Defense & Military
NAHEMA Signs Contract for NH90 Block 2 Architecture Study
NAHEMA and NHIndustries initiate a two-year study to upgrade the NH90 helicopter with modular avionics and crewed-uncrewed teaming for future operations.

The NATO agency responsible for the NH90 Helicopters program, NAHEMA, has officially signed a contract with the NHIndustries consortium to initiate the NH90 Block 2 architecture study. According to an official press release from Airbus, this agreement marks a critical step in modernizing the European Military-Aircraft for future operational demands.
The NHIndustries consortium, which comprises Airbus, Leonardo, and GKN Aerospace, will lead the two-year study. The primary objective is to define the structural and technological upgrades necessary to keep the NH90 platform highly effective in the 2040+ operational environment. As noted in the company’s announcement, the Block 2 upgrade will introduce advanced capabilities, including modular Avionics and crewed-uncrewed teaming.
This development comes as the NH90 fleet achieves a significant operational milestone. The aircraft has recently surpassed 500,000 flight hours, underscoring its established presence in global defense operations. By launching the Block 2 study, NATO and participating nations are signaling a long-term commitment to the platform’s continuous evolution.
Scope of the Block 2 Architecture Study
The newly signed contract sets in motion a comprehensive two-year architecture study designed to build upon the technological foundations laid by the ongoing Block 1 program. According to the Airbus press release, the study will focus on delivering critical technical outputs that will allow NAHEMA and member nations to evaluate various design options for the helicopter’s future.
Key improvements targeted in the Block 2 upgrade include enhanced configuration commonality, streamlined maintenance processes, and overall performance boosts. Furthermore, the consortium plans to integrate next-generation battlefield technologies. The official statement highlights that the upgraded aircraft will feature new capabilities in collaborative combat and advanced connectivity, ensuring it can operate seamlessly alongside uncrewed systems.
Alignment with European Defense Initiatives
The Block 2 architecture study will not occur in isolation. The press release notes that the research and design phase will run parallel to the European Next Generation Rotorcraft Technologies (ENGRT) initiatives. Guided by high-level requirements from NAHEMA, this parallel approach ensures that the NH90’s evolution aligns with broader European defense strategies and long-term sovereign capability needs.
Industry Perspectives and Future Readiness
Leadership at Airbus Helicopters views the Block 2 contract as a vital bridge to the future of European vertical lift. The company emphasized that current iterations, such as the Sea Tiger and the NH90 Standard 2, are already serving as benchmarks for tactical and naval operations.
“The NH90 has recently reached 500,000 flight hours, a testimony to its maturity and operational relevance, as well as its continuously upgraded capabilities… The signing of the Block 2 contract now marks a decisive step in ensuring the NH90 remains at the forefront of European defence for decades to come,” said Matthieu Louvot, CEO of Airbus Helicopters, in the official release.
Louvot further noted that Airbus and its consortium partners remain dedicated to evolving the proven platform to meet the demanding challenges of the future battlespace, as NATO nations continue to define their vertical lift requirements.
Strategic Implications
AirPro News analysis
At AirPro News, we observe that the transition toward the Block 2 architecture study represents a crucial stabilization effort for the NH90 program. By focusing heavily on modular avionics, configuration commonality, and improved maintenance, the NHIndustries consortium is directly addressing the lifecycle and operational readiness factors that are paramount to NATO operators. The explicit inclusion of crewed-uncrewed teaming and collaborative combat capabilities indicates that the NH90 is being positioned not just as a legacy transport or naval asset, but as a central node in the digitized, multi-domain battlespace of the 2040s. Running this study in parallel with the ENGRT initiatives suggests a strategic effort to harmonize current fleet upgrades with the next generation of European rotorcraft development, potentially reducing future integration costs and ensuring continuous sovereign defense capabilities.
Frequently Asked Questions
What is the NH90 Block 2 architecture study?
It is a two-year study commissioned by NAHEMA and led by NHIndustries to define the next major upgrade for the NH90 helicopter, focusing on modular avionics, improved maintenance, and crewed-uncrewed teaming for the 2040+ operational environment.
Who Manufacturers the NH90?
The NH90 is manufactured by NHIndustries, a European consortium consisting of Airbus, Leonardo, and GKN Aerospace.
How much flight experience does the NH90 fleet have?
According to the recent Airbus press release, the global NH90 fleet has surpassed 500,000 flight hours.
Sources
Photo Credit: Airbus
Defense & Military
Gripen F Completes Inaugural Flight in Linköping Sweden
Saab and the Brazilian Air Force completed the first flight of the Gripen F two-seat fighter on August 28, 2026.

