy-lift helicopter for Western militaries.

Conclusion: A Legacy Reimagined

The U.S. Army’s latest order for nine CH-47F Block II Chinooks is a clear and decisive step in its ongoing effort to modernize its aviation fleet. This $461 million investment reinforces the enduring value of the Chinook platform while equipping it with the capabilities needed to meet the challenges of the 21st-century battlefield. With increased payload, extended range, and advanced avionics, the Block II is more than just an upgrade; it is a reimagining of what a heavy-lift helicopter can do. The program ensures that soldiers will have the vertical lift support they need to operate and win in complex and contested environments around the globe.

Looking ahead, the CH-47F Block II is poised to remain the cornerstone of U.S. Army and allied heavy-lift operations for decades. The commitment to potentially upgrade the entire fleet, combined with international interest, secures the Chinook’s production and development path. As the six initial aircraft continue their operational evaluations, the real-world feedback from soldiers will further refine the platform, ensuring it is perfectly tuned to the needs of the warfighter. The legacy of the Chinook, which began over 60 years ago, is not only being preserved but is being actively forged anew for a new era of military operations.

FAQ

Question: What is the total value of the new contract for the CH-47F Block II Chinooks?
Answer: The U.S. Army awarded Boeing two contracts for Lots 4 and 5, with a combined value of $461 million for nine helicopters.

Question: How many Block II Chinooks does the U.S. Army now have on order?
Answer: This new order for nine helicopters brings the total number of CH-47F Block II aircraft under contract with the U.S. Army to 18.

Question: What are the main improvements of the Block II variant over the previous model?
Answer: The Block II features a strengthened airframe and an improved drivetrain, increasing payload capacity by 4,000 pounds. It also has a redesigned fuel system for extended range and advanced composite rotor blades for better performance.

Sources: boeing.mediaroom.com

Photo Credit: Boeing

Advertisement
Continue Reading
Advertisement
Click to comment

Leave a Reply

Defense & Military

Lockheed Martin and Microsoft Launch Sanctum Cloud-Based Drone Defense

Sanctum combines Lockheed Martin’s defense tech with Microsoft Azure AI to detect and neutralize drone threats rapidly using multi-sensor fusion and effector-agnostic systems.

Published

on

This article is based on an official press release from Lockheed Martin and Microsoft.

Lockheed Martin and Microsoft Unveil “Sanctum”: A Cloud-Native Defense Against Drones Swarms

On December 10, 2025, defense prime Lockheed Martin and technology giant Microsoft announced a strategic collaboration to launch “Sanctum,” a next-generation counter-unmanned aerial system (C-UAS). The new platform integrates Lockheed Martin’s established military command-and-control capabilities with Microsoft’s Azure cloud and artificial intelligence technologies.

According to the joint announcement, Sanctum is designed to address the rapidly evolving threat landscape where cheap, autonomous drones and complex swarms often outpace traditional defense procurement cycles. By leveraging a hybrid cloud and edge architecture, the system aims to detect, track, and neutralize threats ranging from single hobbyist drones to coordinated autonomous attacks.

The “Sanctum” Architecture

Sanctum represents a shift from hardware-centric defense to an open-architecture software ecosystem. The system utilizes a “digital backbone” built on Microsoft Azure, incorporating services such as Azure IoT Hub for device telemetry, Azure Synapse for analytics, and Azure AI Foundry for model management.

The companies state that this infrastructure allows for multi-sensor fusion, ingesting data from Radio Frequency (RF) sensors, Electro-Optical/Infrared (EO/IR) cameras, and radars to generate a unified picture of the airspace. A key differentiator highlighted in the press release is the speed of adaptation. While traditional systems may require months for upgrades, Sanctum is designed to allow for AI model retraining in the cloud.

“By co-developing Sanctum with Lockheed Martin on Azure, we’re bringing cloud and AI together from headquarters to the tactical edge.”

, John Shewchuk, CVP at Microsoft

If a new drone threat signature is identified, data can be transmitted to the cloud where the model is retrained. The update is then pushed back to the tactical edge in minutes or hours, rather than weeks or months.

