Defense & Military
Austria Acquires 12 Leonardo M-346 F Block 20 Aircraft for Air Training
Austria signs a €1.5 billion contract with Leonardo for 12 M-346 F Block 20 jets to restore pilot training and enhance air policing capabilities.

This article is based on an official press release from Leonardo and additional contract details released by the Austrian Ministry of Defence.
Austria Selects Leonardo M-346 F Block 20 to Restore Air Training Sovereignty
The Austrian Ministry of Defence has officially signed a government-to-government (G2G) agreement with Italy for the acquisition of 12 Leonardo M-346 F Block 20 Military-Aircraft. The deal, finalized on December 17, 2025, marks a significant modernization effort for the Austrian Air Force (Luftstreitkräfte), aiming to fill the capability gap left by the retirement of the Saab 105 fleet in 2020.
According to the official press release from Leonardo, the Contracts was signed by the Italian Directorate of Aeronautical Armaments and Airworthiness on behalf of Austria. The agreement encompasses not only the aircraft but a comprehensive support package designed to restore Austria’s ability to train pilots domestically.
Stefano Bortoli, Managing Director of Leonardo’s Aircraft Division, highlighted the significance of the deal in a company statement:
“We’re extremely proud of the launch of Austria’s M-346 programme… This programme confirms the international competitiveness of the M-346 system. It responds to the need for operational versatility dictated by today’s scenarios.”
Contract Scope and Delivery Timeline
The acquisition is valued at approximately €1.5 billion, a figure that includes the 12 aircraft, a Ground-Based Training System (GBTS), full-mission simulators, and a six-year logistics and maintenance support package. Deliveries of the new fleet are scheduled to begin in 2028, with the aircraft to be stationed at Linz-Hörsching Air Base.
This procurement is critical for Austria’s “Two-Fleet Strategy.” Since retiring the Saab 105, the Austrian Air Force has relied solely on the Eurofighter Typhoon for air policing, a high-cost solution for lower-intensity missions. Furthermore, Austrian pilots have been forced to train abroad in Italy and Germany. This contract aims to repatriate 100% of pilot Training to Austria.
Austrian Defence Minister Klaudia Tanner emphasized the strategic importance of the acquisition:
“With the purchase of these jets, we are closing a significant capability gap in our air force. This not only brings 100% of our pilot training back to Austria, but also significantly strengthens air defence.”
Technical Specifications: The “Block 20” Standard
Austria will serve as the lead customer for the M-346 F “Block 20” standard. While the M-346 is widely known as an advanced jet trainer, the “F” (Fighter) variant transforms the platform into a capable light combat aircraft. The Block 20 configuration introduces significant Avionics and sensor upgrades comparable to frontline fighters.
Advanced Avionics and Connectivity
According to technical specifications released regarding the deal, the Block 20 variant replaces traditional multi-function displays with a Large Area Display (LAD), a single wide touchscreen interface similar to that found in the F-35. The cockpit also features a Helmet Mounted Display (HMD) system and advanced voice command capabilities to reduce pilot workload.
Combat Capabilities
The aircraft will be equipped with an Active Electronically Scanned Array (AESA) Radar-Systems, providing superior target detection compared to mechanical radars. For interoperability with NATO partners, the jets will feature Link 16 tactical data links. In terms of armament, the fleet will be integrated with IRIS-T infrared-guided missiles, laser-guided bombs, and a 20mm cannon pod, allowing the M-346 to handle air policing duties against slow-moving targets and border patrol missions.
AirPro News Analysis
The selection of the M-346 F allows Austria to implement a “High/Low Mix” strategy. By offloading training and low-intensity intercept missions to the M-346, which costs roughly €10,000 per flight hour to operate, the Air Force can preserve the airframe life of its Eurofighter Typhoons, which are significantly more expensive to fly. This approach mirrors strategies used by other European air forces to balance operational readiness with budget constraints.
Industrial Cooperation and Economic Impact
A central component of the G2G agreement is a parallel industrial cooperation deal intended to boost the Austrian economy. Austrian Economy Minister Wolfgang Hattmannsdorfer stated that the agreement ensures tax revenue flows back into domestic value creation.
“With the cooperation, an investment volume of around 400 million euros returns to Austria. This strengthens industry, enables new research projects and secures jobs.”
The cooperation focuses on aerospace engineering, digitalization, and maintenance, ensuring that local Austrian companies are integrated into the supply chain for the aircraft’s sustainment.
Frequently Asked Questions
Why did Austria choose the M-346?
The M-346 fills a specific gap left by the Saab 105. It serves as both an advanced trainer and a light fighter, allowing Austria to train pilots domestically and conduct cost-effective air policing missions.
When will the aircraft arrive?
Deliveries are scheduled to commence in 2028.
Does this replace the Eurofighter?