Saab and the Brazilian Air Force have successfully completed the inaugural flight of the Gripen F, the two-seat variant of the Gripen E fighter, initiating the airborne test campaign for the jointly developed aircraft.
The aircraft took off from Saab’s airfield in Linköping, Sweden, on August 28, 2026. In a press release issued today, the manufacturer confirmed the milestone advances a comprehensive technology transfer program designed to deliver both pilot training and full operational combat capabilities.
Inaugural flight and test campaign
The flight commenced at 09:40 local time and lasted 40 minutes. Saab Chief Test Pilot Jakob Högberg and Brazilian Air Force Test Pilot Lieutenant Colonel Aviator Abdon de Rezende Vasconcelos operated the aircraft.
Lars Tossman, Head of Business Area Aeronautics at Saab, highlighted the collaborative effort behind the milestone.
“This first flight represents an important step forward for both Saab and the Brazilian Air Force. Seeing Gripen F take to the skies is particularly significant for all the Swedish and Brazilian teams whose years of engineering work have helped turn this aircraft into a reality. It is designed to accelerate pilot training while and enhancing operational performance in advanced combat missions,” Tossman said.
The Gripen F test program will now transition into a progressive envelope expansion phase. Saab stated that upcoming flights will clear performance limits, including speed, altitude, G-load, and angle of attack, while evaluating the tactical systems of the independent rear cockpit.
Design specifications and Brazilian procurement
The Gripen F incorporates specific design modifications to accommodate a second crew member. According to Air Data News, the two-seat variant measures 15.9 meters in length, compared to the 15.2-meter single-seat Gripen E, and has a maximum takeoff weight of 16,500 kilograms. To make room for the rear cockpit, engineers omitted the internal 27 mm Mauser BK27 cannon found on the single-seat model. Despite this change, the aircraft retains full operational combat capability and utilizes the same General Electric F414G engine.
The development of the Gripen F is heavily tied to Brazilian defense procurement. Aviation Week reports that the Brazilian Air Force ordered eight Gripen F aircraft as part of a broader 36-aircraft contract signed in 2014. Saab officially presented the first Gripen F during a rollout ceremony in Linköping on June 2, 2026. The manufacturer noted that more than 350 Brazilian engineers, technicians, and pilots have participated in training and development activities for the program.
AirPro News analysis
We view the successful first flight of the Gripen F as a critical validation of the technology transfer agreement between Saab and its Brazilian partners, including Embraer. The integration of a fully combat-capable rear cockpit ensures the Brazilian Air Force can conduct advanced training while maintaining frontline fleet readiness. Delivering the two-seat variant on schedule strengthens Saab’s position in future export campaigns where dual-role trainer and combat aircraft are required.
Sources: Saab
Photo Credit: Saab
Defense & Military
Neura Defense Systems Rebrands as Volantyx Aerospace
Neura Defense Systems rebrands as Volantyx Aerospace to develop counter-UAS tech targeting RF-silent drone swarms.

Saint Petersburg, Florida-based Neura Defense Systems, Inc. announced on August 26, 2026, that it has rebranded as Volantyx Aerospace, Inc. to reflect its expansion from a single-product defense developer into a broader aerospace technology platform.
In a press release issued Wednesday, the company stated the original Neura Defense Systems name will be retained for its defense division and current operating business. The corporate restructuring aligns with the company’s focus on developing a distributed edge-intelligence architecture designed to counter autonomous, radio-frequency-silent drone swarms.
Addressing the RF-silent swarm-drone gap
Volantyx Aerospace is targeting a specific vulnerability in current counter-Unmanned Aircraft Systems (UAS) defense networks. Traditional detection and mitigation rely heavily on radio frequency (RF) signals, which are ineffective against pre-programmed or autonomous aircraft that do not emit such signals.
Founder and Chief Executive Officer Sam Talari explained the limitations of legacy systems in the company’s announcement, noting that the new architecture is built on the assumption that any single sensor can be degraded or absent.
An RF sensor cannot detect a signal that is not there, and a jammer cannot sever a control link that does not exist. We start from the aircraft’s physical signature instead — radar return, sound, heat, visual — and combine those into one track and one decision picture for the operator.
The company has filed 13 United States provisional patent applications covering multi-modal sensor fusion, distributed networking, cognitive command, and the detection of non-emitting aircraft. The resulting intelligence layer is designed to make decisions at the edge without cloud dependency while preserving a record of system observations.
Development timeline and market positioning
The rebranding occurs as federal investment in counter-UAS technologies accelerates. Volantyx Aerospace remains in the development stage, with its core capabilities currently undergoing hardware integration and field evaluation following initial tests in a controlled environment.