Effector-Agnostic Capabilities

Lockheed Martin describes Sanctum as “effector-agnostic,” meaning it can coordinate various defensive measures depending on the specific threat profile. The system is built to manage a layered defense that includes:

Advertisement
  • Kinetic Interceptors: Traditional missiles or defensive drones.
  • Electronic Warfare: Jammers designed to sever control links.
  • Directed Energy: High-energy laser systems.

The announcement confirmed a key integration with IPG Photonics’ CROSSBOW, a high-energy laser system. Sanctum has reportedly been demonstrated controlling this laser to neutralize drone threats, validating its ability to manage directed energy weapons alongside traditional kinetic effectors.

Strategic Context and Market Impact

The collaboration addresses a critical economic and tactical gap in modern air defense: the asymmetry between inexpensive offensive drones and costly defensive missiles. Paul Lemmo, Vice President at Lockheed Martin, emphasized the necessity of this technological convergence.

“Collaborating with Microsoft brings the best of defense and digital innovation… giving our customers a decisive edge against evolving drone threats.”

, Paul Lemmo, VP at Lockheed Martin

The system also supports Lockheed’s existing sensor portfolio, including the Q-53 Multi-Mission Radar, while maintaining interoperability with third-party sensors. This “single pane of glass” approach aims to reduce the cognitive load on operators who previously had to monitor multiple screens for different detection systems.

AirPro News Analysis

The Shift to Software-Defined Defense

The launch of Sanctum signals a definitive response from traditional defense primes to the rise of “software-first” defense startups. Companies like Anduril Industries have gained significant market traction with their Lattice OS, which similarly promises an open, hardware-agnostic operating system for defense.

By partnering with Microsoft, Lockheed Martin is effectively outsourcing the cloud infrastructure layer to a commercial tech giant, allowing it to focus on its core competency: weapons integration and military logistics. This move acknowledges that in the era of AI warfare, the speed of software updates is as critical as the range of a missile.

Furthermore, the industry landscape is becoming increasingly complex. While Lockheed Martin competes with Anduril’s software solutions, they also partner with them on hardware integrations, such as linking the Q-53 radar with Lattice. This “frenemy” dynamic suggests that the future of air defense will rely on modular, interoperable ecosystems rather than closed, proprietary stacks.

Frequently Asked Questions

What is the primary function of Sanctum?
Sanctum is a command-and-control software platform that detects, identifies, and neutralizes drone threats by coordinating sensors and weapons systems through a cloud-based interface.

Advertisement

How does Sanctum differ from traditional air defense?
Unlike static hardware systems, Sanctum uses AI and cloud connectivity to retrain its threat detection models in near real-time, allowing it to adapt to new drone tactics in hours rather than months.

What weapons does Sanctum control?
It is effector-agnostic, capable of controlling kinetic interceptors, electronic jammers, and directed energy weapons like the IPG Photonics CROSSBOW laser.

Sources

Photo Credit: Lockheed Martin

Continue Reading

Defense & Military

France Confirms Next-Generation Nuclear Aircraft Carrier Program

France will build the PANG, a new nuclear-powered aircraft carrier to replace Charles de Gaulle by 2038, featuring EMALS and advanced fighters.

Published

on

This article summarizes reporting by Reuters.

France Confirms Launch of Next-Generation Nuclear Aircraft Carrier Program

French President Emmanuel Macron has officially confirmed that France will proceed with the construction of a new nuclear-powered aircraft carrier, intended to replace the aging Charles de Gaulle by 2038. Speaking to French troops stationed in Abu Dhabi on Sunday, December 21, Macron outlined the decision as a critical step in maintaining France’s status as a global maritime power.

According to reporting by Reuters, the President emphasized the necessity of naval strength in an increasingly volatile world. The announcement, made from a strategic military base in the United Arab Emirates, underscores Paris’s commitment to projecting power beyond Europe, particularly into the Indo-Pacific region.

The new vessel, known as the Porte-Avions de Nouvelle Génération (PANG), represents a significant technological and industrial undertaking. It aims to ensure France remains the only European Union nation capable of deploying a nuclear carrier strike group, a capability central to Macron’s vision of European “strategic autonomy.”

A New Giant of the Seas

The PANG program calls for a vessel that will significantly outclass its predecessor in size, power, and capability. While the Charles de Gaulle displaces approximately 42,500 tonnes, defense reports indicate the new carrier will be the largest warship ever built in Europe.