No. The M-346 complements the Eurofighter as part of a “Two-Fleet Strategy.” The Eurofighter remains the primary platform for high-intensity supersonic interception, while the M-346 handles training and lower-intensity tasks.
What is the “Block 20” upgrade?
Block 20 is the latest standard for the M-346, featuring an AESA radar, Large Area Display cockpit, Helmet Mounted Display, and compatibility with modern weapons like the IRIS-T missile.
Sources
- Leonardo Press Release
- Austrian Ministry of Defence
Photo Credit: Leonardo
Defense & Military
Gripen F Completes Inaugural Flight in Linköping Sweden
Saab and the Brazilian Air Force completed the first flight of the Gripen F two-seat fighter on August 28, 2026.

Saab and the Brazilian Air Force have successfully completed the inaugural flight of the Gripen F, the two-seat variant of the Gripen E fighter, initiating the airborne test campaign for the jointly developed aircraft.
The aircraft took off from Saab’s airfield in Linköping, Sweden, on August 28, 2026. In a press release issued today, the manufacturer confirmed the milestone advances a comprehensive technology transfer program designed to deliver both pilot training and full operational combat capabilities.
Inaugural flight and test campaign
The flight commenced at 09:40 local time and lasted 40 minutes. Saab Chief Test Pilot Jakob Högberg and Brazilian Air Force Test Pilot Lieutenant Colonel Aviator Abdon de Rezende Vasconcelos operated the aircraft.
Lars Tossman, Head of Business Area Aeronautics at Saab, highlighted the collaborative effort behind the milestone.
“This first flight represents an important step forward for both Saab and the Brazilian Air Force. Seeing Gripen F take to the skies is particularly significant for all the Swedish and Brazilian teams whose years of engineering work have helped turn this aircraft into a reality. It is designed to accelerate pilot training while and enhancing operational performance in advanced combat missions,” Tossman said.
The Gripen F test program will now transition into a progressive envelope expansion phase. Saab stated that upcoming flights will clear performance limits, including speed, altitude, G-load, and angle of attack, while evaluating the tactical systems of the independent rear cockpit.
Design specifications and Brazilian procurement
The Gripen F incorporates specific design modifications to accommodate a second crew member. According to Air Data News, the two-seat variant measures 15.9 meters in length, compared to the 15.2-meter single-seat Gripen E, and has a maximum takeoff weight of 16,500 kilograms. To make room for the rear cockpit, engineers omitted the internal 27 mm Mauser BK27 cannon found on the single-seat model. Despite this change, the aircraft retains full operational combat capability and utilizes the same General Electric F414G engine.
The development of the Gripen F is heavily tied to Brazilian defense procurement. Aviation Week reports that the Brazilian Air Force ordered eight Gripen F aircraft as part of a broader 36-aircraft contract signed in 2014. Saab officially presented the first Gripen F during a rollout ceremony in Linköping on June 2, 2026. The manufacturer noted that more than 350 Brazilian engineers, technicians, and pilots have participated in training and development activities for the program.
AirPro News analysis
We view the successful first flight of the Gripen F as a critical validation of the technology transfer agreement between Saab and its Brazilian partners, including Embraer. The integration of a fully combat-capable rear cockpit ensures the Brazilian Air Force can conduct advanced training while maintaining frontline fleet readiness. Delivering the two-seat variant on schedule strengthens Saab’s position in future export campaigns where dual-role trainer and combat aircraft are required.
Sources: Saab
Photo Credit: Saab
Defense & Military
Neura Defense Systems Rebrands as Volantyx Aerospace
Neura Defense Systems rebrands as Volantyx Aerospace to develop counter-UAS tech targeting RF-silent drone swarms.

Saint Petersburg, Florida-based Neura Defense Systems, Inc. announced on August 26, 2026, that it has rebranded as Volantyx Aerospace, Inc. to reflect its expansion from a single-product defense developer into a broader aerospace technology platform.
In a press release issued Wednesday, the company stated the original Neura Defense Systems name will be retained for its defense division and current operating business. The corporate restructuring aligns with the company’s focus on developing a distributed edge-intelligence architecture designed to counter autonomous, radio-frequency-silent drone swarms.
Addressing the RF-silent swarm-drone gap
Volantyx Aerospace is targeting a specific vulnerability in current counter-Unmanned Aircraft Systems (UAS) defense networks. Traditional detection and mitigation rely heavily on radio frequency (RF) signals, which are ineffective against pre-programmed or autonomous aircraft that do not emit such signals.
Founder and Chief Executive Officer Sam Talari explained the limitations of legacy systems in the company’s announcement, noting that the new architecture is built on the assumption that any single sensor can be degraded or absent.
An RF sensor cannot detect a signal that is not there, and a jammer cannot sever a control link that does not exist. We start from the aircraft’s physical signature instead — radar return, sound, heat, visual — and combine those into one track and one decision picture for the operator.