The company clarified in its release that it does not yet claim a fielded deployment, operational performance metrics, or a contract award. Volantyx Aerospace plans to begin manufacturing or supplying effectors in early 2027. The corporate name change is a structural adjustment for the Delaware corporation and does not alter existing agreements, obligations, or ownership.
AirPro News analysis
The transition from Neura Defense Systems to Volantyx Aerospace signals a strategic pivot to capture dual-use commercial and defense markets. As autonomous UAS capabilities proliferate, the reliance on RF jamming and detection is becoming a recognized vulnerability in airspace security. By focusing on multi-modal physical signatures, we view Volantyx’s approach as a necessary evolution in counter-UAS architecture. The company’s explicit acknowledgment that it lacks fielded deployments or contract awards underscores the significant gap between conceptual architecture and operational validation. The early 2027 target for effector manufacturing will be a critical milestone to monitor as the company attempts to transition from a development-stage startup to an active aerospace supplier.
Photo Credit: Neura Defense Systems, Inc.
Defense & Military
Lockheed Martin Offers Peru $1.8B F-16 Block 70 Offset Package
Lockheed Martin proposes a $1.8B industrial package for Peru’s F-16 Block 70 program, including UAS assembly and MRO expansion.

Lockheed Martin has outlined a $1.8 billion industrial and social collaboration package for Peru, designed to integrate local firms into the global aerospace supply chain as part of the country’s F-16 Block 70 procurement program.
Announced in a press release on August 26, 2026, the offset proposal follows the Peruvian government’s April 2026 decision to acquire an initial batch of 12 F-16 Block 70 aircraft. The comprehensive package aims to position Peru as a regional hub for advanced unmanned systems and aerospace services.
Expanding Peru’s aerospace industrial base
The proposed industrial agreement focuses heavily on technology transfer and domestic manufacturing. Key components include the domestic assembly of an Unmanned Aircraft System (UAS) tailored for the Latin American market, the establishment of joint research hubs, and the creation of a UAS Technical Institute. The package also outlines plans to expand Peru’s high-tech maintenance, repair, and overhaul (MRO) footprint.
“As we collaborate with the local industry, we aim to deliver tangible, high-value opportunities that build a skilled workforce, enable knowledge transfer and create lasting economic impact on both sides of the partnership,” said Tara Lause, Vice President of Business Development for the Integrated Fighter Group at Lockheed Martin.
Lause added that the procurement creates enduring alliances and industrial collaboration opportunities with the United States and other partner nations.
Fleet modernization and electronic warfare capabilities
Peru is currently working to replace its aging fleet of Soviet-era MiG-29s and French Mirage 2000s. The F-16 Block 70 was selected over competing bids from Saab and Dassault. To equip the new fleet, the government of Peru selected L3Harris Technologies to provide its AN/ALQ-254(V)1 Viper Shield all-digital electronic warfare suite, a decision announced on August 17, 2026. The Viper Shield system provides advanced radar warning and jamming capabilities.
Lockheed Martin noted that the F-16 is currently operated by 29 countries, with a global fleet of 2,800 aircraft. Mike Shoemaker, Vice President of the Integrated Fighter Group at Lockheed Martin, stated that the selection highlights the aircraft’s operational performance and ability to meet pressing defense requirements.
AirPro News analysis
The announcement of a $1.8 billion industrial offset package is a strategic move by Lockheed Martin to solidify the F-16 Block 70 sale amid a complex political environment in Lima. While the Peruvian government selected the aircraft in April 2026, regional defense reporting indicates that the procurement process has encountered delays linked to ministerial resignations and defense budget debates. By offering substantial domestic manufacturing opportunities, including UAS assembly and MRO expansion, Lockheed Martin is providing Peruvian leadership with a strong economic justification to finalize the state-to-state contract. We view this comprehensive technology transfer as a critical lever in moving the procurement from selection to a finalized, funded agreement.
Sources: Lockheed Martin
Photo Credit: Lockheed Martin
-
Technology & Innovation6 days agoSkyband Systems M100 LRU Validates GNSS Jamming Protection
-
MRO & Manufacturing6 days agoBoeing SPEEA Engineers Reject Contract, Authorize Strike
-
Military Technology6 days agoSaab Unveils A3-001 Supersonic Stealth Drone Concept
-
Business Aviation5 days agoFTAI Aviation Closes $2B Warehouse Financing for 2026 SPV
-
Business Aviation6 days agoSyberJet SJ30-2 Sets Transcontinental Speed Record