Technical Specifications and Capabilities

Based on technical data cited by naval analysts and French media, the new carrier is expected to displace between 75,000 and 80,000 tonnes and measure over 300 meters in length. It will be powered by two K22 nuclear reactors, providing nearly double the power output of the current fleet’s propulsion systems.

A key feature of the new design is the integration of the Electromagnetic Aircraft Launch System (EMALS), technology currently used by the U.S. Navy’s Gerald R. Ford-class carriers. This system replaces traditional steam catapults, allowing for the launch of heavier Military-Aircraft and Drones while reducing mechanical stress on the airframes.

The air wing is expected to include:

Advertisement
  • Rafale M fighters: The current backbone of French naval aviation.
  • Future Combat Air System (FCAS): A sixth-generation fighter currently in development with Germany and Spain.
  • Advanced Drones and E-2D Hawkeyes: For surveillance and strike support.

“The decision to launch this vast programme was taken this week,” Macron told troops, highlighting the strategic urgency of the project.

Strategic Context and Geopolitical Signals

The choice of Abu Dhabi for this major announcement was likely calculated. The UAE hosts a permanent French naval base, serving as a logistical hub for operations in the Indian Ocean and the Persian Gulf. By unveiling the PANG program here, Paris is signaling its intent to protect its extensive Exclusive Economic Zone (EEZ) in the Indo-Pacific and counter growing naval competition in the region.

Budgetary and Political Headwinds

The ambitious project comes at a time of significant domestic financial strain. Reports estimate the program’s cost will exceed €10 billion ($10.5 billion). With France facing a projected public deficit of over 6% of GDP in 2025 and a minority government navigating a hung parliament, the allocation of such vast funds has drawn criticism from opposition parties.

Critics argue the funds could be better utilized for social services or debt reduction. However, supporters and industry stakeholders note that the project will sustain thousands of jobs at major defense contractors like Naval Group and Chantiers de l’Atlantique, as well as hundreds of smaller suppliers.

AirPro News Analysis

The Paradox of Autonomy: While President Macron champions “strategic autonomy,” the ability for Europe to act independently of the United States, the PANG program reveals the practical limits of this doctrine. By adopting the U.S.-designed EMALS catapult system, the French Navy ensures interoperability with American supercarriers but also cements a long-term technological dependence on U.S. suppliers. This decision suggests that while France seeks political independence, it recognizes that high-end naval warfare requires deep technical integration with its NATO allies.

Frequently Asked Questions

When will the new carrier enter service?
Construction is slated to begin around 2031, with sea trials expected in 2036. The vessel is scheduled to be fully commissioned by 2038, coinciding with the retirement of the Charles de Gaulle.

Why is France choosing nuclear Propulsion?
Nuclear propulsion offers unlimited range and the ability to sustain high speeds for long durations without refueling. It also allows the ship to generate the massive amounts of electricity required for next-generation sensors and electromagnetic catapults.

How much will the project cost?
Current estimates place the cost at over €10 billion ($10.5 billion), though complex defense programs often see costs rise during development.

Will other European nations use this carrier?
While the carrier is a French national asset, it is designed to support European security. However, it will primarily host French naval aviation, with potential for interoperability with U.S. and allied aircraft.

Advertisement

Sources: Reuters

Photo Credit: U.S. Navy photo by Mass Communication Specialist 3rd Class Bela Chambers

Continue Reading

Defense & Military

Firehawk Aerospace Expands Rocket Motor Production in Mississippi Facility

Firehawk Aerospace acquires a DCMA-rated facility in Mississippi to boost production of solid rocket motors using 3D-printing technology.

Published

on

This article is based on an official press release from Firehawk Aerospace.

Firehawk Aerospace Acquires Mississippi Facility to Scale Rocket Motor Production

On December 19, 2025, Firehawk Aerospace announced a significant expansion of its manufacturing capabilities with the acquisition of a specialized defense facility in Crawford, Mississippi. The Dallas-based defense technology company has secured a 20-year lease on the 636-acre site, which was formerly operated by Nammo Talley.