The company has filed 13 United States provisional patent applications covering multi-modal sensor fusion, distributed networking, cognitive command, and the detection of non-emitting aircraft. The resulting intelligence layer is designed to make decisions at the edge without cloud dependency while preserving a record of system observations.
Development timeline and market positioning
The rebranding occurs as federal investment in counter-UAS technologies accelerates. Volantyx Aerospace remains in the development stage, with its core capabilities currently undergoing hardware integration and field evaluation following initial tests in a controlled environment.
The company clarified in its release that it does not yet claim a fielded deployment, operational performance metrics, or a contract award. Volantyx Aerospace plans to begin manufacturing or supplying effectors in early 2027. The corporate name change is a structural adjustment for the Delaware corporation and does not alter existing agreements, obligations, or ownership.
AirPro News analysis
The transition from Neura Defense Systems to Volantyx Aerospace signals a strategic pivot to capture dual-use commercial and defense markets. As autonomous UAS capabilities proliferate, the reliance on RF jamming and detection is becoming a recognized vulnerability in airspace security. By focusing on multi-modal physical signatures, we view Volantyx’s approach as a necessary evolution in counter-UAS architecture. The company’s explicit acknowledgment that it lacks fielded deployments or contract awards underscores the significant gap between conceptual architecture and operational validation. The early 2027 target for effector manufacturing will be a critical milestone to monitor as the company attempts to transition from a development-stage startup to an active aerospace supplier.
Photo Credit: Neura Defense Systems, Inc.
Defense & Military
Lockheed Martin Offers Peru $1.8B F-16 Block 70 Offset Package
Lockheed Martin proposes a $1.8B industrial package for Peru’s F-16 Block 70 program, including UAS assembly and MRO expansion.

Lockheed Martin has outlined a $1.8 billion industrial and social collaboration package for Peru, designed to integrate local firms into the global aerospace supply chain as part of the country’s F-16 Block 70 procurement program.
Announced in a press release on August 26, 2026, the offset proposal follows the Peruvian government’s April 2026 decision to acquire an initial batch of 12 F-16 Block 70 aircraft. The comprehensive package aims to position Peru as a regional hub for advanced unmanned systems and aerospace services.
Expanding Peru’s aerospace industrial base
The proposed industrial agreement focuses heavily on technology transfer and domestic manufacturing. Key components include the domestic assembly of an Unmanned Aircraft System (UAS) tailored for the Latin American market, the establishment of joint research hubs, and the creation of a UAS Technical Institute. The package also outlines plans to expand Peru’s high-tech maintenance, repair, and overhaul (MRO) footprint.
“As we collaborate with the local industry, we aim to deliver tangible, high-value opportunities that build a skilled workforce, enable knowledge transfer and create lasting economic impact on both sides of the partnership,” said Tara Lause, Vice President of Business Development for the Integrated Fighter Group at Lockheed Martin.
Lause added that the procurement creates enduring alliances and industrial collaboration opportunities with the United States and other partner nations.
Fleet modernization and electronic warfare capabilities
Peru is currently working to replace its aging fleet of Soviet-era MiG-29s and French Mirage 2000s. The F-16 Block 70 was selected over competing bids from Saab and Dassault. To equip the new fleet, the government of Peru selected L3Harris Technologies to provide its AN/ALQ-254(V)1 Viper Shield all-digital electronic warfare suite, a decision announced on August 17, 2026. The Viper Shield system provides advanced radar warning and jamming capabilities.
Lockheed Martin noted that the F-16 is currently operated by 29 countries, with a global fleet of 2,800 aircraft. Mike Shoemaker, Vice President of the Integrated Fighter Group at Lockheed Martin, stated that the selection highlights the aircraft’s operational performance and ability to meet pressing defense requirements.
AirPro News analysis
The announcement of a $1.8 billion industrial offset package is a strategic move by Lockheed Martin to solidify the F-16 Block 70 sale amid a complex political environment in Lima. While the Peruvian government selected the aircraft in April 2026, regional defense reporting indicates that the procurement process has encountered delays linked to ministerial resignations and defense budget debates. By offering substantial domestic manufacturing opportunities, including UAS assembly and MRO expansion, Lockheed Martin is providing Peruvian leadership with a strong economic justification to finalize the state-to-state contract. We view this comprehensive technology transfer as a critical lever in moving the procurement from selection to a finalized, funded agreement.
Sources: Lockheed Martin
Photo Credit: Lockheed Martin
-
MRO & Manufacturing7 days agoBoeing SPEEA Engineers Reject Contract, Authorize Strike
-
Business Aviation7 days agoFTAI Aviation Closes $2B Warehouse Financing for 2026 SPV
-
Defense & Military5 days agoBoeing Wins $131B IDIQ Contract for F-15 Eagle Crest Program
-
Defense & Military5 days agoSikorsky Names First EU Black Hawk Parts Distribution Center
-
Space & Satellites5 days agoSpaceX Commits $100B to Starbase Louisiana Spaceport
