Defense & Military

Firehawk Aerospace Expands Rocket Motor Production in Mississippi Facility

Firehawk Aerospace acquires a DCMA-rated facility in Mississippi to boost production of solid rocket motors using 3D-printing technology.

Published

on

This article is based on an official press release from Firehawk Aerospace.

Firehawk Aerospace Acquires Mississippi Facility to Scale Rocket Motor Production

On December 19, 2025, Firehawk Aerospace announced a significant expansion of its manufacturing capabilities with the acquisition of a specialized defense facility in Crawford, Mississippi. The Dallas-based defense technology company has secured a 20-year lease on the 636-acre site, which was formerly operated by Nammo Talley.

This acquisition marks a strategic pivot for Firehawk as it moves to address critical shortages in the U.S. defense supply chain. By taking over a facility that is already rated by the Defense Contract Management Agency (DCMA), the company aims to bypass the lengthy construction and certification timelines typically associated with greenfield defense projects. The site will serve as a hub for the full-system integration of solid rocket motors (SRMs), complementing the company’s existing R&D operations in Texas and energetics production in Oklahoma.

Strategic Asset Details

The Crawford facility is located in Lowndes County within Mississippi’s “Golden Triangle” region. According to the company’s announcement, the site is a “turnkey” defense asset designed specifically for handling high-grade explosives and munitions. The infrastructure includes assembly bays protected by one-foot-thick concrete walls and safety “blowout” walls designed to contain accidental detonations.

Because the facility was previously used by Nammo Defense Systems for the high-volume assembly of shoulder-launched munitions, such as the M72 LAW and SMAW systems, it retains the necessary regulatory certifications to allow for rapid operational ramp-up. Firehawk Aerospace CEO Will Edwards emphasized the urgency of this expansion in a statement regarding the deal.

“This acquisition strengthens Firehawk’s ability to address one of the nation’s most urgent defense challenges: rebuilding munition inventories that have been drawn down faster than they can be replaced.”

, Will Edwards, Co-founder and CEO of Firehawk Aerospace

Addressing the “Rocket Motor Crisis”

The acquisition comes at a time when the Western defense industrial base is grappling with a severe shortage of solid rocket motors, which power critical systems like the Javelin, Stinger, and GMLRS missiles. Traditional manufacturing methods, which involve casting propellant in large batches that take weeks to cure, have created production bottlenecks.

Firehawk Aerospace intends to disrupt this model by utilizing proprietary 3D-printing technology to manufacture propellant grains. According to the press release, this additive manufacturing approach reduces production times from weeks to hours. The company has explicitly stated that the new Mississippi facility is being designed to achieve a production tempo of “thousands of rockets per month,” a significant increase over legacy industry standards.

Advertisement

“While the current industrial base is built to produce thousands of rockets per year, we are building this site… to operate at a much higher production tempo… designing for throughput measured in thousands per month, not years.”

, Will Edwards, CEO

Regional Economic Impact

The expansion is expected to bring skilled jobs to the Golden Triangle region, which is increasingly becoming a hub for aerospace and defense activity. Mississippi Governor Tate Reeves welcomed the investments, noting the dual benefits of economic growth and national security support.

“Their acquisition in Crawford will bring skilled jobs to the region while directly contributing to the production capacity our nation needs.”

, Tate Reeves, Governor of Mississippi

AirPro News Analysis

From R&D to Mass Production: This acquisition signals Firehawk’s transition from a development-focused startup to a volume manufacturer. By securing a pre-rated facility, Firehawk has effectively shaved 2–3 years off its timeline, the period typically required to build and certify a new explosives handling site. This speed is critical given the current geopolitical demand for tactical munitions.

Supply Chain Decentralization: The move also highlights a strategy of decentralization. By distributing operations across Texas (R&D), Oklahoma (Energetics), and now Mississippi (Integration), Firehawk is building a supply chain that may prove more resilient than centralized legacy models. This geographic diversity also allows the company to tap into distinct labor markets and state-level incentives, such as Mississippi’s aerospace initiatives.

Frequently Asked Questions

What is the significance of the DCMA rating?
A DCMA (Defense Contract Management Agency) rating verifies that a facility meets strict Department of Defense quality and safety standards. Acquiring a pre-rated facility allows Firehawk to begin production much faster than if they had to build and certify a new site from scratch.

How does Firehawk’s technology differ from traditional methods?
Traditional solid rocket motors are cast in large batches, a process that requires weeks for the propellant to cure. Firehawk uses 3D-printing technology to print propellant grains, which allows for custom geometries and reduces the manufacturing time to mere hours.

What was the facility used for previously?
The facility was formerly operated by Nammo Talley (now Nammo Defense Systems) for the assembly of shoulder-launched munitions, including the M72 LAW and SMAW systems.

Advertisement

Sources

Photo Credit: Firehawk Aerospace

Leave a ReplyCancel reply

Popular News

Exit mobile version