This acquisition marks a strategic pivot for Firehawk as it moves to address critical shortages in the U.S. defense supply chain. By taking over a facility that is already rated by the Defense Contract Management Agency (DCMA), the company aims to bypass the lengthy construction and certification timelines typically associated with greenfield defense projects. The site will serve as a hub for the full-system integration of solid rocket motors (SRMs), complementing the company’s existing R&D operations in Texas and energetics production in Oklahoma.

Strategic Asset Details

The Crawford facility is located in Lowndes County within Mississippi’s “Golden Triangle” region. According to the company’s announcement, the site is a “turnkey” defense asset designed specifically for handling high-grade explosives and munitions. The infrastructure includes assembly bays protected by one-foot-thick concrete walls and safety “blowout” walls designed to contain accidental detonations.

Because the facility was previously used by Nammo Defense Systems for the high-volume assembly of shoulder-launched munitions, such as the M72 LAW and SMAW systems, it retains the necessary regulatory certifications to allow for rapid operational ramp-up. Firehawk Aerospace CEO Will Edwards emphasized the urgency of this expansion in a statement regarding the deal.

“This acquisition strengthens Firehawk’s ability to address one of the nation’s most urgent defense challenges: rebuilding munition inventories that have been drawn down faster than they can be replaced.”

, Will Edwards, Co-founder and CEO of Firehawk Aerospace

Addressing the “Rocket Motor Crisis”

The acquisition comes at a time when the Western defense industrial base is grappling with a severe shortage of solid rocket motors, which power critical systems like the Javelin, Stinger, and GMLRS missiles. Traditional manufacturing methods, which involve casting propellant in large batches that take weeks to cure, have created production bottlenecks.

Firehawk Aerospace intends to disrupt this model by utilizing proprietary 3D-printing technology to manufacture propellant grains. According to the press release, this additive manufacturing approach reduces production times from weeks to hours. The company has explicitly stated that the new Mississippi facility is being designed to achieve a production tempo of “thousands of rockets per month,” a significant increase over legacy industry standards.

Advertisement

“While the current industrial base is built to produce thousands of rockets per year, we are building this site… to operate at a much higher production tempo… designing for throughput measured in thousands per month, not years.”

, Will Edwards, CEO

Regional Economic Impact

The expansion is expected to bring skilled jobs to the Golden Triangle region, which is increasingly becoming a hub for aerospace and defense activity. Mississippi Governor Tate Reeves welcomed the investments, noting the dual benefits of economic growth and national security support.

“Their acquisition in Crawford will bring skilled jobs to the region while directly contributing to the production capacity our nation needs.”

, Tate Reeves, Governor of Mississippi

AirPro News Analysis

From R&D to Mass Production: This acquisition signals Firehawk’s transition from a development-focused startup to a volume manufacturer. By securing a pre-rated facility, Firehawk has effectively shaved 2–3 years off its timeline, the period typically required to build and certify a new explosives handling site. This speed is critical given the current geopolitical demand for tactical munitions.

Supply Chain Decentralization: The move also highlights a strategy of decentralization. By distributing operations across Texas (R&D), Oklahoma (Energetics), and now Mississippi (Integration), Firehawk is building a supply chain that may prove more resilient than centralized legacy models. This geographic diversity also allows the company to tap into distinct labor markets and state-level incentives, such as Mississippi’s aerospace initiatives.

Frequently Asked Questions

What is the significance of the DCMA rating?
A DCMA (Defense Contract Management Agency) rating verifies that a facility meets strict Department of Defense quality and safety standards. Acquiring a pre-rated facility allows Firehawk to begin production much faster than if they had to build and certify a new site from scratch.

How does Firehawk’s technology differ from traditional methods?
Traditional solid rocket motors are cast in large batches, a process that requires weeks for the propellant to cure. Firehawk uses 3D-printing technology to print propellant grains, which allows for custom geometries and reduces the manufacturing time to mere hours.

What was the facility used for previously?
The facility was formerly operated by Nammo Talley (now Nammo Defense Systems) for the assembly of shoulder-launched munitions, including the M72 LAW and SMAW systems.

Advertisement

Sources

Photo Credit: Firehawk Aerospace

Continue Reading
Advertisement

Follow Us

newsletter

Latest

Categories

Tags

Popular News